Skip to content
PlanIndex Get alerts
Menu

Planning application

GORST FARM LODGE LANE ELSWICK PRESTON LANCASHIRE PR4 3YH

Granted Fylde 22/0595 Full Planning Permission

Works: Extension

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

ERECTION OF 3 DETACHED DWELLINGS WITH ASSOCIATED GARAGES, ACCESS, EXTENSION TO PEDESTRIAN FOOTWAY, ERECTION OF DOUBLE GARAGE FOR FARMHOUSE AND REINSTATEMENT OF FORMER FARMYARD AREA TO GRASSLAND (REVISION OF SCHEME GRANTED BY PLANNING PERMISSIONS 19/0123 AND 20/0059)

As published by the council, reference 22/0595

Application record

Reference
22/0595
Type
Full Planning Permission
Status
Granted
Decision
Granted
Received
1 Aug 2022
Validated
1 Aug 2022
Decided
6 Apr 2023
Ward
Rural North Fylde
Parish
Elswick
Decision by
Delegated
Postcode
PR4 3YH

Timeline

Dates from the published record

  1. 1 Aug 2022

    Received by Fylde

  2. 6 Apr 2023

    Decision issued: Granted

  3. 7 Aug 2026

    Added to PlanIndex

Documents

Plans, drawings, consultee responses and the officer's report

33 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

In Fylde

  • 25/0577 Refused

    REAM HILLS, REAM HILLS HOLIDAY PARK MYTHOP ROAD WEETON WITH PREESE LANCASHIRE PR4 3NJ

    CHANGE OF USE OF LAND FOR THE SITING OF 27 STATIC HOLIDAY LODGES WITH RAISED EXTERNAL DECKING, INCLUDING 1) CONSTRUCTION OF 27 CONCRETE BASES EACH TO SITE A SINGLE LODGE, 2) PROVISION OF 2 NO. GRAVEL PARKING SPACES FOR EACH LODGE, 3) LANDSCAPING ARRANGEMENTS

    30 Sep 2025 Full applications
  • 26/0185 Granted

    SUMMERER FARM WEETON ROAD SINGLETON LANCASHIRE FY6 8NQ

    ERECTION OF TWO BUILDINGS FOR USE AS DOG BREEDING KENNELS (RETROSPECTIVE APPLICATION)

    19 Mar 2026 Full applications
  • 26/0401 Refused

    FLAT 3M 3 CENTRAL BEACH LYTHAM ST ANNES FY8 5LB

    ERECTION OF FIRST-FLOOR CONSERVATORY TO REAR

    25 Jun 2026 Full applications
  • 26/0391 Granted

    THE OLD PRINTWORKS BIRLEY STREET KIRKHAM RESTON PR4 2AT

    CHANGE OF USE OF THE EXISTING FIRST FLOOR FROM COMMERCIAL OFFICE ACCOMMODATION (USE CLASS E) TO A SINGLE RESIDENTIAL DWELLING (USE CLASS C3), INCLUDING REPLACEMENT OF DOOR & WINDOW ARRANGEMENT TO FRONT ELEVATION WITH 2 NO. DOOR ENTRANCES, 2 NO. FIRST FLOOR WINDOWS TO FRONT AND REAR ELEVATIONS, AND BIN STORE TO FRONT YARD SPACE.

    22 Jun 2026 Full applications
  • 25/0597 Withdrawn

    PEEL HILL FARM PRESTON NEW ROAD WESTBY WITH PLUMPTONS LANCASHIRE FY4 5JP

    ERECTION OF AN AGRICULTURAL BUILDING TO ACCOMMODATE A SILAGE CLAMP

    9 Oct 2025 Full applications