Skip to content
PlanIndex Get alerts
Menu

Planning application

26 The Ness Torryburn Dunfermline Fife KY12 8LR

Awaiting decision Fife 26/01776/FULL Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erection of dwellinghouse and associated works

As published by the council, reference 26/01776/FULL

Application record

Reference
26/01776/FULL
Type
Full Planning Permission
Status
Registered
Received
26 Jun 2026
Validated
27 Jul 2026
Ward
West Fife And Coastal Villages
Parish
Torryburn & Newmills
Postcode
KY12 8LR

Timeline

Dates from the published record

  1. 26 Jun 2026

    Received by Fife

  2. 27 Jul 2026

    Validated

    Checked as complete and ready for consideration.

  3. 6 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 September 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Fife took a median of 44 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

46 applications on PlanIndex · across 3 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

43 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Fife for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Helm House Bayview Torryburn Dunfermline Fife KY12 8SW

    21/00283/CND001 Submitted 3 Apr 2024 22m away

    Compliance with condition 1 of approved 21/00283/FULL - BEFORE ANY WORKS START ON SITE; details of the specification and colour of the proposed external finishes shall be submitted to and approved in writing by this Planning Authority in consultation with the Torryburn and Newmills Community Council. No works shall be carried out on site until this Planning Authority has approved these details. Thereafter, the development shall be carried out in accordance with these approved details.

    Granted Conditions 5 docs
  • 1A Bayview Torryburn Dunfermline Fife KY12 8SW

    21/00283/CND011 Submitted 24 Mar 2024 22m away

    Compliance with condition 11 of approval 21/00283/FULL (BEFORE ANY WORKS START ON SITE; details showing the full specification of foundations (including supporting calculations and drawings identifying levels/dimensions in relation to the Forties Pipeline) for the approved dwellinghouse shall be submitted to and approved in writing by Fife Council as Planning Authority in consultation with the pipeline operator (INEOS FPS). The development shall, thereafter be carried out in accordance with any approved details.

    Granted Conditions 6 docs
    Domestic
  • 1A Bayview Torryburn Dunfermline Fife KY12 8SW

    21/00283/CND007 Submitted 24 Mar 2024 22m away

    Compliance with Condition 7 of Planning Permission 21/00283/FULL - BEFORE ANY WORKS START ON SITE; details of a suitable trespass proof fence of at least 1.8 metres in height and located adjacent to Network Rail's boundary shall be submitted to and approved in writing by Fife Council as Planning Authority. The approved fence shall be provided BEFORE THE DEVELOPMENT IS OCCUPIED and shall be retained and maintained for the lifetime of the development.

    Granted Conditions 8 docs
    Small domestic
  • 1A Bayview Torryburn Dunfermline Fife KY12 8SW

    21/00283/CND008 Submitted 24 Mar 2024 22m away

    Compliance with condition 8 of approval 21/00283/FULL (NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures)

    Granted Conditions 6 docs
  • Helm House Bayview Torryburn Dunfermline Fife KY12 8SW

    21/00283/CND012 Submitted 9 Apr 2024 22m away

    Compliance with Condition 12 of Planning Permission 21/00283/FULL - The developer shall consult directly with INEOS FPS to ensure that site construction activities as well as ongoing access to pipeline for inspection, surveys, maintenance and repair, take full account of the Forties Pipeline. Evidence of this consultation process shall be submitted to and approved in writing by Fife Council as Planning Authority BEFOREY ANY WORKS COMMENCE ON SITE)

    Granted Conditions 3 docs
  • Tinian Coach House Upper Main Street Newmills Dunfermline Fife KY12 8SU

    26/00325/FULL Submitted 3 Feb 2026 137m away

    Single storey extension to side of dwelling

    Granted Full applications Extension 7 docs
    Small domestic

In Fife

  • 26/01900/FULL Granted

    The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA

    Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)

    7 Jul 2026 Full applications
  • 26/01862/FULL Granted

    56 High Street Elie Leven Fife KY9 1DB

    Installation of 4 replacement windows to dormer extension to rear of dwellinghouse

    6 Jul 2026 Full applications
  • 26/02417/FULL Awaiting decision

    41 Dronachy Road Kirkcaldy Fife KY2 5QL

    Single storey front and side extension

    1 Sep 2026 Full applications
  • 26/02418/FULL Awaiting decision

    10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ

    Alterations to roof to rear of dwellinghouse

    1 Sep 2026 Full applications
  • 26/01282/FULL Granted

    3 High Street Crail Anstruther Fife KY10 3TA

    Installation of replacement windows and repainting of walls and front door

    5 May 2026 Full applications