Skip to content
PlanIndex Get alerts
Menu

Planning application

City Chambers 80 George Square Glasgow G2 1DU

Granted Glasgow City 25/02970/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

External alterations to west elevation, with remedial works to masonry and sculptures, stone cleaning, installation of leadworks, and associated works.

As published by the council, reference 25/02970/FUL

Application record

Reference
25/02970/FUL
Type
Full Planning Permission
Status
Decided - Grant Subject to Condition(s)
Decision
Grant Subject to Condition(s)
Received
24 Dec 2025
Validated
24 Dec 2025
Decided
26 Feb 2026
Ward
Anderston/City/Yorkhill
Parish
Merchant City & Trongate
Decision by
Delegated
Postcode
G2 1DU

Timeline

Dates from the published record

  1. 24 Dec 2025

    Received by Glasgow City

  2. 26 Feb 2026

    Decision issued: Grant Subject to Condition(s)

  3. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

49 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • City Chambers 80 George Square Glasgow G2 1DU

    25/02969/LBA Submitted 24 Dec 2025 0m away

    External alterations to west elevation, with remedial works to masonry and sculptures, stone cleaning, installation of leadworks, and associated works.

    Granted Heritage and listed buildings 51 docs
  • City Chambers 80 George Square Glasgow G2 1DU

    26/00935/FUL Submitted 1 May 2026 0m away

    89% historically approved · decision due ~26 Jun

    External alterations, with re-roofing, installation of replacement rooflights and lanterns, leadworks, repointing to chimneys, and associated repair works.

    Awaiting decision Full applications Loft or dormer
  • City Chambers 80 George Square Glasgow G2 1DU

    26/00932/LBA Submitted 1 May 2026 0m away

    96% historically approved · decision due ~26 Jun

    External alterations, with re-roofing, installation of replacement rooflights and lanterns, leadworks, repointing to chimneys, and associated repair works.

    Awaiting decision Heritage and listed buildings Loft or dormer
  • Site Outside 42A Baird Street Glasgow

    18/03120/ADV Submitted 23 Oct 2018 45m away

    Display of 2no. non illuminated advance signs fixed to posts ##WITHDRAWN##

    Withdrawn Advertising 4 docs
  • Site Opposite 40 Baird Street Glasgow

    20/02804/ADV Submitted 27 Oct 2020 66m away

    Display of replacement double-sided free-standing digital advertising unit

    Refused Advertising
  • Site To The North Of 42A Baird Street Glasgow

    18/03266/MSC Submitted 2 Nov 2018 75m away

    Demolition of existing footbridge, and erection of a new pedestrian and cycle bridge with associated path connections, landscaping, lighting and drainage, Approval of Matters Specified in Conditions of planning permission in principle 13/01625/DC.

    Granted Conditions Demolition 82 docs

In Glasgow City

  • 26/01858/FUL Awaiting decision

    10 Fifth Avenue Glasgow G12 0AT

    Erection of two storey side, upper floor rear and front entrance porch extensions, formation of dormer window to front of dwellinghouse and external alterations.

    1 Sep 2026 Full applications
  • 26/01864/FUL Awaiting decision

    Flat 0/2 407 Carmunnock Road Glasgow G45 9RE

    Installation of access ramp to front of flatted property

    28 Aug 2026 Full applications
  • 26/01844/FUL Awaiting decision

    11 University Gardens Glasgow G12 8QH

    Installation of plant

    26 Aug 2026 Full applications
  • 26/00481/FUL Withdrawn

    Site At Amulree Recreation Area/ Amulree Street Glasgow

    Erection of community hub formation of 3G artificial football pitch, floodlighting, vehicular access, parking, floodlighting and associated works.

    9 Mar 2026 Full applications
  • 26/01842/FUL Awaiting decision

    Site To The East Of 14 Dundasvale Court Glasgow

    Erection of cycle store

    25 Aug 2026 Full applications