Skip to content
PlanIndex Get alerts
Menu

Planning application

Flat 2/1 15 Lynedoch Crescent Glasgow G3 6EQ

Granted Glasgow City 26/01003/LBA

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Internal alterations to flatted dwelling.

As published by the council, reference 26/01003/LBA

Application record

Reference
26/01003/LBA
Status
Decided - Grant Subject to Condition(s)
Decision
Granted As published: Grant Subject to Condition(s)
Received
11 May 2026
Validated
3 Jun 2026
Ward
Hillhead
Postcode
G3 6EQ

Site history

Applications at this address on the Glasgow City register

This site has had 3 applications since 2020: 1 approved, 2 refused.

  • 20/00269/LBA Refused

    Flat 2/1 15 Lynedoch Crescent Glasgow G3 6EQ

    Internal and external alterations

    Decided 23 Apr 2020 Heritage and listed buildings
  • 20/00268/FUL Refused

    Flat 2/1 15 Lynedoch Crescent Glasgow G3 6EQ

    Formation of two dormer windows to rear elevation and external alterations.

    Decided 23 Apr 2020 Full applications

Timeline

Dates from the published record

  1. 11 May 2026

    Received by Glasgow City

  2. 3 Jun 2026

    Validated

    Checked as complete and ready for consideration.

  3. 28 Jul 2026

    Added to PlanIndex

  4. 23 Aug 2026

    Status changed to Decided - Grant Subject to Condition(s)

    Previously Pending - Consideration.

Documents

Plans, drawings, consultee responses and the officer's report

9 documents on file for this application

  • REPORT OF HANDLING Report of Handling · 29 Jul 2026
  • PLANS AND SECTIONS AS EXIST AND AS PROP Drawing · 03 Jun 2026
  • PHOTOGRAPHIC INVENTORY Other · 03 Jun 2026
  • SECOND FLOOR PLAN AS PROPOSED Drawing · 11 May 2026
  • THIRD FLOOR PLAN AS PROPOSED Drawing · 11 May 2026
  • SECOND FLOOR PLAN AS EXISTING Drawing · 11 May 2026
  • THIRD FLOOR PLAN AS EXISTING Drawing · 11 May 2026
  • APPLICATION PDF Application Form · 11 May 2026
  • A LOCATION PLAN Drawing · 11 May 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Glasgow City granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About this record

The published feed does not state which type of application this is; the register entry on Glasgow City's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles