Skip to content
PlanIndex Get alerts
Menu

Planning application

Site Bounded By Howard Street/ King Street/Osborne Street/Stockwell Street/ Bridgegate Glasgow

Awaiting decision Glasgow City 25/01782/PPP Planning Permission in Principle

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of mixed use development (in principle), comprising residential (Build to Rent, Co-Living, Class 9 and Sui Generis), purpose built student accommodation (Sui Generis), office and business, hotel and hostel, shops, financial, professional, commercial uses, restaurant and public house, residential institutions and non-residential institutions, assembly and leisure, with associated car parking, access, landscaping, public realm and engineering / infrastructure works.

As published by the council, reference 25/01782/PPP

Application record

Reference
25/01782/PPP
Type
Planning Permission in Principle
Status
Pending - Consideration
Received
1 Aug 2025
Validated
7 Aug 2025
Ward
Anderston/City/Yorkhill
Parish
Merchant City & Trongate

Timeline

Dates from the published record

  1. 1 Aug 2025

    Received by Glasgow City

  2. 7 Aug 2025

    Validated

    Checked as complete and ready for consideration.

  3. 26 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 October 2025, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Glasgow City took a median of 78 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

66 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Glasgow City for determination, against a statutory target of eight weeks. Over the last year Glasgow City's median decision took 78 days. More in our guide to how long planning decisions take.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

In Glasgow City

  • 25/00069/PPP Awaiting decision

    145 Elliot Street Glasgow G3 8EX

    Erection of mixed-use development including residential (sui generis); student accommodation (sui generis); and/or co-living (sui generis), with ancillary commercial space with potential for shops, financial, professional and other services (Class 1A); food and drink (Class 3), Business (Class 4), and Assembly and Leisure (Class 11) uses and formation of landscaping/public realm; access; car parking and associated works.

    15 Jan 2025 Outline
  • 19/00987/PPP Granted

    Site To The Rear Of And Including 301A Auchinairn Road Glasgow

    Erection of residential development and associated works: Potentially Contrary to Policy CDP6 of the City Development Plan.

    28 Mar 2019 Outline
  • 21/01995/PPP Granted

    Site Adjacent To 387 Helen Street Glasgow

    Erection of commercial development (in principle) to vacant site, comprising coffee shop with drive through (hybrid Class 1/ Class 3/Sui Generis Uses) and restaurant unit with drive through (hybrid Class 1/ Class 3 Sui Generis Uses), access, car parking, landscaping, engineering and ancillary works.

    18 Jun 2021 Outline
  • 21/03803/PPP Granted

    Site Bounded By Carrick Street/Crimea Street/ Brown Street Glasgow

    Erection of office development (Class 4) (in principle), with associated works

    20 Dec 2021 Outline
  • 20/01252/PPP Granted

    Site Adjacent To 90 Carlisle Street Glasgow

    Erection of residential development (up to 300 units), and commercial / industrial units (up to 1,500 sq m gross floor area, Classes 1, 2, 3, 4 and 5), with associated access, infrastructure and landscaping.

    11 May 2020 Outline