Skip to content
PlanIndex Get alerts
Menu

Planning application

Dungeness A Power Station, Dungeness Power Station, Dungeness Road, Lydd, TN29 9PP

Awaiting decision Folkestone and Hythe 26/1507/FH Other authority consultations

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

KCC Consultation request (KCC/FH/0114/2026) for construction of a replacement shielded storage area for ISO containers, including erection of precast concrete walls, a water shielding wall, gate, partially suspended electrical services, and associated civil engineering work.

As published by the council, reference 26/1507/FH

Application record

Reference
26/1507/FH
Type
Other authority consultations
Status
Valid
Received
11 Sep 2026
Validated
11 Sep 2026
Ward
Walland & Denge Marsh
Parish
Lydd
Postcode
TN29 9PP

Site history

Applications at this address on the Folkestone and Hythe register

This site has had 2 applications since 2026.

  • 26/1467/FH Awaiting decision

    Dungeness A Power Station, Dungeness Power Station, Dungeness Road, Lydd, TN29 9PP

    KCC Consultation request (KCC/FH/0084/2026) for installation of an additional shielding wall to the south elevation and south-west corner of the Active Waste Drum Store within the existing Low Level Active Waste (LLAW) building, comprising modular water filled interlocking blocks (including reuse of existing on site materials), with no excavation or changes to drainage.

    Submitted 4 Sep 2026

Timeline

Dates from the published record

  1. 11 Sep 2026

    Received by Folkestone and Hythe

  2. 22 Sep 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 6 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Folkestone and Hythe took a median of 49 days over the applications it decided in the last year.

Documents

Plans, drawings, consultee responses and the officer's report

3 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Folkestone and Hythe for determination, against a statutory target of eight weeks. Over the last year Folkestone and Hythe's median decision took 49 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Folkestone and Hythe's portal will say. Our guide explains the common types.

Nearby applications

Within 0.3 miles