Planning application

2 Herriet Street Glasgow

Granted Glasgow City 25/01858/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Replacement guttering and installation of downpipe.

As published by the council, reference 25/01858/FUL

Application record

Reference
25/01858/FUL
Type
Full Planning Permission
Status
Decided - Grant Subject to Condition(s)
Decision
Granted As published: Grant Subject to Condition(s)
Received
11 Aug 2025
Validated
30 Sep 2025
Decided
28 Nov 2025
Ward
Pollokshields
Parish
Pollokshields
Decision by
Delegated

Timeline

Dates from the published record

  1. 11 Aug 2025

    Received by Glasgow City

  2. 30 Sep 2025

    Validated

    Checked as complete and ready for consideration.

  3. 28 Nov 2025

    Decision issued: Grant Subject to Condition(s)

  4. 6 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

15 documents on file for this application

  • DOCUMENT Other · 04 Dec 2025
  • DOCUMENT Other · 04 Dec 2025
  • REPORT OF HANDLING Report of Handling · 01 Dec 2025
  • DRAWING DEMONSTRATING EXISTING AND PROPOSED GUTTERING Drawing · 30 Sep 2025
  • ELEVATION SHOWING WHERE PROPOSED DOWNSPOUT WILL BE LOCATED Drawing · 30 Sep 2025
  • ELEVATION SHOWING WHERE THE INTERNAL DOWNSPOUT IS LOCATED Drawing · 30 Sep 2025
  • PLAN SHOWING EXTENT OF GUTTER INSTALLATION Drawing · 30 Sep 2025
  • LOCATION PLAN OUTLINED Drawing · 30 Sep 2025
  • NOTIFICATION LIST - NEIGHBOURS Notification List · 30 Sep 2025
  • PHOTO OF BUILDING EXTERIOR SHOWING WATER INGRESS DAMAGE FROM INTERNAL DOWNSPOUT Photo · 02 Sep 2025
  • PHOTO OF BUILDING INTERIOR SHOWING WHERE INTERNAL DOWNSPOUT HAS FAILED AND RESUL Photo · 02 Sep 2025
  • SHOWING INTERNAL DAMAGE WHERE INTERNAL DOWNSPOUT IS FAILING Photo · 02 Sep 2025
  • PHOTO OF BUILDING INTERIOR IN TOP FLOOR FLAT SHOWING WHERE DOWNSPOUT HAS FAILED Photo · 02 Sep 2025
  • PHOTO OF BUILDING EXTERIOR SHOWING WHERE DOWNSPOUT WILL BE LOCATED Photo · 02 Sep 2025
  • FULL PLANNING APPLICATION Application Form · 11 Aug 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What this grant of permission means

Glasgow City granted permission on 28 November 2025, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

In Glasgow City

  • 26/02254/FUL Awaiting decision

    6 Cayton Gardens Glasgow G69 7LF

    Erection of outbuilding to rear of dwellinghouse.

    Received 13 Oct, published by the council 23 Oct 2026 Full applications
  • 26/02233/FUL Awaiting decision

    48 Kingslynn Drive Glasgow G44 4JA

    Erection of two storey extension to side of dwellinghouse.

    Received 12 Oct, published by the council 21 Oct 2026 Full applications
  • 26/02210/FUL Awaiting decision

    5 Aylmer Road Glasgow G43 2JN

    Erection of outbuilding to rear and formation of French doors to rear of dwellinghouse

    Received 8 Oct, published by the council 19 Oct 2026 Full applications
  • 26/02209/FUL Awaiting decision

    2 Penston Road Glasgow G33 4AG

    Formation of hardstanding, installation of drainage infrastructure and external LED lighting and associated works.

    Received 8 Oct, published by the council 21 Oct 2026 Full applications
  • 26/02200/FUL Awaiting decision

    22 Sandgate Avenue Glasgow G32 9PB

    Alterations to roof of domestic garage associated with conversion to habitable accommodation

    Received 7 Oct, published by the council 19 Oct 2026 Full applications