Planning application
Land At Dean Forest Farm Unlawater Lane Newnham Gloucestershire GL14 1EY
Works: New dwelling Major scheme
Read from the description, not a valuation. How we read the register
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Residential development comprising 46 no. dwellings and associated landscaping and infrastructure.
As published by the council, reference P0323/23/FUL
Application record
- Reference
- P0323/23/FUL
- Type
- Full Application
- Status
- Pending Consideration
- Received
- 6 Mar 2023
- Validated
- 6 Apr 2023
- Ward
- Newnham
- Parish
- Newnham
- Decision by
- Committee Decision
- Postcode
- GL14 1EY
Timeline
Dates from the published record
-
6 Mar 2023
Received by Forest of Dean
-
6 Apr 2023
Validated
Checked as complete and ready for consideration.
-
1 Sep 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 1 June 2023, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Forest of Dean took a median of 56 days over the applications it decided in the last year.
Related applications
Cases linked to this one on the register
- Buildingcontrol: FP0165/26 (Pending Consideration)
Who's behind it
Company information only, from the register and Companies House
Black Box Planning Ltd Agent, a planning consultancy registered in Gloucester
Active · incorporated 2018 · Gloucester
97 applications on PlanIndex · across 26 councils · 91% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordMF Freeman Ltd Applicant
2 applications on PlanIndex
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
483 documents on file for this application
- GENERAL - MACER-WRIGHT, D
- ARCHAEOLOGY COMMENTS
- SUPPORT - SNELL, Z ON BEHALF OF NEWNHAM CRICKET CLUB AND NEWNHAM ARCHERY CLUB
- NATURAL ENGLAND
- NATURAL ENGLAND
- NEWNHAM-ON-SEVERN PARISH COUNCIL
- ECOLOGY
- ECOLOGY - APPROPRIATE ASSESSMENT
- REVISED CONSTRUCTION MANAGEMENT PLAN
- REVISED HORIZONTAL LIGHT SPILL DIAGRAM
- HIGHWAYS DEVELOPMENT MANAGEMENT
- ARCHAEOLOGIST
- OBJECTION - YORKE, R
- OBJECTION - ROBINSON, C
- REVISED HORIZONTAL LIGHT SPILL DIAGRAM
- LIGHTING MONITORING METHOD STATEMENT
- REVISED INDICATIVE OBTRUSIVE LIGHT CALCULATIONS
- REVISED - SITE LAYOUT
- REVISED - REFUSE COLLECTION PLAN
- REVISED - PROPOSED ELEVATION TREATMENT TYPES
- REVISED - CHARACTER AREAS PLAN
- REVISED - CONSTRUCTION MANAGEMENT PLAN
- REVISED - BOUNDARY TREATMENT PLAN
- REVISED - PV, ASHP, EV CHARGING POINTS & WATERBUTT LOCATIONS
- ENVIRONMENTAL HEALTH (NOISE & AMENITIES)
- ECOLOGY
- REVISED LIGHTING MONITORING METHOD STATEMENT
- ENVIRONMENTAL HEALTH
- LIGHTING MONITORING METHOD STATEMENT
- INDICATIVE OBTRUSIVE LIGHT CALCULATIONS
- HORIZONTAL LIGHT SPILL DIAGRAM
- EHO - AIR QUALITY
- LEAD LOCAL FLOOD AUTHORITY
- HIGHWAYS DEVELOPMENT MANAGEMENT
- NATURAL ENGLAND - ANNEX A
- NATURAL ENGLAND
- NATURAL ENGLAND ADDITIONAL COMMENTS
- ADDITIONAL - CONSTRUCTION MANAGEMENT PLAN
- AGREEMENT TO EXTENSION OF TIME
- WASTE MANAGEMENT STATEMENT
- REVISED - DRAINAGE DETAILS
- REVISED - DRAINAGE DETAILS
- REVISED - DRAINAGE DETAILS
- FLOOD RISK ASSESSMENT
- ADDITIONAL - DRAINAGE OPERATION AND MAINTENANCE MANUAL
- REVISED - DRAINAGE DETAILS
- REVISED - DRAINAGE DETAILS
- OBJECTION - FAWCETT-HENRY, P
- FURTHER COMMENT FROM YORKE, R
- FURTHER COMMENTS - DEAN I
- D MACER-WRIGHT
- OBJECTION - MASON, K
- FURTHER COMMENT FROM MCDONALD, G
- FURTHER COMMENT FROM MCDONALD, G
- OBJECTION - FAIRCLOTH, S
- INTERIM SUMMARY - ARCHAEOLOGICAL MANAGEMENT PLAN
- ARCHAEOLOGICAL MANAGEMENT PLAN
- ARCHAEOLOGICAL MANAGEMENT PLAN
- HISTORIC ENGLAND
- OFFICER RE PUBLIC COMMENT
- EMAIL FROM HISTORIC ENGLAND
- NATURE SPACE
- FURTHER COMMENT FROM MCDONALD, G
- GENERAL - MR I DEAN
- GENERAL - MCDONALD, G
- ECOLOGY - APPROPRIATE ASSESSMENT
- FURTHER COMMENT FROM ECOLOGY
- ADDITIONAL ECOLOGICAL INFORMATION
- ENVIRONMENTAL PROTECTION
- CORRESPONDING EXCEL DATA SHEET - GCC COMMUNITY INFRASTRUCTURE
- EMAIL TO OFFICER - GCC COMMUNITY INFRASTRUCTURE
- GCC COMMUNITY INFRASTRUCTURE
- ENVIRONMENTAL PROTECTION OFFICER
- OBJECTION - D,M
- SUSTAINABILITY - ECOLOGY OFFICER
- STROUD DISTRICT COUNCIL RESPONSE
- TREE CONSULTEE RESPONSE
- ARCHAEOLOGY DEPT - GLOS CC
- ERS POLLUTION
- OBJECTION - HUNT
- OBJECTION - GAULD
- OBJECTION - JOHN
- GCC MINERALS AND WASTE
- NATURAL ENGLAND
- ENVIRONMENT PROTECTION RESPONSE
- D ALLEN
- IMAGE TO GO WITH D ALLEN COMMENT
- EHO - TECH POLLUTION SERVICES/NOISE RESPONSE
- OBJECTION - JOHN, A
- OBJECTION - YORKE, R
- OBJECTION - DAVIS, F
- LEAD LOCAL FLOOD AUTHORITY GCC
- HOUSING STRATEGY & ENABLING OFFICER
- PROPOSED FLOOR PLANS - HARWOOD
- PROPOSED ELEVATIONS - HARWOOD
- DRAWING REGISTER
- PROPOSED FLOOR PLANS - ATWOOD
- PROPOSED ELEVATIONS - ATWOOD
- STROUD DISTRICT COUNCIL
- PUBLIC RIGHTS OF WAY
- DETAILED SOFT LANDSCAPE
- REVISED ECOLOGY TECHNICAL NOTE
- REVISED SITE LOCATION PLAN.
- REVISED SITE LAYOUT
- REVISED BOUNDARY TREATMENT PLAN
- REVISED REFUSE COLLECTION PLAN
- REVISED BLOCK CONTEXT LAYOUT
- REVISED PROPOSED FLOOR PLANS
- REVISED PROPOSED FLOOR PLANS STEINBECK
- REVISED PROPOSED FLOOR PLANS MASEFIELD
- REVISED PROPOSED FLOOR PLANS FLAUBERT
- REVISED PROPOSED FLOOR PLANS
- REVISED ILLUSTRATIVE STREET SCENES A-A_ B-B
- REVISED ILLUSTRATIVE STREET SCENES CC AND DD
- REVISED DRAINAGE STRATEGY LAYOUT
- REVISED ENGINEERING LAYOUT-SHEET 1
- REVISED LANDSCAPE AND ECOLOGY MANAGEMENT PLAN
- REVISED PROPOSED FLOOR PLANS BLAKE
- REVISED PROPOSED ELEVATIONS - FLAUBERTFIELD C
- REVISED GARAGES - SINGLE ELEVATIONS
- REVISED PROPOSED ELEVATIONAL TREATMENT TYPES
- REVISED BIODIVERSITY METRIC
- REVISED ENGINEERING LAYOUT-SHEET 2
- REVISED ENGINEERING LAYOUT-SHEET 3
- REVISED ENGINEERING LAYOUT-SHEET 4
- REVISED FINISHED FLOOR LEVEL LAYOUT
- REVISED ROAD AND SEWER LONGITUDINAL SECTIONS-SHEET 1
- REVISED ROAD AND SEWER LONGITUDINAL SECTIONS-SHEET 2
- REVISED KERBS AND SURFACE FINISHES LAYOUT
- REVISED KERBS AND SURFACE FINISHES LAYOUT
- REVISED ADOPTABLE MANHOLE SCHEDULES
- REVISED SURFACE WATER CATCHMENT PLAN
- REVISED GULLEY CATCHMENT PLAN-
- REVISED HYDROBRAKE DETAILS
- REVISED VISIBILITY ASSESSMENRT
- REVISED FIRE APP
- REVISED REFUSE IB
- REVISED ARCHAEOLOGICAL MANAGEMENT PLAN
- REVISED CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- REVISED EXISTING SITE LAYOUT
- REVISED CHARACTER AREAS PLAN
- REVISED EV AND WATERBUTT LOCATIONS.
- REVISED PROPOSED FLOOR PLANS
- REVISED PROPOSED FLOOR PLANS
- REVISED PROPOSED FLOOR PLANS GARAGES
- REVISED PROPOSED ELEVATIONS - 2B4P HOUSE
- REVISED PROPOSED ELEVATIONS - 3B5P HOUSE AFF
- REVISED PROPOSED ELEVATIONS - 4B6P HOUSE AFF
- REVISED PROPOSED ELEVATIONS -STEINBECK
- REVISED PROPOSED ELEVATIONS - BLAKE C
- REVISED PROPOSED ELEVATIONS -MASEFIELD C
- REVISED GARAGES - DOUBLE ELEVATIONS.
- REVISED PROPOSED ELEVATIONS - 3B5P HOUSE V2 AFF.
- REVISED SECTION 38 AGREEMENT LAYOUT
- REVISED SECTION 104 AGREEMENT LAYOUT
- REVISED HYDROBRAKE DETAILS
- REVISED GEOMETRIC PLAN
- REVISED FIRE APP
- REVISED REFUSE OB
- REVISED FLOOD RISK ASSESSMENT
- REVISED LIGHT SPILL LAYOUT
- EXTENSION OF TIME AGREEMENT
- SUSTAINABILITY TEAM EMAIL RE GCN
- ADDITIONAL ECOLOGICAL ADVISOR COMMENT
- ECOLOGY TECHNICAL NOTE
- DETAILED SOFT LANDSCAPE PROPOSALS (SHEET 2 OF 4)
- DETAILED SOFT LANDSCAPE PROPOSALS (SHEET 4 OF 4)
- DETAILED SOFT LANDSCAPE PROPOSALS (SHEET 1 OF 4)
- DETAILED SOFT LANDSCAPE PROPOSALS (SHEET 3 OF 4)
- WASTE MINIMISATION STATEMENT/MANAGEMENT PLAN
- LIGHT SPILL LAYOUT PLAN
- LANDSCAPE ECOLOGY MANAGEMENT PLAN
- LIGHT SPILL REPORT
- MINERALS SCHEDULE
- COUNTY ARCHAEOLOGIST EMAIL
- COUNTY ARCHAEOLOGIST - ATTACHMENT
- SEVERN TRENT WATER AUTHORITY
- SUSTAINABILITY - ECOLOGY
- LOCAL PLANS
- COUNTY ARCHAEOLOGIST
- SEVERN TRENT
- MINERALS & WASTE
- OBJECTION - YORKE, R
- EHO - CONTAMINATED LAND OFFICER
- EHO - CONTAMINATED LAND OFFICER
- OBJECTION - HUNT, S
- NATURAL ENGLAND
- NATURAL ENGLAND ANNEX A
- SUPPORT - WOODWARD GREGG, P
- SUSTAINABILITY - TREES
- LEAD LOCAL FLOOD AUTHORITY
- OBJECTION - RICH, N
- EMAIL INITIAL ACKNOWLEDGEMENT LETTER FROM STROUD DC
- ACKNOWLEDGEMENT OF RECEIPT OF CONSULTEE REQUEST LETTER FROM STROUD DC
- AGREEMENT TO EXTENSION OF TIME
- REVISED FLOOR PLAN DRAWING 5330-W-501-400.P1 HARWOOD GF M&E
- REVISED 7172-P-001 SITE LOCATION PLAN
- REVISED 7172-P-101B BOUNDARY TREATMENT PLAN
- REVISED 7172-P-102B CHARACTER AREAS PLAN
- REVISED 7172-P-200 PROPOSED FLOOR PLANS 1B2PF
- REVISED 7172-P-202 PROPOSED FLOOR PLANS 3B5PH
- REVISED 7172-P-204 PROPOSED FLOOR PLANS POTTER
- REVISED 7172-P-214 PROPOSED FLOOR PLANS FLAUBERT
- REVISED 7172-P-703 PROPOSED ELEVATIONS - 4B6P HOUSE AFF
- REVISED HRA-SHADOW HABITATS REGULATIONS ASSESSMENT REPORT
- REVISED 22-0867-6102-P01 S12 & S22 HEADWALL DETAILS
- REVISED 22-0867-6103-P01 S23, 26 & S27 HEADWALL DETAILS
- REVISED 22-0867-6300-P01 PRIVATE DRIVE DETAILS
- REVISED 22-0867-6400-P01 PRIVATE DRAINAGE DETAILS
- REVISED FINISHED FLOOR LEVELS - DRAWINGS
- REVISED ARBORICULTURAL IMPACT ASSESSMENT AND METHOD STATEMENT REPORT
- REVISED 7172-P-201 PROPOSED FLOOR PLANS 2B4PH
- REVISED 7172-P-203 PROPOSED FLOOR PLANS 4B6PH
- REVISED 7172-P-205 PROPOSED FLOOR PLANS ROWLING
- REVISED 7172-P-206 PROPOSED FLOOR PLANS JOYCE
- REVISED 7172-P-208 PROPOSED FLOOR PLANS STEINBECK
- REVISED 7172-P-210 PROPOSED FLOOR PLANS SHAKESPEARE
- REVISED 7172-P-211 PROPOSED FLOOR PLANS GOLDING
- REVISED 7172-P-212 PROPOSED FLOOR PLANS MASEFIELD
- REVISED 7172-P-213 PROPOSED FLOOR PLANS HARWOOD
- REVISED 7172-P-216 PROPOSED GARAGE FLOORPLANS
- REVISED 7172-P-701A PROPOSED ELEVATIONS - 2B4P HOUSE AFF
- REVISED 7172-P-704 PROPOSED ELEVATIONS - POTTER
- REVISED 7172-P-705 PROPOSED ELEVATIONS - ROWLING V2024
- REVISED 7172-P-706A PROPOSED ELEVATIONS - JOYCE
- REVISED 7172-P-708 PROPOSED ELEVATIONS -STEINBECK A
- REVISED 7172-P-709 PROPOSED ELEVATIONS -STEINBECK C
- REVISED 7172-P-711A PROPOSED ELEVATIONS - BLAKE C
- REVISED 7172-P-717 PROPOSED ELEVATIONS - ATWOOD A
- REVISED 7172-P-718 PROPOSED ELEVATIONS - ATWOOD C
- REVISED 7172-P-719,720,721,722 GARAGE ELEVATIONS
- REVISED 7172-P-800A ILLUSTRATIVE STREET SCENES A-A, B-B
- REVISED 7172-P-801A ILLUSTRATIVE STREET SCENES C-C,D-D
- REVISED 7172-P-1000A PROPOSED ELEVATIONAL TREATMENT TYPES
- REVISED ACOUSTIC REPORT
- REVISED FLOOR PLAN DRAWING 5330-W-306-401.P1 MASEFIELD FF M&E
- REVISED FLOOR PLAN DRAWING 5330-W-501-401.P1 HARWOOD FF M&E
- REVISED 7172-P-005 - EXISTING SITE LAYOUT
- REVISED 7172-P-104B PV_ASP_EV AND WATERBUTT LOCATIONS
- REVISED 7172-P-700A PROPOSED ELEVATIONS - 1B2P FLATS AFF
- REVISED 7172-P-711A PROPOSED ELEVATIONS - BLAKE C
- REVISED 7172-P-713 PROPOSED ELEVATIONS -GOLDING A
- REVISED BIODIVERSITY NET GAIN ASSESSMENT REPORT
- REVISED ECIA-ECOLOGICAL IMPACT ASSESSMENT REPORT
- REVISED LEMP-LANDSCAPE AND ECOLOGY MANAGEMENT PLAN REPORT
- REVISED 22-0867-3301-P04 KERBS AND SURFACE FINISHES LAYOUT-SHEET 2
- REVISED 22-0867-4001-P01 ROAD AND SEWER LONGITUDINAL SECTIONS-SHEET 1
- REVISED 22-0867-6000-P01 HIGHWAY CONSTRUCTION DETAILS
- REVISED 22-0867-6100-P01 ADOPTABLE SEWER CONSTRUCTION DETAILS-SHEET 1
- REVISED 22-0867-6101-P01 ADOPTABLE SEWER CONSTRUCTION DETAILS-SHEET 2
- REVISED 22-0867-C-5000-P05 SECTION 38 AGREEMENT LAYOUT
- REVISED 22-0867-C-6106-P02 HB24 HYDROBRAKE DETAILS
- REVISED 22-0867-C-6107-P03 HB28 HYDROBRAKE DETAILS
- REVISED LANDSCAPE AND VISUAL REPORT
- REVISED 14980_P014H - SOFT LANDSCAPE DRAWING
- REVISED FLOOR PLAN DRAWING 5330-W-306-400.P1 MASEFIELD GF M&E
- REVISED 7172-P-100E SITE LAYOUT
- REVISED 7172 P 103B REFUSE COLLECTION PLAN
- REVISED 7172-P-105A BLOCK CONTEXT LAYOUT
- REVISED 7172-P-206 PROPOSED FLOOR PLANS JOYCE
- REVISED 7172-P-207 PROPOSED FLOOR PLANS TOLKIEN
- REVISED 7172-P-209 PROPOSED FLOOR PLANS BLAKE
- REVISED 7172-P-215 PROPOSED FLOOR PLANS ATWOOD
- REVISED 7172-P-702A PROPOSED ELEVATIONS - 3B5P HOUSE AFF
- REVISED 7172-P-705 PROPOSED ELEVATIONS - ROWLING
- REVISED 7172-P-707 PROPOSED ELEVATIONS - TOLKIEN
- REVISED 7172-P-710 PROPOSED ELEVATIONS -BLAKE A
- REVISED 7172-P-714 PROPOSED ELEVATIONS -MASEFIELD C
- REVISED 7172-P-715 PROPOSED ELEVATIONS -HARWOOD C
- REVISED 7172-P-716 PROPOSED ELEVATIONS - FLAUBERT
- REVISED 7172-P-4000 DAS ADDENDUM
- REVISED 22-0867-3001-P04 ENGINEERING LAYOUT-SHEET 1
- REVISED 22-0867-3002-P03 ENGINEERING LAYOUT-SHEET 2
- REVISED 22-0867-3003-P04 ENGINEERING LAYOUT-SHEET 3
- REVISED 22-0867-3004-P03 ENGINEERING LAYOUT-SHEET 4
- REVISED 22-0867-3300-P04 KERBS AND SURFACE FINISHES LAYOUT-SHEET 1
- REVISED 22-0867-3300-P04 KERBS AND SURFACE FINISHES LAYOUT-SHEET 1
- REVISED 22-0867-4002-P01 ROAD AND SEWER LONGITUDINAL SECTIONS-SHEET 2
- REVISED 22-0867-4003-P01 ROAD AND SEWER LONGITUDINAL SECTIONS-SHEET 3
- REVISED 22-0867-C-4100-P02 ADOPTABLE MANHOLE SCHEDULES
- REVISED 22-0867-C-5100-P04 SECTION 104 AGREEMENT LAYOUT
- REVISED FLOOD RISK ASSESSMENT
- REVISED LIGHT SPILL TECHNICAL REPORT
- REVISED SPILL LIGHT LAYOUT DRAWING
- SEVERN TRENT WATER
- GENERAL - TEMPEST, S
- OBJECTION - EDDOWES, S
- COUNTY ARCHAEOLOGIST
- SEVERN TRENT WATER
- GENERAL - TEGG, J
- SUSTAINABILITY ECOLOGY
- AGENT/OFFICER EMAILADDITIONAL CLARIFICATIONS REQUIRED FROM TG ECOLOGY AND LANDSC
- AGENT/OFFICER EMAIL ADDITIONAL INFORMATION
- ADDITIONAL - GREEN & BLUE INFRASTRUCTURE PLAN
- AGENT/OFFICER EMAIL - SITE LAYOUT
- REVISED LAYOUT DRAWING
- ADDITIONAL - ECOLOGY TECHNICAL NOTE - PLANNING COMMENT RESPONSE
- ADDITIONAL - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN
- AGENT/OFFICER EMAIL ADDITIONAL INFORMATION
- ADDITIONAL - SOFT LANDSCAPE PROPOSALS
- ADDITIONAL - LANDSCAPE & ECOLOGY MANAGEMENT PLAN
- ADDITIONAL - PHASE 2 LAYOUT
- ADDITIONAL - OUTDOOR LIGHTING REPORT
- SUSTAINABILITY ECOLOGY COMMENTS
- SUSTAINABILITY ECOLOGY
- NEWNHAM PHASE 2 LIGHTING STRATEGY
- GCC HIGHWAYS
- NATURAL ENGLAND
- NATURAL ENGLAND ANNEX A
- STROUD DISTRICT COUNCIL
- OBJECTION - FAY, W
- OBJECTION - YORKE, R
- OBJECTION - GUTHRIE, J & RENNIE, C
- OBJECTION - GREENWAY, S
- OBJECTION - GREENWAY, S&J
- MINERALS & WASTE
- STRATEGIC HOUSING OFFICER
- NEWNHAM PARISH COUNCIL
- SUPPORT - SNELL, Z
- ADDITIONAL - LANDSCAPE AND ECOLOGY MANAGEMENT PLAN (LEMP)
- ADDITIONAL - BIODIVERSITY NET GAIN ASSESSMENT
- EXTENSION OF TIME AGREEMENT
- DETAILED SOFT LANDSCAPE PROPOSALS
- ADDITIONAL - CONSTRUCTION ENVIRONMENTAL MANAGEMENT PLAN (CEMP)
- ADDITIONAL - NEWNHAM SHADOW HABITAT ASSESSMENT REGULATIONS ASSESSMENT
- SUSTAINABILITY TREES
- GCC PROW
- EHO - CONTAMINATED LAND OFFICER
- NATURAL ENGLAND
- SUSTAINABILITY ECOLOGY LIKELY SIGNIFICANT EFFECTS
- SUSTAINABILITY ECOLOGY
- STROUD DC ACKNOWLEDGEMENT OF RECEIPT OF CONSULTATION REQUEST
- REVISED HOUSE TYPES 2 DRAWINGS AFFORDABLE PLOTS 40/41/42 43/44 58/59/60 & APARTM
- REVISED PROPOSED STREET ELEVATIONS
- REVISED PHASE 2 ILLUSTRATIVE MASTER PLAN
- ARLINGHAM PARISH COUNCIL
- LEAD LOCAL FLOOD AUTHORITY
- OBJECTION - RICH, N
- REVISED STORM WATER DESIGN CALCULATIONS
- REVISED ROAD SAFETY AUDIT STAGE 1
- REVISED PEDESTRIAN VISIBILITY ASSESSMENT
- REVISED SWEPT PATH ANALYSIS REFUSE VEHICLES
- REVISED ROAD SAFETY AUDIT DECISION LOG
- REVISED CHARACTER AREAS
- REVISED SOLAR PANELS LOCATION
- REVISED BOUNDARY TREATMENTS
- REVISED GARAGE ELEVATION TRIPLE PLOTS 3/4/6 & 53/54/55
- REVISED GARAGE ELEVATION TRIPLE PLOTS 20/21/22
- REVISED GARAGE FLOOR PLANS DOUBLE PLOTS 2, 7, 8, 9 & 10 ADD SINGLE PLOTS 1/5, 1
- REVISED HOUSE TYPE FLOOR PLANS AFFORDABLE PLOTS 28/29/30/31
- REVISED HOUSE TYPE FLOOR PLANS AFFORDABLE PLOTS 45/46/47 48/49 61/62
- REVISED HOUSE TYPE ELEVATIONS BINCHEY PLOTS 50/51
- REVISED HOUSE TYPE ELEVATIONS HARDY PLOTS 5 & 6
- REVISED HOUSE TYPE ELEVATIONS HARWOOD PLOTS 7 & 10
- REVISED HOUSE TYPE ELEVATIONS ROWLING PLOTS 22/23 24/25 26/27
- REVISED HOUSE TYPE ELEVATIONS SHAKESPEARE PLOTS 16/17/ 18
- REVISED HOUSE TYPE ELEVATIONS TENNYSON PLOTS 3 & 4
- REVISED HOUSE TYPE FLOOR PLANS BINCHEY PLOTS 50 7 51
- REVISED HOUSE TYPE ELEVATIONS BLAKE PLOT S 8 & 12
- REVISED HOUSE TYPE FLOOR PLANS TENNYSON PLOT S 3 & 4 20/21
- REVISED HOUSE TYPE FLOOR PLANS SHAKESPEARE PLOTS 16/17/18 52/53
- REVISED HOUSE TYPE FLOOR PLANS ROWLING PLOTS 22/234 24/25 26/27 36/37 38/39
- REVISED HOUSE TYPE FLOOR PLANS HARDY PLOTS 5/6 14/15 54/55
- REVISED HOUSE TYPE FLOOR PLANS APARTMENTS PLOTS 32/33/34/35
- REVISED VISIBILITY ASSESSMENT
- REVISED SWEPT PATH ANALYSIS
- REVISED FLOOD RISK ASSESSMENT
- REVISED GEOMETRIC PLAN
- REVISED SITE LOCATION PLAN
- REVISED BLOCK PLAN
- REVISED BLOCK PLAN AS PROPOSED
- REVISED TOPOGRAPHICAL SURVEY OF EXISTING SITE
- REVISED PHASE 2 SITE LAYOUT
- REVISED PROPOSED STREET ELEVATIONS
- REVISED PROPOSED STREET ELEVATIONS
- REVISED GARAGE ELEVATION QUADRUPLE PLOTS 3/4/6 & 53/54/55
- REVISED GARAGE ELEVATION DOUBLE PLOTS 1/5 2, 15/16, 23/24 & 25/26
- REVISED GARAGE ELEVATION SINGLE PLOTS 17, 18 & 19
- REVISED GARAGE FLOOR PLANS TRIPLE PLOTS 20/21/22 ADD QUADRUPLE PLOTS 36/37/38/3
- REVISED HOUSE TYPE FLOOR PLANS AFFORDABLE PLOTS 40/41/42 58/59/60 43/44
- REVISED HOUSE TYPE ELEVATIONS AFFORDABLE PLOTS 45/46/47 48/49 61/62
- REVISED HOUSE TYPE ELEVATIONS AFFORDABLE PLOTS 56 & 57
- REVISED HOUSE TYPE ELEVATIONS ATTWOOD PLOT 9
- REVISED HOUSE TYPE ELEVATIONS STEINBECK PLOT 11
- REVISED HOUSE TYPE ELEVATIONS BLAKE PLOT 19
- REVISED HOUSE TYPE ELEVATIONS DAHL PLOT 13
- REVISED HOUSE TYPE ELEVATIONS DAHL PLOT 1
- REVISED HOUSE TYPE ELEVATIONS HARDY PLOTS 14/15 54/55
- REVISED HOUSE TYPE ELEVATIONS ROWLING PLOTS 36/37 38/399
- REVISED HOUSE TYPE ELEVATIONS SHAKESPEARE PLOTS 52 & 53
- REVISED HOUSE TYPE ELEVATIONS TENNYSON PLOTS 20 & 21
- REVISED HOUSE TYPE ELEVATIONS STEINBECK PLOT 2
- REVISED HOUSE TYPE FLOOR PLANS STEINBECK PLOT 2
- REVISED HOUSE TYPE FLOOR PLANS STEINBECK PLOT 11
- REVISED HOUSE TYPE FLOOR PLANS HARWOOD PLOTS 7,10
- REVISED HOUSE TYPE FLOOR PLANS DAHL PLOTS 1 AND 13
- REVISED HOUSE TYPE FLOOR PLANS BLAKE PLOTS 8 12 19
- REVISED HOUSE TYPE FLOOR PLANS ATTWOOD PLOT 9
- SEVERN TRENT WATER COMMENTS RECEIVED 28.07.2023
- MINERALS & WASTE
- STROUD DISTRICT COUNCIL
- GCC COMMUNITY INFRASTRUCTURE ATTACHMENT EDUCATION DATA SHEET
- EMAIL FROM GCC COMMUNITY INFRASTRUCTURE
- OBJECTION - MOIR C& G
- OBJECTION - RENNIE - C & J
- GLOS WILDLIFE TRUST
- GCC COMMUNITY INFRASTRUCTURE
- OBJECTION - HIGGINS, N
- OBJECTION - ELLIS-DUNN, A
- OBJECTION - RICH, N
- OBJECTION - GREENWAY, S&J
- OBJECTION - GREENWAY, S&J
- ACKNOWLEDGEMENT FROM STROUD DC TO RECEIPT OF CONSULTATION REQUEST P
- OBJECTION - YORKE, R
- OFFICER REQUEST ADDITIONAL CONSULTEES
- NATURAL ENGLAND
- LEAD LOCAL FLOOD AUTHORITY
- SUSTAINABILITY TREES
- EHO - CONTAMINATED LAND OFFICER
- GENERAL - YORKE, R
- GCC PROW
- OBJECTION - JOHN,S
- LOCATION PLAN AT SCALE 1:2500
- ARBORICULTURAL SURVEY
- THE LOCATION PLAN
- BLOCK PLAN OF THE SITE EXISTING
- CHARACTER AREAS
- PROPOSED STREET ELEVATIONS
- GROUND/FIRST FLOOR PLANS AFFORDABLE 2B/4P PLOT 28/29/30/31/43/44/45/46/47/58/59/
- GROUND/FIRST FLOOR AFFORDABLE 3B/5P PLOT 40/41/42/48/49/61/62
- ECOLOGICAL IMPACT ASSESSMENT
- TRANSPORT ASSESSMENT
- PLANNING STATEMENT
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- TRANSPORT ASSESSMENT
- LANDSCAPE & VISUAL APPRAISAL
- NOISE IMPACT ASSESSMENT
- AFFORDABLE HOUSING STATEMENT
- BLOCK PLAN OF THE SITE PROPOSED
- TOPOGRAPHICAL SURVEY EXISTING SITE
- PHASE 2 SITE LAYOUT
- HOUSE TYPE ELEVATION BLAKE PLOT 11
- HOUSE TYPE ELEVATION BLAKE PLOT 8/12
- HOUSE TYPE ELEVATION BLAKE PLOT 2/19
- HOUSE TYPE ELEVATION DAHL PLOT 13
- HOUSE TYPE ELEVATION DAHL PLOT 1
- HOUSE TYPE ELEVATION HARDY PLOT 14/15/54/55
- HOUSE TYPE ELEVATION HARDY PLOT 5/6
- HOUSE TYPE ELEVATION HARWOOD PLOT 7&10
- HOUSE TYPE ELEVATION ROWLING PLOT 36/37/38/39
- HOUSE TYPE ELEVATION ROWLING PLOT 22/23/24/25/26/27
- DESIGN & ACCESS STATEMENT
- DESIGN & ACCESS STATEMENT PAGE 18 THE VISION
- DESIGN & ACCESS STATEMENT PAGE 19-22 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGES 23 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGE 24-27 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGE 28 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGE 29-32 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGE 33 MASTERPLANNING PRINCIPLES
- DESIGN & ACCESS STATEMENT PAGE 33-39 ARCHITECTURAL PRINCIPLES
- HERITAGE STATEMENT
- FLOOD RISK ASSESSMENT
- GROUND/FIRST FLOOR AFFORDABLE 4B/6P PLOT 56/57
- GROUND/FIRST FLOOR APARTMENTS 1B/2P PLOT 32/33/34/35
- GROUND/FIRST FLOOR ATWWOD PLOT 9
- GROUND/FIRST FLOOR BINCHEY PLOT 50/51
- GROUND/FIRST FLOOR BLAKE PLOT 2/8/11(H)/12/19
- GROUND/FIRST FLOOR DAHL PLOT 1/13
- GROUND/FIRST FLOOR HARDY PLOT 5/6/14/15/54/55
- GROUND/FIRST FLOOR HARWOOD PLOT 7/10
- GROUND/FIRST FLOOR RPWLING PLOT 22/23/24/25/26/27/36/37/38/39
- GROUND/FIRST FLOOR SHAKESPEARE PLOT 16/17/18/52/53
- GROUND/FIRST FLOOR TENNYSON PLOT 3/4/20/21
- HOUSE TYPE ELEVATION AFFORDABLE 2 BED PLOT 28/29/30/31/43/44/45/46/47/58/59/60
- HOUSE TYPE ELEVATION AFFORDABLE 3 BED PLOT 40/41/48/49/61/62
- HOUSE TYPE ELEVATION AFFORDABLE 4 BED PLOT 56/57
- HOUSE TYPE ELEVATION APARTMENTS PLOT 32-35
- HOUSE TYPE ELEVATION ATWOOD PLOT 9
- HOUSE TYPE ELEVATION BINCHEY PLOT 50/51
- STATEMENT OF COMMUNITY INVOLVEMENT.
- COVERING LETTER
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Forest of Dean for determination, against a statutory target of eight weeks. Over the last year Forest of Dean decided full applications in a median of 67 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Land Adjoining Unlawater Lane Newnham Gloucestershire GL14 1BN
Non material amendment to planning permission P1733/18/FUL to allow for revised boundary details.
Granted Amendments 3 docs -
Land Adjoining Unlawater Lane Newnham Gloucestershire GL14 1BN
Non material amendment to planning permission P1733/18/FUL to allow for a revised site layout including the provision of visitor parking to plots 43-50 and 70-72, amendment to window sizes on all plots, brick window heads added to a number of plots (23-25, 65-73) and change to grey fenestration for character areas 2B and 3.
Granted Amendments Windows or glazing 23 docs -
Hill House Unlawater Lane Newnham Gloucestershire GL14 1BJ
T1 Conifer against neighbour's house remove to ground level. T2 Plum next to neighbouring property, prune to give 1.5m clearance. T3 Spruce in back garden reduce to approximately 3m.
Granted Trees 2 docs -
Hill House Unlawater Lane Newnham Gloucestershire GL14 1BJ
Reduce Magnolia by approximately 1-1.5 metres in accordance with BS3998:2010. In order to maintain it at an appropriate size for it's location.
Granted Trees 2 docs -
4 Whetstones Unlawater Lane Newnham Gloucestershire GL14 1BT
Remove one stem from multi-stemmed Alder (2 on sketch plan) and pollard remaining stems to 12 metres. Pollard single stemmed Alder (3) to 12 metres. Pollard three Italian Alders (4, 5 & 6) below previous pollarding points to 8 metres and cut back on north side adjacent to carport. Pollard Crack Willow (7) above main V at approximately 9 metres. Pollard Crack Willow (8) above V on east branch at approximately 8 metres. Pollard Poplar (9) to 2 metres. Pollard two Ash trees (10 and 11) to between 7 and 8 metres.
Granted Trees 7 docs -
3 Whetstones Unlawater Lane Newnham Gloucestershire GL14 1BT
Monolith 3 x Ash trees between drive and brook, to approximately 7 metres due to the presence of Ash Dieback Disease.
Granted Trees 3 docs
Other full applications
In Forest of Dean
-
P1090/26/FUL Awaiting decision
SPP Pumps Ltd Crucible Close Coleford Gloucestershire GL16 8RE
Erection of a semi permanent building providing 342m² of undercover storage for engines and metal fabrications currently stored externally within the existing yard.
-
P0902/26/FUL Granted
Sunnyside Crow Ash Road Berry Hill Coleford Gloucestershire GL16 7RB
Demolition of existing kitchen extension and erection of two storey side extension with single storey wrapping round rear of the property.
-
P0800/26/FUL Granted
Dennel Hill Farmhouse Tidenham Chase Chepstow NP16 7JN
Erection of rear 1.5 storey extension with balcony and first floor extension with balcony to allow for extended first floor level with associated internal alterations and works. Demolition of existing rear conservatory.
-
P0682/26/FUL Granted
7 Woodgate Road Mile End Coleford Gloucestershire GL16 7QE
Proposed Vehicular Access and Parking and associated works
-
P0213/26/FUL Granted
Land At 34 Worrall Hill Gloucestershire GL17 9QE
Erection of a self-build dwelling and associated works