Planning application
Deep Campus Day House Quarry Tidenham Chepstow NP16 7LQ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of a floating saturation diving facility comprising prefabricated structures, diving infrastructure, ancillary equipment and associated works positioned on a permanently moored pontoon.
As published by the council, reference P0969/26/FUL
Application record
- Reference
- P0969/26/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Received
- 18 Aug 2026
- Validated
- 24 Aug 2026
- Ward
- Tidenham
- Parish
- Tidenham
- Decision by
- Delegated Decision
- Postcode
- NP16 7LQ
Timeline
Dates from the published record
-
18 Aug 2026
Received by Forest of Dean
-
24 Aug 2026
Validated
Checked as complete and ready for consideration.
-
26 Aug 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 19 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Forest of Dean took a median of 57 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in London
1,780 applications on PlanIndex · across 174 councils · 92% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itApplicant on file
1 application on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
13 documents on file for this application
- EXISTING SITE ELEVATION
- EXISTING SITE PLAN
- PROPOSED SITE PLAN
- COVER LETTER - UPDATED
- EXISTING SITE PERSPECTIVE
- APPLICATION FORM
- PROPOSED BLOCK PLAN & FRONT ELEVATIONS
- PROPOSED EAST & WEST ELEVATIONS
- PERSPECTIVE VIEW
- DESIGN AND ACCESS STATEMENT
- ECOLOGICAL APPRAISAL
- LIGHTING DESIGN STRATEGY AND LIGHTING ASSESSMENT
- PLANNING STATEMENT
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Forest of Dean for determination, against a statutory target of eight weeks. Over the last year Forest of Dean decided full applications in a median of 69 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Day House Tidenham Chepstow NP16 7LH
Listed building consent for the erection of external boiler and flue to rear entrance porch, erection of concrete ramp to rear entrance porch, reconstruction of lean-to rear range. Removal of rear door off the through passage and infilling of opening in concrete blockwork, blocking up at first floor of four panelled door to rear range with blockwork leaving blockwork visible through door, removal of doorway and blocking up of second opening at first floor into rear range leaving blockwork exposed. (Retrospective)
Granted Heritage and listed buildings Extension 20 docsSmall domestic -
The National Diving And Activity Centre Day House Quarry Tidenham Chepstow NP16 7LH
Erection of a three storey modular facilities building. (Retrospective).
Granted Full applications 149 docs -
Church Cottage Tidenham Chepstow NP16 7JQ
Discharge of Condition 03 (sample of roofing material) and Condition 05 (large scale details of casement windows) relating to planning permission P0952/22/FUL
Granted Conditions Windows or glazing 8 docs -
Barn At Church Cottage Tidenham
Non Material Amendment to P1669/22/FUL to allow for the alterations to the internal layout
Granted Amendments 8 docs -
Day House Quarry Tidenham Chepstow NP16 7LH
Discharge of Condition 5 (Construction Environmental Management Plan - Biodiversity) relating to planning permission P0589/22/FUL.
Granted Conditions 11 docs -
Day House Quarry Tidenham Chepstow NP16 7LH
Variation of condition (02) (approved plans) of planning application P0600/22/FUL to allow amendments to approved plans and amendments to the site compound, including the erection of an office and briefing centre and associated works (part-retrospective) (revised description)
Granted Full applications 27 docs
Other full applications
In Forest of Dean
-
P1033/26/FUL Awaiting decision
14 Yew Tree Close Corse Gloucester Gloucestershire GL19 3SQ
Erection of a single storey side extension, and associated works.
-
P1014/26/FUL Awaiting decision
Garages The Triangle Brockweir NP16 7NR
Erection of a single dwelling with associated access, parking, drainage and landscaping. Demolition of existing garages
-
P1013/26/FUL Awaiting decision
Normansland Farm Normansland Road Dymock Gloucestershire GL18 2BE
Erection of a two storey side extension with associated works. Demolition of existing garage and utility.
-
P1040/26/FUL Awaiting decision
Alvington Playing Fields Court Lane Alvington Gloucestershire GL15 6BG
Variation of condition of 02 (approved plans) and 04 (render details) of P1572/22/FUL to allow for a smaller pavilion, removal of the hall and storage rooms including changes to the external materials.
-
P1008/26/FUL Awaiting decision
61 Woodside Avenue Cinderford Gloucestershire GL14 2DR
Erection of a two storey side extension and a single storey rear extension with associated works. Demolition of rear porch and shed.