Planning application
Site To The Rear Of 250 Edmiston Drive Glasgow
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of 25m lattice tower, supporting 6 no. antenna apertures, 8 no cabinets and associated development including 2.4m high palisade fencing together with ancillary equipment.
As published by the council, reference 19/00365/FUL
Application record
- Reference
- 19/00365/FUL
- Type
- Full Planning Permission
- Status
- Decided - Grant Subject to Condition(s)
- Decision
- Grant Subject to Condition(s)
- Received
- 5 Feb 2019
- Validated
- 20 Feb 2019
- Decided
- 16 Apr 2019
- Ward
- Govan
- Parish
- Govan
- Decision by
- Delegated
Timeline
Dates from the published record
-
5 Feb 2019
Received by Glasgow City
-
20 Feb 2019
Validated
Checked as complete and ready for consideration.
-
16 Apr 2019
Decision issued: Grant Subject to Condition(s)
-
13 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
16 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
357 Helen Street Glasgow G51 3AD
Formation of compound to rear of building and installation of plant
Granted Full applications 15 docs -
Site Adjacent To 387 Helen Street Glasgow
Erection of commercial development (in principle) to vacant site, comprising coffee shop with drive through (hybrid Class 1/ Class 3/Sui Generis Uses) and restaurant unit with drive through (hybrid Class 1/ Class 3 Sui Generis Uses), access, car parking, landscaping, engineering and ancillary works.
Granted Outline 64 docs -
Road Policing Complex 433 Helen Street Glasgow G51 3HH
Installation of photovoltaic panel array to multiple roofs.
Granted Full applications -
7 Birkmyre Road Glasgow G51 3JH
Use of premises as car wash/car garage Class 5 (General Industry), external alterations and associated works.
Granted Full applications 20 docs -
380 Helen Street Glasgow G51 3AD
Display of 3No. illuminated fascia signs
Granted Advertising 9 docs -
Other full applications applications
In Glasgow City
-
26/01858/FUL Awaiting decision
10 Fifth Avenue Glasgow G12 0AT
Erection of two storey side, upper floor rear and front entrance porch extensions, formation of dormer window to front of dwellinghouse and external alterations.
-
26/01864/FUL Awaiting decision
Flat 0/2 407 Carmunnock Road Glasgow G45 9RE
Installation of access ramp to front of flatted property
-
26/01844/FUL Awaiting decision
11 University Gardens Glasgow G12 8QH
Installation of plant
-
26/00481/FUL Withdrawn
Site At Amulree Recreation Area/ Amulree Street Glasgow
Erection of community hub formation of 3G artificial football pitch, floodlighting, vehicular access, parking, floodlighting and associated works.
-
26/01842/FUL Awaiting decision
Site To The East Of 14 Dundasvale Court Glasgow
Erection of cycle store