Planning application
78 Grove Road Christchurch Coleford Gloucestershire GL16 7AF
Works: Demolition Small domestic
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Erection of a replacement dwelling and detached garage with associated works. Demolition of existing dwelling and outbuilding.
As published by the council, reference P1127/26/FUL
Application record
- Reference
- P1127/26/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Received
- 24 Sep 2026
- Validated
- 25 Sep 2026
- Ward
- Berry Hill
- Parish
- West Dean
- Postcode
- GL16 7AF
Timeline
Dates from the published record
-
24 Sep 2026
Received by Forest of Dean
-
25 Sep 2026
Validated
Checked as complete and ready for consideration.
-
6 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 20 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Forest of Dean took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Mike Etheridge Construction Ltd Agent, a construction firm registered in Coleford
Active · incorporated 1999 · Coleford
12 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
18 documents on file for this application
- APPLICATION FORM
- LOCATION PLAN
- EXISTNG ELEVATIONS AND FLOOR PLAN
- EXISTING STREET SCENE
- PROPOSED SITE BLOCK PLAN
- PROPOSED STREET SCENE
- PROPOSED TREE PROTECTION PLAN
- PROPOSED GROUND FLOOR PLAN
- PROPOSED FIRST FLOOR PLAN
- PROPOSED ATTIC FLOOR PLAN
- PROPOSED GARAGE FLOOR PLAN AND SECTION
- PROPOSED ELEVATIONS 1
- DESIGN AND ACCESS STATEMENT
- PROPOSED ELEVATIONS 2
- PROPOSED GARAGE ELEVATIONS
- PROPOSED SECTIONS A-A, B-B- & C-C
- PRELIMINARY ECOLOGICAL ASSESSMENT
- GROUND STABILITY RESIDENTIAL REPORT
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Forest of Dean for determination, against a statutory target of eight weeks. Over the last year Forest of Dean decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
32 Tudor Walk Berry Hill Coleford Gloucestershire GL16 7AE
Construction of three terraced two-storey dwellings with associated parking and landscaping and demolition of existing bungalow (part retrospective)
Granted Full applications Demolition 53 docs -
32 Tudor Walk Berry Hill Coleford Gloucestershire GL16 7AE
Discharge of Condition 9 (CEMP) relating to planning permission P1089/25/FUL
Granted Conditions 2 docs -
Bracelands Camp Site Bracelands Drive Christchurch Coleford Gloucestershire GL16 7NN
Installation of bin stores, erection of archery shelter and retention of archery area fence
Granted Full applications 11 docsSmall domestic -
Canmore 76 Park Road Christchurch Coleford Gloucestershire GL16 7AZ
Proposed first floor dressing room extension.
Granted Full applications Extension 7 docs -
Northern Field Between Marian's Walk And Grove Road (Also Known As Land At Grove Road, Berry Hill) Coleford Gloucestershire
Discharge of Condition 6 (Verification Report) relating to planning permission P1341/24/FUL
Granted Conditions 3 docs -
71 Park Road Berry Hill Coleford Gloucestershire GL16 7AG
Erection of a two-storey rear, and single-storey side, front and rear extensions. Dropped kerb to highway
Granted Full applications Extension 8 docsSmall domestic
Other full applications
In Forest of Dean
-
P1090/26/FUL Awaiting decision
SPP Pumps Ltd Crucible Close Coleford Gloucestershire GL16 8RE
Erection of a semi permanent building providing 342m² of undercover storage for engines and metal fabrications currently stored externally within the existing yard.
-
P0902/26/FUL Granted
Sunnyside Crow Ash Road Berry Hill Coleford Gloucestershire GL16 7RB
Demolition of existing kitchen extension and erection of two storey side extension with single storey wrapping round rear of the property.
-
P0800/26/FUL Granted
Dennel Hill Farmhouse Tidenham Chase Chepstow NP16 7JN
Erection of rear 1.5 storey extension with balcony and first floor extension with balcony to allow for extended first floor level with associated internal alterations and works. Demolition of existing rear conservatory.
-
P0682/26/FUL Granted
7 Woodgate Road Mile End Coleford Gloucestershire GL16 7QE
Proposed Vehicular Access and Parking and associated works
-
P0213/26/FUL Granted
Land At 34 Worrall Hill Gloucestershire GL17 9QE
Erection of a self-build dwelling and associated works