Planning application
Land Off Severnbank Avenue Newnham
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Residential development of 88 no. dwellings (Class C3); vehicular and pedestrian access; open space, landscaping, drainage attenuation and other associated works
As published by the council, reference P0687/26/FUL
Application record
- Reference
- P0687/26/FUL
- Category
- Full applications
- Status
- Pending Consideration
- Received
- 11 Jun 2026
- Validated
- 8 Jul 2026
- Ward
- Newnham
- Parish
- Newnham
- Decision by
- Committee Decision
Timeline
Dates from the published record
-
11 Jun 2026
Received by Forest of Dean
-
8 Jul 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 2 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Forest of Dean took a median of 57 days over the applications it decided in the last year.
Documents
Plans, drawings, consultee responses and the officer's report
146 documents on file for this application
- GCC COMMUNITY INFRASTRUCTURE TEAM
- GCC COMMUNITY INFRASTRUCTURE TEAM APPENDIX 2
- GCC COMMUNITY INFRASTRUCTURE TEAM APPENDIX 3
- GCC COMMUNITY INFRASTRUCTURE TEAM APPENDIX 4
- GCC COMMUNITY INFRASTRUCTURE TEAM APPENDIX 1
- GCC COMMUNITY INFRASTRUCTURE TEAM SUMMARY REPS
- LEAD LOCAL FLOOD AUTHORITY
- OBJECTION - HENRY, J
- ENVIRONMENT AGENCY
- ECOLOGY
- ECOLOGY - LIKELY SIGNIFICANT EVENTS
- NETWORK RAIL
- SURFACE FINISHES PARCEL A - SHEET 2
- SURFACE FINISHES OVERVIEW PLAN
- SURFACE FINISHES PARCEL A - SHEET 2
- SURFACE FINISHES PARCEL A - SHEET 4
- SURFACE FINISHES PARCEL A - SHEET 1
- GREENFIELD RUN OFF RATE ESTIMATION
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- GENERAL - CHILD, J ST PETERS C OF E PRIMARY SCHOOL NEWNHAM
- PARISH COUNCIL EXTENSION OF TIME AGREEMENT
- NEWNHAM PARISH COUNCIL
- EHO - NOISE & AMENITIES
- PROPERTY AND ASSETS
- HIGHWAYS COMMENTS
- FLOOD RISK MANAGEMENT OFFICER
- LEAD LOCAL FLOOD AUTHORITY
- MINERALS AND WASTE PLANNING AUTHORITY
- ENVIRONMENT AGENCY
- ENVIRONMENT AGENCY
- ENVIRONMENT AGENCY
- PUBLIC RIGHTS OF WAY OFFICER COMMENTS
- SEVER TRENT WATER
- NATURAL ENGLAND RESPONSE
- SUSTAINABILITY - TREES
- EHO - NOISE & AMENITIES
- PARISH COMMENTS EOT AGREEMENT
- ARCHAEOLOGIST
- PUBLIC RIGHT OF WAY
- WASTE MINIMISATION STATEMENT
- GEOPHYSICS REPORT
- 4 BED HOUSE AFFORDABLE - GROUND AND FIRST FLOOR PLANS
- HORNBY - GROUND AND FIRST FLOOR PLANS
- TENNYSON - GROUND AND FIRST FLOOR PLANS
- MILNE - GROUND AND FIRST FLOOR PLANS
- 2 BED BUNGALOW - GROUND AND FIRST FLOOR PLANS
- POTTER OPTION 1 - GROUND AND FIRST FLOOR PLANS
- POTTER OPTION 2 - GROUND AND FIRST FLOOR PLANS
- HARDY - GROUND AND FIRST FLOOR PLANS
- CHRISTIE - GROUND AND FIRST FLOOR PLANS
- JOYCE - GROUND AND FIRST FLOOR PLANS
- LEAR - GROUND AND FIRST FLOOR PLANS
- STEINBECK - GROUND AND FIRST FLOOR PLANS
- BLAKE - GROUND AND FIRST FLOOR PLANS
- HARWOOD - GROUND AND FIRST FLOOR PLANS
- ATWOOD - GROUND AND FIRST FLOOR PLANS
- 1B2P APARTMENT ELEVATIONS FLAT A AND FLAT B
- 1B2P AFFORDABLE BUNGALOW ELEVATIONS
- 2B4P AFFORDABLE HOUSE ELEVATIONS
- HARDY (A) 3 BEDROOM HOUSE ELEVATIONS
- HARDY (C) 3 BEDROOM HOUSE ELEVATIONS
- CHRISTIE 3 BEDROOM HOUSE ELEVATIONS
- ARBORICULTURAL IMPACT ASSESSMENT AND METHOD STATEMENT
- LONG SECTION SHEET 1
- LONG SECTION SHEET 2
- LONG SECTION SHEET 3
- APPENDIX 1: LANDSCAPING MASTERPLAN
- TRANSPORT ASSESSMENT
- RESIDENTIAL TRAVEL PLAN
- TRANSPORT ASSESSMENT APPENDIX - A - G
- TRANSPORT ASSESSMENT APPENDIX H - J
- TRANSPORT ASSESSMENT APPENDIX K - P
- AFFORDABLE HOUSING STATEMENT
- DESIGN AND ACCESS STATEMENT 1-10
- STATEMENT OF COMMUNITY INVOLVEMENT
- PLANNING STATEMENT
- HISTORIC ENVIRONMENT ASSESSMENT
- DESIGN AND ACCESS STATEMENT 16-23
- SURFACE FINISHES PARCEL A- SHEET 1
- PV, EVCP. ASHP, & WATERBUTT LOCATIONS
- ILLUSTRATIVE STREET SCENE C-C
- ENERGY STATEMENT
- 3 BED HOUSE AFFORDABLE - GROUND AND FIRST FLOOR PLANS
- 3B5P AFFORDABLE HOUSE ELEVATIONS
- 4B6P AFFORDABLE HOUSE ELEVATIONS
- HORNBY ELEVATIONS
- HORNBY ELEVATIONS
- TENNYSON (A) ELEVATIONS
- TENNYSON (C) ELEVATIONS
- MILNE ELEVATIONS
- 2B BUNGALOW ELEVATIONS
- POTTER 3 BEDROOM HOUSE - ELEVATIONS
- POTTER 3 BEDROOM HOUSE ELEVATIONS
- JOYCE (A) 4 BEDROOM HOUSE ELEVATIONS
- JOYCE (C) 4 BEDROOM HOUSE ELEVATIONS
- LEAR (A) 4 BEDROOM HOUSE ELEVATIONS
- LEAR (C) 4 BEDROOM HOUSE ELEVATIONS
- STEINBECK 4 BEDROOM HOUSE ELEVATIONS
- BLAKE (A) 4 BEDROOM HOUSE ELEVATIONS
- BLAKE (C) 4 BEDROOM HOUSE ELEVATIONS
- HARWOOD 5 BEDROOM HOUSE ELEVATIONS
- ATWOOD 5 BEDROOM HOUSE ELEVATIONS
- PROPOSED ELEVATIONAL TREATMENT TYPES
- SITE LAYOUT
- SURFACE FINISHES OVERVIEW PLAN
- SURFACE FINISHES PARCEL A -SHEET 2
- SURFACE FINISHES PARCEL A - SHEET 4
- ILLUSTRATIVE STREET SCENES A-A, B-B
- APPENDIX 6: REPTILE LEGISLATION, METHODOLOGY AND RESULTS
- FLOOD RISK ASSESSMENT AND DRAINAGE STRATEGY
- APPLICATION FORM
- LOCATION PLAN
- BOUNDARY TREATMENT PLAN
- REFUSE COLLECTION PLAN
- LANDSCAPING MASTERPLAN
- LANDSCAPING PLAN 1 OF 4
- LANDSCAPING PLAN 2 OF 4
- LANDSCAPING PLAN 3 OF 4
- LANDSCAPING PLAN 4 OF 4
- 1 BED FLAT AFFORDABLE - GROUND AND FIRST FLOOR PLANS
- 1 BED BUNGALOW AFFORDABLE - FLOOR PLANS
- 2 BED HOUSE AFFORDABLE - GROUND AND FIRST FLOOR PLANS
- LONG SECTION SHEET 4
- FLOOD EXCEEDANCE PLAN, OVERVIEW PLAN
- FLOOD EXCEEDANCE PLAN PARCEL A - SHEET 1 DRAFT
- FLOOD EXCEEDANCE PLAN PARCEL B SHEET 1 DRAFT
- ADOPTABLE DRAINAGE OVERVIEW PARCEL A
- ADOPTABLE DRAINAGE OVERVIEW PARCEL B&C
- ENGINEERING LAYOUT OVERVIEW PLAN
- ENGINEERING LAYOUT PARCEL A - SHEET 1
- ENGINEERING LAYOUT OVERVIEW PARCEL A - SHEET 2
- ENGINEERING LAYOUT PARCEL A - SHEET 3A AND 3B
- ENGINEERING LAYOUT PARCEL B - SHEET 1
- SUDS DETAILS SHEET 1
- S38 LEGAL PLAN PARCEL A - SHEET 1
- S38 LEGAL PLAN PARCEL B - SHEET 1
- FLOOD EXCEEDANCE PLAN, OVERVIEW PLAN
- FLOOD EXCEEDANCE PLAN PARCEL A - SHEET 1
- FLOOD EXCEEDANCE PLAN - PARCEL B SHEET 1
- ADOPTABLE SEWER CONSTRUCTION DETAILS SHEET 1
- ADOPTABLE SEWER CONSTRUCTION DETAILS SHEET 2
- NOISE IMPACT ASSESSMENT - SOUTHERN PARCEL
- NOISE IMPACT ASSESSMENT - NORTHERN PARCEL
- ECOLOGICAL IMPACT ASSESSMENT PART 1
- ECOLOGICAL IMPACT ASSESSMENT PART 2
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Forest of Dean for determination, against a statutory target of eight weeks. Over the last year Forest of Dean decided full applications in a median of 69 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Other full applications
In Forest of Dean
-
P1033/26/FUL Awaiting decision
14 Yew Tree Close Corse Gloucester Gloucestershire GL19 3SQ
Erection of a single storey side extension, and associated works.
-
P1014/26/FUL Awaiting decision
Garages The Triangle Brockweir NP16 7NR
Erection of a single dwelling with associated access, parking, drainage and landscaping. Demolition of existing garages
-
P1013/26/FUL Awaiting decision
Normansland Farm Normansland Road Dymock Gloucestershire GL18 2BE
Erection of a two storey side extension with associated works. Demolition of existing garage and utility.
-
P1040/26/FUL Awaiting decision
Alvington Playing Fields Court Lane Alvington Gloucestershire GL15 6BG
Variation of condition of 02 (approved plans) and 04 (render details) of P1572/22/FUL to allow for a smaller pavilion, removal of the hall and storage rooms including changes to the external materials.
-
P1008/26/FUL Awaiting decision
61 Woodside Avenue Cinderford Gloucestershire GL14 2DR
Erection of a two storey side extension and a single storey rear extension with associated works. Demolition of rear porch and shed.