Planning application
Land adj. Inter-Leisure, Sealand Road, Sealand, Chester, CH1 6EB
Withdrawn before a decision, so it carries no planning weight. A revised scheme can be submitted at any time.
Proposal
A building used for forestry purposes - storage of harvested wood and onward preparation for sale. The building will be made by the applicant and consist of a timber frame that will be timber clad, with a low pitch trussed roof finished in tin.
As published by the council, reference AGN/000684/25
Application record
- Reference
- AGN/000684/25
- Type
- Prior Approval Agriculture
- Status
- Withdrawn
- Decision
- Z01 Withdrawn
- Received
- 8 Aug 2025
- Validated
- 8 Aug 2025
- Decided
- 29 Sep 2025
- Ward
- Flintshire Ward Queensferry and Sealand
- Parish
- Flintshire Community Sealand Community Council
- Decision by
- NON None/Not applicable
- Postcode
- CH1 6EB
Site history
Applications at this address on the Flintshire register
This site has had 2 applications since 2025.
-
FUL/000685/25 Awaiting decision
Land adj. Inter-Leisure, Sealand Road, Sealand, Chester, CH1 6EB
New vehicular access onto A548 - forestry building, track, log storage area, parking area, timber post and rail boundary and associated works
Timeline
Dates from the published record
-
8 Aug 2025
Received by Flintshire
-
29 Sep 2025
Decision issued: Z01 Withdrawn
-
28 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat withdrawal means
The applicant withdrew this application before Flintshire decided it, and is free to submit a revised scheme at any time. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land adj. Inter-Leisure, Sealand Road, Sealand, Chester, CH1 6EB
87% historically approved · decision due ~21 Nov
New vehicular access onto A548 - forestry building, track, log storage area, parking area, timber post and rail boundary and associated works
Awaiting decision Full applications 9 docs -
Birchenfields, Sealand Road, Sealand, Chester, CH1 6BS
To construct a 20m x 12m @ 3.65m tall concrete agricultural slurry store above ground. Elevation and floor plans are submitted with the application. Total capacity of 876m3 and a working capacity of 804m3 after allowing 300mm of freeboard.
Granted Full applications 10 docs
Other prior approval applications
In Flintshire
-
DEM/000725/26 Granted
CHURCH OF THE HOLY SPIRIT, Old Aston Hill, Ewloe, Deeside, CH5 3BF
Application for prior notification of proposed demolition. The building is a church hall within the curtilage of The Church of the Holy Spirit. It is built of sectional concrete with corrugated aluminium roofing.
-
MINPA/000718/26 Awaiting decision
Hendre Limestone Quarry, Denbigh Road, Hendre, Mold, Flintshire
Remediation of Quarry Slip (Phase 2 Works)
-
AGN/000632/26 Granted
Hendy Farm, Babell, Holywell, CH8 8PZ
Agricultural storage
-
AGN/000684/26 Awaiting decision
Land off Ffordd Pennant, Maes Pennant, Holywell, CH8 9PJ
STEEL FRAME AND CLAD STORAGE SHED
-
AGN/000621/26 Refused
GROESFFORDD BACH, Whitford, Holywell, CH8 8SD
The proposed building is for agricultural use as the agricultural business is expanding and the number of livestock increasing. The new building will be used for the storage hay, straw and feed and will be located within close proximity of the existing buildings on the holding. As the number of cattle in particular has increased the purchase and storage of greater quantities of feed and straw is necessary. The applicant also prefers to make say as his view is that is less expensive and more environmentally friendly as there is not use of plastic wrap and fewer tractor operations are required to make it so less diesel is used. To be able to store a greater number of bales and tonnage of feed this building is required