Planning application
30 Auchinlea Way Glasgow G34 9JJ
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Installation of plant.
As published by the council, reference 18/02809/FUL
Application record
- Reference
- 18/02809/FUL
- Type
- Full Planning Permission
- Status
- Decided - Grant Subject to Condition(s)
- Decision
- Granted As published: Grant Subject to Condition(s)
- Received
- 20 Sep 2018
- Validated
- 26 Sep 2018
- Decided
- 9 Nov 2018
- Ward
- North East
- Parish
- Easterhouse Central
- Decision by
- Delegated
- Postcode
- G34 9JJ
Site history
Applications at this address on the Glasgow City register
This site has had 7 applications since 2018: 6 approved, 1 refused.
-
19/03796/ADV Granted
30 Auchinlea Way Glasgow G34 9JJ
Display of various internally illuminated signage
-
19/01900/ADV Granted
30 Auchinlea Way Glasgow G34 9JJ
Display of internally illuminated fascia sign
-
19/01034/ADV Granted
30 Auchinlea Way Glasgow G34 9JJ
Installation of LED display to frontage.
-
19/00333/ADV Granted
30 Auchinlea Way Glasgow G34 9JJ
Display of illuminated signage.
-
18/03228/ADV Refused
30 Auchinlea Way Glasgow G34 9JJ
Display of 1 LED display on front elevation and one non-illuminated free standing banner sign
-
18/02608/ADV Granted
30 Auchinlea Way Glasgow G34 9JJ
Display of illuminated signage.
Timeline
Dates from the published record
-
20 Sep 2018
Received by Glasgow City
-
26 Sep 2018
Validated
Checked as complete and ready for consideration.
-
9 Nov 2018
Decision issued: Grant Subject to Condition(s)
-
6 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
9 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Glasgow City granted permission on 9 November 2018, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
30 Auchinlea Way Glasgow G34 9JJ
Display of internally illuminated fascia sign
Granted Advertising 7 docs -
30 Auchinlea Way Glasgow G34 9JJ
Display of 1 LED display on front elevation and one non-illuminated free standing banner sign
Refused Advertising 5 docs -
-
30 Auchinlea Way Glasgow G34 9JJ
Installation of LED display to frontage.
Granted Advertising 7 docs -
30 Auchinlea Way Glasgow G34 9JJ
Display of various internally illuminated signage
Granted Advertising 5 docs -
Morrisons 20 Auchinlea Way Glasgow G34 9JJ
83% historically approved · decision due ~8 Dec
Display of internally illuminated fascia signage and LED lighting, and non-illuminated vinyl to canopy of electric vehicle charging zone (Retrospective).
Awaiting decision Advertising
Other full applications
In Glasgow City
-
26/02233/FUL Awaiting decision
48 Kingslynn Drive Glasgow G44 4JA
Erection of two storey extension to side of dwellinghouse.
-
26/02210/FUL Awaiting decision
5 Aylmer Road Glasgow G43 2JN
Erection of outbuilding to rear and formation of French doors to rear of dwellinghouse
-
26/02209/FUL Awaiting decision
2 Penston Road Glasgow G33 4AG
Formation of hardstanding, installation of drainage infrastructure and external LED lighting and associated works.
-
26/02200/FUL Awaiting decision
22 Sandgate Avenue Glasgow G32 9PB
Alterations to roof of domestic garage associated with conversion to habitable accommodation
-
26/02199/FUL Awaiting decision
77 Merrylee Road Glasgow G43 2QY
Erection of single storey extension to rear of dwellinghouse and external alterations