Skip to content
PlanIndex Get alerts
Menu

Planning application

38 Clyde Place Glasgow G5 8AQ

Granted Glasgow City 18/03368/FUL Full Planning Permission

Works: Extension Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of building with façade retention (north and east elevations), alterations and extension to create multi-use event space and formation of roof structure.

As published by the council, reference 18/03368/FUL

Application record

Reference
18/03368/FUL
Type
Full Planning Permission
Status
Decided - Grant Subject to Condition(s)
Decision
Grant Subject to Condition(s)
Received
14 Nov 2018
Validated
15 Nov 2018
Decided
21 Mar 2019
Ward
Govan
Parish
Kinning Park
Decision by
Delegated
Postcode
G5 8AQ

Timeline

Dates from the published record

  1. 14 Nov 2018

    Received by Glasgow City

  2. 15 Nov 2018

    Validated

    Checked as complete and ready for consideration.

  3. 21 Mar 2019

    Decision issued: Grant Subject to Condition(s)

  4. 23 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

61 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 38 Clyde Place Glasgow G5 8AQ

    18/03367/LBA Submitted 14 Nov 2018 1m away

    Demolition of building with façade retention (north and east elevations), alterations and extension to create multi-use event space and formation of roof structure.

    Granted Heritage and listed buildings Extension Demolition 52 docs
  • Site Bounded By Clyde Place/Commerce Street/Kingston Street/West Street/ Centre Street Glasgow

    19/01013/MSC Submitted 1 Apr 2019 29m away

    Erection of mixed-use development to include offices, residential, hotel, serviced apartments, shops/retail, offices and restaurants/public houses and crèche together with associated car parking, access, landscaping, public realm and infrastructure works: Approval of Matters Specified in Conditions 3(1-10), 7 (ground contamination), 13 (servicing), 18 (refuse), 19 (travel plan), 36 (sustainable design) and 38 (feasibility study) of Planning Permission in Principle consent 16/02357/DC in relation to phase 2 Building 5 (private rented residential flats and ground floor commercial units).

    Granted Conditions New dwelling 69 docs
  • 58-60 Kingston Street Glasgow

    19/03874/LBA Submitted 20 Dec 2019 67m away

    Internal and external repair works

    Granted Heritage and listed buildings 37 docs
  • 58-60 Kingston Street Glasgow

    19/03879/FUL Submitted 20 Dec 2019 72m away

    External works including stone repairs and cleaning, chimney repairs and re-roofing.

    Granted Full applications 23 docs
  • Site Bounded By Clyde Place/Commerce Street/Kingston Street/West Street/ Centre Street Glasgow

    21/01302/MSC Submitted 20 Apr 2021 77m away

    Erection of mixed Use Development to include offices, residential, shops/retail, offices and restaurants/public houses and creche together with associated parking, access, landscaping, public realm and infrastructure works: Application for the Approval of Matters Specified in Conditions 3(1-10), 7, 13, 18, 19 and 36/38 of 16/02357/DC as it relates to an office building with ancillary ground floor uses and public realm (Phase 5 Building 6)

    Granted Conditions 92 docs
  • Site Bounded By Clyde Place/Commerce Street/Kingston Street/West Street/ Centre Street Glasgow

    18/03309/MSC Submitted 8 Nov 2018 98m away

    Erection of mixed-use development to include offices, residential, hotel, serviced apartments, shops/retail, offices and restaurants/public houses and crèche together with associated car parking, access, landscaping, public realm and infrastructure works: Approval of Matters Specified in Conditions 3(1-10), 7 (ground contamination), 13 (servicing), 18 (refuse), 19 (travel plan), 36 (sustainable design) and 38 (feasibility study) of Planning Permission in Principle consent 16/02357/DC in relation to phase 3 Building 3.

    Granted Conditions New dwelling 103 docs

In Glasgow City

  • 26/01858/FUL Awaiting decision

    10 Fifth Avenue Glasgow G12 0AT

    Erection of two storey side, upper floor rear and front entrance porch extensions, formation of dormer window to front of dwellinghouse and external alterations.

    1 Sep 2026 Full applications
  • 26/01864/FUL Awaiting decision

    Flat 0/2 407 Carmunnock Road Glasgow G45 9RE

    Installation of access ramp to front of flatted property

    28 Aug 2026 Full applications
  • 26/01844/FUL Awaiting decision

    11 University Gardens Glasgow G12 8QH

    Installation of plant

    26 Aug 2026 Full applications
  • 26/00481/FUL Withdrawn

    Site At Amulree Recreation Area/ Amulree Street Glasgow

    Erection of community hub formation of 3G artificial football pitch, floodlighting, vehicular access, parking, floodlighting and associated works.

    9 Mar 2026 Full applications
  • 26/01842/FUL Awaiting decision

    Site To The East Of 14 Dundasvale Court Glasgow

    Erection of cycle store

    25 Aug 2026 Full applications