Planning application
CHURCH OF THE HOLY SPIRIT, Old Aston Hill, Ewloe, Deeside, CH5 3BF
Works: Demolition
Permission granted. Work must normally begin within five years of the decision or the permission lapses.
Proposal
Application for prior notification of proposed demolition. The building is a church hall within the curtilage of The Church of the Holy Spirit. It is built of sectional concrete with corrugated aluminium roofing.
As published by the council, reference DEM/000725/26
Application record
- Reference
- DEM/000725/26
- Type
- Prior Approval Demolition
- Status
- Notice of Decision Issued
- Decision
- Granted As published: Z10 Prior Approval Required/Approved
- Received
- 28 Aug 2026
- Validated
- 2 Sep 2026
- Decided
- 11 Sep 2026
- Ward
- Flintshire Ward Hawarden Aston
- Parish
- Flintshire Community Hawarden Community Council
- Decision by
- DEL Delegated - Officer
- Postcode
- CH5 3BF
Timeline
Dates from the published record
-
28 Aug 2026
Received by Flintshire
-
2 Sep 2026
Validated
Checked as complete and ready for consideration.
-
9 Sep 2026
Added to PlanIndex
-
11 Sep 2026
Decision issued: Z10 Prior Approval Required/Approved
-
24 Sep 2026
Status changed to Notice of Decision Issued
Previously Decision Issued.
Documents
Plans, drawings, consultee responses and the officer's report
5 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Flintshire granted permission on 11 September 2026, subject to any conditions on the decision notice. Work must normally begin within five years or the permission lapses. More in our guide to what happens after a planning decision.
About prior approval applications
Prior approval applies where permitted development rights already grant the principle of the work, leaving the council only the specific matters the rules name, commonly within 56 days. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Briarfield, Old Aston Hill, Ewloe, Deeside, CH5 3AH
Construction of a new tarmac driveway with an integrated linear drainage system connected to an internal soakaway. Widening of the existing access onto the B-road to accomodate vehicles, & construction of new replacement front pillars & and a side boundary wall adjacent to the private lane, with a maximum height exceeding 1 meter.
Withdrawn Full applications 10 docsSmall domestic -
Melwood House, Old Aston Hill, Ewloe, Deeside, CH5 3AH
Proposed side and rear extensions, internal alterations and new roof structure
Granted Full applications Extension Roofing 10 docs -
Stokesley Old Aston Hill Ewloe Deeside CH5 3AH
Removal of Dormer window, replace with Velux window. Install 2 x offset windows in rear gable wall (non opening and obscure)
Granted Amendments Loft or dormer Windows or glazing 14 docs -
Land Adjacent to Fern Grove, Ewloe, CH5 3AJ
Approval of details for conditions 3, 4, 5, 6 & 7 for 063076
Granted Conditions 8 docs -
Street Record Church Lane Ewloe Flintshire
Installation of Security Fence and Gates
Granted Prior approval 44 docsSmall domestic -
CRESTA, Old Aston Hill, Ewloe, Deeside, CH5 3AL
First floor side extension over existing garage
Granted Full applications Extension 10 docs
Other prior approval applications
In Flintshire
-
DEM/000804/26 Awaiting decision
COUNTY CIVIC CENTRE, Raikes Lane, Mold, CH7 1AE
Application for prior notification of proposed demolition
-
AGN/000791/26 Awaiting decision
Land off Ffordd Pennant, Maes Pennant, Holywell
Installation of a sub-surface irrigation and water management system
-
AGN/000788/26 Awaiting decision
Groesffordd Bach, Whitford, Holywell, CH8 8SD
The proposed building is for agricultural use as the agricultural business is expanding and the number of livestock increasing. The building will be used for the storage of hay, straw and feed and will be located within close proximity of the existing buildings on the holding. As the number of cattle in particular has increased the purchase of greater quantities of straw and feed is necessary. The business also prefers to make hay rather than silage as the applicant's view is that it is more environmentally friendly as there is no wrap and less tractor operations to make it. To be able to store a greater number of bales and tonnage of feed another building is required.
-
AGN/000684/26 Granted
Land off Ffordd Pennant, Maes Pennant, Holywell, CH8 9PJ
STEEL FRAME AND CLAD STORAGE SHED
-
MINPA/000718/26 Granted
Hendre Limestone Quarry, Denbigh Road, Hendre, Mold, Flintshire
Remediation of Quarry Slip (Phase 2 Works)