Skip to content
PlanIndex Get alerts
Menu

Planning application

Land To South Of Cocklaw Street Kelty Fife

Awaiting decision Fife 26/00953/RCC Roads Construction Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Roads Construction Consent

As published by the council, reference 26/00953/RCC

Application record

Reference
26/00953/RCC
Type
Roads Construction Consent
Status
Awaiting decision
Received
27 Mar 2026
Validated
27 Mar 2026
Ward
Cowdenbeath
Parish
Kelty

Site history

Applications at this address on the Fife register

This site has had 11 applications since 2025: 6 approved, 0 refused.

  • 25/02536/CND004 Awaiting decision

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with condition 4 from application 25/02536/ARC - Play park maintenance

    Submitted 24 Aug 2026 Conditions
  • 25/02536/NMV1 Granted

    Land To South Of Cocklaw Street Kelty Fife

    Approval of matters specified in conditions 3(a, g, h, j); 4(a-x, z); 5(c, d, f); 25(a,b); 30 of application 16/03915/EIA for the erection of 132 residential units and associated works. (Non-Material Variation for various design amendments to Plots 7 to 23 and Plots 35 to 38; and to internal roads approved under 25/02536/ARC).

    Decided 16 Jul 2026 Conditions
  • 25/02536/CND009 Withdrawn

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 9 of Planning Permission 25/02536/ARC - Noise attenuation measures

    Decided 18 Aug 2026 Conditions
  • 25/02536/CND003 Granted

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 3 of Planning Permission 25/02536/ARC - District heat pipeline safeguarding

    Decided 2 Jun 2026 Conditions
  • 25/02536/CND001 Granted

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 1 of Planning Permission 25/02536/ARC - Construction Traffic Management Plan

    Decided 3 Jun 2026 Conditions
  • 25/02536/CND002 Granted

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 2 of Planning Permission 25/02536/ARC - CEMP

    Decided 2 Jun 2026 Conditions
  • 25/00990/CND001 Decided

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 1 of Planning Permission 25/00990/ARC - PRIOR TO ANY WORKS COMMENCING ON SITE, a pre-construction survey for protected species shall be undertaken

    Submitted 2 Feb 2026 Conditions
  • 25/00990/CND002 Decided

    Land To South Of Cocklaw Street Kelty Fife

    Compliance with Condition 2 of Planning Permission 25/00990/ARC - PRIOR TO ANY WORKS COMMENCING ON SITE, a tree protection plan showing the locations of the tree protection barriers

    Submitted 2 Feb 2026 Conditions
  • 25/03119/ADV Granted

    Land To South Of Cocklaw Street Kelty Fife

    Display of two flags and one V-Board (non illuminated)

    Decided 19 Dec 2025 Advertising
  • 25/02536/ARC Granted

    Land To South Of Cocklaw Street Kelty Fife

    Approval of matters specified in conditions 3(a, g, h, j); 4(a-x, z); 5(c, d, f); 25(a,b); 30 of application 16/03915/EIA for the erection of 132 residential units and associated works.

    Decided 1 Apr 2026 Conditions

Timeline

Dates from the published record

  1. 27 Mar 2026

    Received by Fife

  2. 28 Jul 2026

    Added to PlanIndex

  3. 13 Aug 2026

    Status changed to Awaiting decision

    Previously Registered.

  4. Decision

    Awaiting decision

    Decision expected by 22 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Fife took a median of 46 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

RNS Engineering Ltd Agent, an engineering consultancy registered in Penicuik

Active · incorporated 2006 · Penicuik

4 applications on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

32 documents on file for this application

  • DRAFT ROAD BOND PHASE 1 OF 2 Correspondence · 13 Aug 2026
  • DRAFT ROAD BOND PHASE 2 OF 2 Correspondence · 13 Aug 2026
  • 27 - ROAD BOND PHASING PLAN Drawing · 13 Aug 2026
  • REQUEST FOR ROAD BOND Correspondence · 11 Aug 2026
  • DRAFT ROAD BOND Correspondence · 11 Aug 2026
  • DRAFT RCC Draft Decision · 11 Aug 2026
  • 25 - ROAD SIGNS AND MARKINGS LAYOUT (SHEET 1) Drawing · 06 Aug 2026
  • 26 - ROAD SIGNS AND MARKINGS LAYOUT (SHEET 2) Drawing · 06 Aug 2026
  • 19A - REFUSE VEHICLE TRACKING LAYOUT SHEET 1 Amended Drawing · 03 Aug 2026
  • 20A - REFUSE VEHICLE TRACKING LAYOUT SHEET 2 Amended Drawing · 03 Aug 2026
  • 02B - ROAD SETTING OUT LAYOUT (SHEET 1) Amended Drawing · 03 Aug 2026
  • 03B - ROAD SETTING OUT LAYOUT (SHEET 2) Amended Drawing · 03 Aug 2026
  • 04B - ROAD SETTING OUT LAYOUT (SHEET 3) Amended Drawing · 03 Aug 2026
  • 05B - DRAINAGE LAYOUT (SHEET 1) Amended Drawing · 03 Aug 2026
  • 06B - DRAINAGE LAYOUT (SHEET 2) Amended Drawing · 03 Aug 2026
  • 10B - ROAD ADOPTION LAYOUT (SHEET 1) Amended Drawing · 03 Aug 2026
  • 11B - ROAD ADOPTION LAYOUT (SHEET 2) Amended Drawing · 03 Aug 2026
  • 22A - HARD STANDING MATERIAL FINISHES LAYOUT (SHEET 1) Amended Drawing · 03 Aug 2026
  • 23A - HARD STANDING MATERIAL FINISHES LAYOUT (SHEET 2) Amended Drawing · 03 Aug 2026
  • 12A - ROAD CONSTRUCTION DETAILS Amended Drawing · 03 Aug 2026
  • 13B - ROAD KERBING LAYOUT (SHEET 1) Amended Drawing · 03 Aug 2026
  • 14B - ROAD KERBING LAYOUT (SHEET 2) Amended Drawing · 03 Aug 2026
  • 15A - ROAD SWALE DETAILS Amended Drawing · 03 Aug 2026
  • 24 - ROAD SWALE DETAILS SHEET 2 Drawing · 03 Aug 2026
  • 17A - STREET LIGHTING LAYOUT Amended Drawing · 03 Aug 2026
  • 16B - SURFACE WATER DETENTION BASIN DETAILS Amended Drawing · 03 Aug 2026
  • COMMENTS ON RCC SUBMISSION Correspondence · 13 Jul 2026
  • 17 - SUPERSEDED STREET LIGHTING LAYOUT Drawing · 07 Jul 2026
  • 18 - PHOTOGRAPH OF SITE Photo · 07 Jul 2026
  • 19 - SUPERSEDED REFUSE VEHICLE TRACKING LAYOUT SHEET 1 Drawing · 07 Jul 2026
  • 20 - SUPERSEDED REFUSE VEHICLE TRACKING LAYOUT SHEET 2 Drawing · 07 Jul 2026
  • 02A - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 1) Amended Drawing · 07 Jul 2026
  • 03A - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 2) Amended Drawing · 07 Jul 2026
  • 04A - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 3) Amended Drawing · 07 Jul 2026
  • 21 - ROAD SETTING OUT DATA (SHEET 4) Other · 07 Jul 2026
  • 05A - SUPERSEDED DRAINAGE LAYOUT (SHEET 1) Amended Drawing · 07 Jul 2026
  • 06A - SUPERSEDED DRAINAGE LAYOUT (SHEET 2) Amended Drawing · 07 Jul 2026
  • 07A - ROAD LONGITUDINAL SECTIONS (SHEET 1) Amended Drawing · 07 Jul 2026
  • 08A - ROAD LONGITUDINAL SECTIONS (SHEET 2) Amended Drawing · 07 Jul 2026
  • 09A - ROAD LONGITUDINAL SECTIONS (SHEET 3) Amended Drawing · 07 Jul 2026
  • 10A - SUPERSEDED ROAD ADOPTION LAYOUT (SHEET 1) Amended Drawing · 07 Jul 2026
  • 11A - SUPERSEDED ROAD ADOPTION LAYOUT (SHEET 2) Amended Drawing · 07 Jul 2026
  • 22 - SUPERSEDED HARD STANDING MATERIAL FINISHES LAYOUT (SHEET 1) Drawing · 07 Jul 2026
  • 23 - SUPERSEDED HARD STANDING MATERIAL FINISHES LAYOUT (SHEET 2) Drawing · 07 Jul 2026
  • 16A - SUPERSEDED SURFACE WATER DETENTION BASIN DETAILS Amended Drawing · 07 Jul 2026
  • 13A - SUPERSEDED ROAD KERBING LAYOUT (SHEET 1) Amended Drawing · 07 Jul 2026
  • 14A - SUPERSEDED ROAD KERBING LAYOUT (SHEET 2) Amended Drawing · 07 Jul 2026
  • INITIAL COMMENTS ON RCC SUBMISSION Correspondence · 11 May 2026
  • 01 - LOCATION PLAN OS Extract · 27 Mar 2026
  • 02 - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 1) Drawing · 27 Mar 2026
  • 03 - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 2) Drawing · 27 Mar 2026
  • 04 - SUPERSEDED ROAD SETTING OUT LAYOUT (SHEET 3) Drawing · 27 Mar 2026
  • 05 - SUPERSEDED DRAINAGE LAYOUT (SHEET 1) Drawing · 27 Mar 2026
  • 06 - SUPERSEDED DRAINAGE LAYOUT (SHEET 2) Drawing · 27 Mar 2026
  • 07 - SUPERSEDED ROAD LONGITUDINAL SECTIONS (SHEET 1) Drawing · 27 Mar 2026
  • 08 - SUPERSEDED ROAD LONGITUDINAL SECTIONS (SHEET 2) Drawing · 27 Mar 2026
  • 09 - SUPERSEDED ROAD LONGITUDINAL SECTIONS (SHEET 3) Drawing · 27 Mar 2026
  • 10 - SUPERSEDED ROAD ADOPTION LAYOUT (SHEET 1) Drawing · 27 Mar 2026
  • 11 - SUPERSEDED ROAD ADOPTION LAYOUT (SHEET 2) Drawing · 27 Mar 2026
  • 12 - SUPERSEDED ROAD CONSTRUCTION DETAILS Drawing · 27 Mar 2026
  • 13 - SUPERSEDED ROAD KERBING LAYOUT (SHEET 1) Drawing · 27 Mar 2026
  • 14 - SUPERSEDED ROAD KERBING LAYOUT (SHEET 2) Drawing · 27 Mar 2026
  • 15 - SUPERSEDED ROAD SWALE DETAILS Drawing · 27 Mar 2026
  • 16 - SUPERSEDED SURFACE WATER DETENTION BASIN DETAILS Drawing · 27 Mar 2026

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Fife for determination, against a statutory target of eight weeks. Over the last year Fife's median decision took 46 days. More in our guide to how long planning decisions take.

About this record

The published feed does not state which type of application this is; the register entry on Fife's portal will say. Our guide explains the common types.