Planning application
Site To The East Of 16 Havannah Street Glasgow
Works: New dwelling
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of purpose-built student accommodation (Sui generis) and flatted residential development (Sui generis) including amenity, erection of pavilion with arts hub, community use and public events (Class 10/ Class 11) with associated open space, includes access, ground reprofiling and landscaping, with associated works.
As published by the council, reference 24/02272/FUL
Application record
- Reference
- 24/02272/FUL
- Category
- Full applications
- Status
- Unknown
- Decision
- Granted As published: Granted Subject to Condition and S75
- Received
- 12 Sep 2024
- Validated
- 3 Oct 2024
- Ward
- Calton
Timeline
Dates from the published record
-
12 Sep 2024
Received by Glasgow City
-
3 Oct 2024
Validated
Checked as complete and ready for consideration.
-
4 Oct 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Glasgow Enlightenment Ltd Applicant, registered in Glasgow
Active · incorporated 2024 · Glasgow
1 application on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
224 documents on file for this application
- REPORT OF HANDLING
- ADAPTABILITY STATEMENT
- PHASING PLAN
- DREAM PARK DESIGN STATEMENT_REVISED
- DREAM PARK: EXISTING SITE PLAN
- DREAM PARK: LANDSCAPE PLAN
- DREAM PARK: LOCATION PLAN
- ADDITIONAL FULL PLANNING APPLICATION
- DREAM PARK: PROPOSED AXONOMETRIC
- DREAM PARK: PROPOSED BLOCK PLAN
- DREAM PARK: PROPOSED ELEVATIONS
- DREAM PARK: PROPOSED GROUND FLOOR PLAN
- DREAM PARK: PROPOSED ROOF PLAN
- DREAM PARK: PROPOSED SECTIONS
- DREAM PARK: PROPOSED SITE PLAN
- ROOF GARDEN LAYOUT - PBSA & BTR
- CGI - VIEW FROM DUKE STREET (REV 3)
- CGI - VIEW FROM HUNTER STREET (REV 5)
- ADDITIONAL FULL PLANNING APPLICATION
- PROPOSED ELEVATIONS NORTH
- PROPOSED ELEVATIONS SOUTH
- ADDITIONAL DRAWINGS
- ADDITIONAL FULL PLANNING APPLICATION
- DETAIL LAYOUT SHEET 1
- DETAIL LAYOUT SHEET 2
- REVISED ILLUSTRATIVE LAYOUT
- LANDSCAPE LAYOUT
- LANDSCAPE SECTIONS_SHEET 1
- LANDSCAPE SECTIONS_SHEET 2
- LANDSCAPE SECTIONS_SHEET 3
- LANDSCAPE SECTIONS_SHEET 4
- BLOCK B (BTR): PROPOSED ELEVATIONS NORTH AND EAST
- BLOCK B (BTR): PROPOSED ELEVATIONS NORTH WEST AND SOUTH WEST
- BLOCK B (BTR): PROPOSED ELEVATIONS SOUTH AND WEST
- PROPOSED FIRST FLOOR PLAN
- PROPOSED GROUND FLOOR PLAN
- BLOCK B (BTR): PROPOSED SECTIONS
- SITE PLAN: PROPOSED
- DRAINAGE STRATEGY REPORT PART 1 OF 6_REVISED
- DRAINAGE STRATEGY REPORT PART 2 OF 6_REVISED
- DRAINAGE STRATEGY REPORT PART 3 OF 6_REVISED
- DRAINAGE STRATEGY REPORT PART 4 OF 6_REVISED
- DRAINAGE STRATEGY REPORT PART 5 OF 6_REVISED
- DRAINAGE STRATEGY REPORT PART 6 OF 6_REVISED
- ADDITIONAL LISTED BUILDING APPLICATION
- PROPOSED FIRE SERVICE VEHICLE ACCESS AND FIRE HYDRANT PROVISIONS
- SWEPT PATH ANALYSIS - FIRE TENDER AERIAL APPLIANCE
- SWEPT PATH ANALYSIS - FIRE TENDER
- LANDSCAPING SAFETY STRATEGY
- SUPERSEDED - PROPOSED GROUND FLOOR PLAN
- DAYLIGHT AND SUNLIGHT STUDY
- ADDITIONAL FULL PLANNING APPLICATION
- SUPERSEDED - PROPOSED CONTEXT ELEVATIONS
- PROPOSED EIGHTH FLOOR PLAN
- PROPOSED ELEVATIONS COURTYARD EAST AND WEST
- SUPERSEDED - PROPOSED ELEVATIONS SOUTH AND WEST
- PROPOSED ELEVATIONS SOUTH
- PROPOSED ELEVENTH FLOOR PLAN
- SUPERSEDED - PROPOSED FIRST FLOOR PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED NINTH FLOOR PLAN
- PROPOSED ROOF PLAN
- PROPOSED SECOND TO SIXTH FLOOR PLAN
- PROPOSED SEVENTH FLOOR PLAN
- PROPOSED TENTH FLOOR PLAN
- JAMES PATTERSON
- JAN LIETAVA
- MS TESSA RATUSZYNSKA-FLAT 3/4, 51 CARNOUSTIE STREET, GLASGOW G5 8PN-OBJECTS(FULL
- MR JACK BUTTERFIELD-3/2 HERIOT BRIDGE, EDINBURGH EH1 2HR-OBJECTS(FULL)
- JOHN TAYLOR
- PATRICK FORD
- JOSEPH MADDEN
- COLIN MACKENZIE
- CHRIS HUMPHREY
- KEIRA MCCOMBIE
- MR TOBIAS BELBER-FLAT 2/4, 31 LA CROSSE TERRACE, GLASGOW G12 8EX-OBJECTS(FULL)
- LINDA CORMACK
- GARY MCKENNA
- JEAN JACKSON
- MR MATTHEW COSSLETT-FLAT 1/1, 34 ANNETTE STREET, GLASGOW G42 8EQ-OBJECTS(FULL)
- MISS BOSCO IACOBUCCI-179 GREENHEAD STREET, GLASGOW G41 1HX-OBJECTS(FULL)
- MS LYDIA HARTSHORN-79 GILBY HOUSE, LONDON E9 6HU-OBJECTS(FULL)
- NUSA C PARINUSSA-FLAT 2/2, 5 CUDDIES WALK, GLASGOW G4 0FD-OBJECTS(FULL)
- MATT LYGATE
- LUCIUS RAY
- KEIRA MCCOMBIE
- JANE SILLARS
- MR JAMIE BOLLAND-FLAT 2/2, 10 DRYBURGH GARDENS, GLASGOW G20 6BT-OBJECTS(FULL)
- MISS MAYA KJAERULFF-FLAT 2/1, 6 BARRINGTON DRIVE, GLASGOW G4 9DT-OBJECTS(FULL)
- MR KAYA ERDINC-156 GREAT WESTERN ROAD, GLASGOW G4 9AE-OBJECTS(FULL)
- CALTON COMMUNITY COUNCIL
- CALTON COMMUNITY COUNCIL
- MR BRIAN TIMMS-FLAT 4/1, 208 HUNTER STREET, GLASGOW G4 0UP-OBJECTS(FULL)
- MISS RIAH NAIEF-210 HUNTER STREET, GLASGOW G4 0UP-OBJECTS(FULL)
- MR GARY MCLELLAND-FLAT 4/3, 3 DUKE WYND, GLASGOW G4 0WX-OBJECTS(FULL)
- MISS JANE SILLARS-FLAT 3/1, 208 HUNTER STREET, GLASGOW G4 0UP-OBJECTS(FULL)
- LISTEN GALLERY
- MS CAITLIN LONGMAN-FLAT 4/1, 3 DUKE WYND, GLASGOW G4 0WX-OBJECTS(FULL)
- MR ANDREW WHITEHOUSE-FLAT 2/3, 1 DUKE WYND, GLASGOW G4 0WX-OBJECTS(FULL)
- NIALL TESSIER-LAVIGNE-FLAT 2/1, 318 ALLISON STREET, GLASGOW G42 8HQ-OBJECTS(FULL
- ELIZA MEAD
- MR LEWIS CASSIDY-FLAT 2/1, 120 DUKE STREET, GLASGOW G4 0XW-OBJECTS(FULL)
- EZRA BERRNICO
- AMAKA OBIOMA
- MELINE GANGLOFF
- GEORGE KYPRIDEMOS
- EXISTING TOPOGRAPHICAL SURVEY_
- DREAM PARK: PROPOSED GROUND FLOOR PLAN
- DREAM PARK: PROPOSED ROOF PLAN
- DREAM PARK: PROPOSED SECTIONS
- DREAM PARK: PROPOSED ELEVATIONS
- CGI_COURTYARD VIEW
- CGI_PARK VIEW FROM SOUTH
- CGI_PARK VIEW FROM WEST
- SUPERSEDED - CGI_VIEW FROM DUKE STREET
- CGI_AERIAL VISUALISATION SOUTH EAST
- CGI_AERIAL VISUALISATIONS NORTH EAST
- SUPERSEDED - CGI_STREETSCAPE VISUALISATION_VIEW FROM HUNTER STREET BRIDGE
- NOTIFICATION LIST - NEIGHBOURS
- ARCHAEOLOGICAL ASSESSMENT
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 01
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 02
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 03
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 04
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 05
- HERITAGE, TOWNSCAPE & VISUAL IMPACT ASSESSMENT PART 06
- NOISE IMPACT ASSESSMENT
- APPLICATION FOR FULL PLANNING PERMISSION
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 01
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 10
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 11
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 12
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 13
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 14
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 15
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 16
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 17
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 18
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 19
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 02
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 20
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 21
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 23
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 03
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 04
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 05
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 06
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 07
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 08
- GEO-ENVIRONMENTAL DESK STUDY REPORT PART 09
- APPLICATION FOR FULL PLANNING PERMISSION
- AERIAL VISUALISATIONS NORTH EAST
- AERIAL VISUALISATIONS SOUTH EAST
- BLOCK A PROPOSED ELEVATIONS COURTYARD EAST AND WEST
- BLOCK A (PBSA): PROPOSED ELEVATIONS NORTH AND EAST
- BLOCK A (PBSA): PROPOSED ELEVATIONS SOUTH AND WEST
- BLOCK A (PBSA): PROPOSED SECTIONS
- BLOCK B PROPOSED ELEVATIONS NORTH AND EAST
- BLOCK B PROPOSED ELEVATIONS NORTH-WEST AND SOUTH-WEST
- BLOCK B PROPOSED ELEVATIONS SOUTH AND WEST
- BLOCK B PROPOSED SECTIONS
- BREEAM ECOLOGICAL ASSESSMENT
- DESIGN AND ACCESS STATEMENT PART 1 OF 7
- DESIGN AND ACCESS STATEMENT PART 2 OF 7
- DESIGN AND ACCESS STATEMENT PART 3 OF 7
- DESIGN AND ACCESS STATEMENT PART 4 OF 7
- DESIGN AND ACCESS STATEMENT PART 5 OF 7
- DESIGN AND ACCESS STATEMENT PART 6 OF 7
- DESIGN AND ACCESS STATEMENT PART 7 OF 7
- DETAIL LAYOUT SHEET 1
- DETAIL LAYOUT SHEET 2
- DRAINAGE IMPACT ASSESSMENT
- DRAINAGE STRATEGY REPORT PART 1 OF 3
- DRAINAGE STRATEGY REPORT PART 2 OF 3
- DRAINAGE STRATEGY REPORT PART 3 OF 3
- DREAM PARK DESIGN STATEMENT PART 2
- DREAM PARK DESIGN STATEMENT
- DREAM PARK EXISTING SITE PLAN
- DREAM PARK LANDSCAPE PLAN
- DREAM PARK LOCATION PLAN
- DREAM PARK PROPOSED AXONOMETRIC
- DREAM PARK PROPOSED BLOCK PLAN
- DREAM PARK PROPOSED GROUND FLOOR PLAN
- DREAM PARK PROPOSED ROOF PLAN
- DREAM PARK PROPOSED SITE PLAN
- EIA SCREENING REQUEST AND OPINION
- ENERGY STATEMENT
- EXISTING CONTEXT ELEVATIONS
- SUPERSEDED - ILLUSTRATIVE LAYOUT
- LANDSCAPE DESIGN AND ACCESS STATEMENT
- SUPERSEDED - LANDSCAPE LAYOUT
- SUPERSEDED - LANDSCAPE SECTIONS - SHEET 2
- SUPERSEDED - LANDSCAPE SECTIONS SHEET 1
- SUPERSEDED - LANDSCAPE SECTIONS SHEET 2
- SUPERSEDED - LANDSCAPE SECTIONS SHEET 3
- LOCATION PLAN
- MANAGEMENT AND SECURITY STRATEGY
- PAC REPORT - APPENDIX 2_ FINAL CONSULTATION REPORT
- PAC REPORT - APPENDIX 1_POAN
- PAC REPORT - APPENDIX 3_ EVENT 1 NEWSPAPER ADVERT
- PAC REPORT - APPENDIX 4_SECOND EVENTS NEWSPAPER ADVERT
- PAC REPORT - APPENDIX 5_FIRST EVENT CONSULTATION BOARDS PART 1
- PAC REPORT - APPENDIX 5_FIRST EVENT CONSULTATION BOARDS PART 2
- PAC REPORT - APPENDIX 6_CONSULTATION BOARDS SECOND EVENT
- PAC REPORT
- PLANNING STATEMENT
- APPLICATION FOR PLANNING PERMISSION
- PLANTING SCHEDULE
- PROPOSED CONTEXT ELEVATIONS
- PROPOSED ELEVATIONS NORTH
- PROPOSED ELEVATIONS SOUTH
- PROPOSED GROUND FLOOR PLAN
- PROPOSED MASTERPLAN
- PROPOSED ROOF PLAN
- PROPOSED SECOND TO SIXTH FLOOR PLAN
- SUPERSEDED - PROPOSED SITE PLAN
- SOCIO-EC INFOGRAPHIC
- SUPERSEDED - STREETSCAPE VISUALISATION - VIEW FROM HUNTER STREET BRIDGE
- STUDENT NEED AND DEMAND
- TRANSPORT STATEMENT PART 01
- TRANSPORT STATEMENT PART 02
- TRAVEL PLAN FRAMEWORK PART 01
- TRAVEL PLAN FRAMEWORK PART 02
- SKYLER EAST
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Glasgow City granted permission, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Glasgow City
-
26/02254/FUL Awaiting decision
6 Cayton Gardens Glasgow G69 7LF
Erection of outbuilding to rear of dwellinghouse.
-
26/02233/FUL Awaiting decision
48 Kingslynn Drive Glasgow G44 4JA
Erection of two storey extension to side of dwellinghouse.
-
26/02210/FUL Awaiting decision
5 Aylmer Road Glasgow G43 2JN
Erection of outbuilding to rear and formation of French doors to rear of dwellinghouse
-
26/02209/FUL Awaiting decision
2 Penston Road Glasgow G33 4AG
Formation of hardstanding, installation of drainage infrastructure and external LED lighting and associated works.
-
26/02200/FUL Awaiting decision
22 Sandgate Avenue Glasgow G32 9PB
Alterations to roof of domestic garage associated with conversion to habitable accommodation