Planning application
RSBi Workshop 12 Edgefauld Avenue Glasgow G21 4BB
Works: Demolition
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of training college (Class 10) and associated parking, demolition of existing gatehouse/kennels and erection of replacement gatehouse/kennels
As published by the council, reference 19/02749/FUL
Application record
- Reference
- 19/02749/FUL
- Type
- Full Planning Permission
- Status
- Decided - Grant Subject to Condition(s)
- Decision
- Grant Subject to Condition(s)
- Received
- 11 Sep 2019
- Validated
- 25 Sep 2019
- Decided
- 29 Jan 2020
- Ward
- Springburn/Robroyston
- Parish
- Springburn Central
- Decision by
- Delegated
- Postcode
- G21 4BB
Timeline
Dates from the published record
-
11 Sep 2019
Received by Glasgow City
-
25 Sep 2019
Validated
Checked as complete and ready for consideration.
-
29 Jan 2020
Decision issued: Grant Subject to Condition(s)
-
26 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
44 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
12 Foyers Terrace Glasgow G21 4NF
External alterations including demolition of porch to rear of dwellinghouse and formation of raised terrace.
Granted Full applications Extension DemolitionSmall domestic -
250 Edgefauld Road/ 15 Croftbank Street Glasgow
Installation of roof top air source heat pump and plant and associated works.
Granted Full applications 21 docs -
225 Flemington Street Glasgow G21 4TG
Erection of gate and fence (Retrospective).
Granted Full applications 17 docsSmall domestic -
Glasgow Kelvin College Springburn Campus 123 Flemington Street Glasgow G21 4TD
89% historically approved · decision due ~30 Sep
installation of replacement cladding to college building.
Awaiting decision Full applications 10 docs -
217 Springburn Way Glasgow G21 1DU
Use of retail unit (Class 1) as cafe (Class 3) and installation of flue to rear.
Granted Full applications 12 docs -
237 - 237A Springburn Way Glasgow
Use of office as 2No. flatted dwellings (Sui Generis)
Refused Full applications 11 docs
Other full applications applications
In Glasgow City
-
26/01858/FUL Awaiting decision
10 Fifth Avenue Glasgow G12 0AT
Erection of two storey side, upper floor rear and front entrance porch extensions, formation of dormer window to front of dwellinghouse and external alterations.
-
26/01864/FUL Awaiting decision
Flat 0/2 407 Carmunnock Road Glasgow G45 9RE
Installation of access ramp to front of flatted property
-
26/01844/FUL Awaiting decision
11 University Gardens Glasgow G12 8QH
Installation of plant
-
26/00481/FUL Withdrawn
Site At Amulree Recreation Area/ Amulree Street Glasgow
Erection of community hub formation of 3G artificial football pitch, floodlighting, vehicular access, parking, floodlighting and associated works.
-
26/01842/FUL Awaiting decision
Site To The East Of 14 Dundasvale Court Glasgow
Erection of cycle store