Planning application
Fair Isle Clinic Fair Isle Road Kirkcaldy Fife
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Erection of 10 no. affordable dwellinghouses, associated infrastructure and landscaping (Section 42 application to vary condition 5 of planning permission 21/03842/FULL)
As published by the council, reference 25/03175/FULL
Application record
- Reference
- 25/03175/FULL
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Application Permitted with Conditions
- Received
- 21 Nov 2025
- Validated
- 25 Nov 2025
- Decided
- 28 Jan 2026
- Ward
- Kirkcaldy North
- Parish
- Templehall (No CC)
- Decision by
- Delegated - Local Developments
Timeline
Dates from the published record
-
21 Nov 2025
Received by Fife
-
25 Nov 2025
Validated
Checked as complete and ready for consideration.
-
28 Jan 2026
Decision issued: Application Permitted with Conditions
-
13 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice
20 applications on PlanIndex · across 4 councils · 100% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
Fair Isle Clinic Fair Isle Road Kirkcaldy Fife KY2 6EE
In compliance with condition 7 for planning application 22/0342/FULL - Before any works start on site, detailed plans showing the location and specification of the new raised pedestrian crossing on Fair Isle Road (located approximately 15- 20 metres South of the centreline of the Lismore Avenue junction) shall be submitted for approval by Fife Council as Planning Authority. Once approved, the raised crossing and ancillary works shall be constructed in accordance with the current Fife Council Making Fife's Places Appendix G and the SCOTS National Roads Guide. These works along with the removal of the existing nib and speed cushions shall be completed and operational, prior to the occupation of the first dwelling.
Granted Conditions 8 docsDomestic -
Fair Isle Clinic Fair Isle Road Kirkcaldy Fife KY2 6EE
Compliance with Condition 2 of Planning Permission 21/03842/FULL - NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures. NO BUILDING SHALL BE OCCUPIED UNTIL remedial action at the site has been completed in accordance with the approved Remedial Action Statement. In the event that remedial action is unable to proceed in accordance with the approved Remedial Action Statement - or contamination not previously considered in either the Preliminary Risk Assessment or the Intrusive Investigation Report is identified or encountered on site - all development work on site (save for site investigation work) shall cease immediately and the planning authority shall be notified in writing within 2 working days. Unless otherwise agreed in writing with the local planning authority, development works shall not recommence until proposed revisions to the Remedial Action Statement have been submitted by the developer to and approved in writing by the planning authority. Remedial action at the site shall thereafter be completed in accordance with the approved revised Remedial Action Statement.
Granted Conditions 5 docs -
Templehall Parish Church Beauly Place Kirkcaldy Fife KY2 6EX
Prior Notification for Demolition of buildings
Granted Other Demolition 11 docs -
This Site Address Is Still To Be Recorded On Our Property Database (temporary Address Used) Fife
Notification of intention to install an 8m high pole - South-East of 66-76 Fair Isle Road, Kirkcaldy
Decided Telecoms 2 docs -
This Site Address Is Still To Be Recorded On Our Property Database (temporary Address Used) Fife
Notification of intention to install a 9m and 2, 8m high poles - West of 23 Alford Avenue, South-East of 201 and South-West of 211 Dunearn Drive, Kirkcaldy
Decided Telecoms 3 docs -
Argos Youth Centre Appin Crescent Kirkcaldy Fife KY2 6EJ
Compliance with Condition of Planning Permission 24/02999/FULL - Visibility Splays
Granted Conditions 4 docs
Other full applications applications
In Fife
-
26/01900/FULL Granted
The Steadings Kinaldy Farm Lathockar St Andrews Fife KY16 8NA
Change of use and refurbishment of steading to form dwellinghouse (Class 9) including installation of windows and doors and rooflights and solar panels including replacement of roofing and formation of hardstanding and ancillary drainage (renewal of 23/00519/FULL)
-
26/01862/FULL Granted
56 High Street Elie Leven Fife KY9 1DB
Installation of 4 replacement windows to dormer extension to rear of dwellinghouse
-
26/02417/FULL Awaiting decision
41 Dronachy Road Kirkcaldy Fife KY2 5QL
Single storey front and side extension
-
26/02418/FULL Awaiting decision
10 Woodhead Street High Valleyfield Dunfermline Fife KY12 8SQ
Alterations to roof to rear of dwellinghouse
-
26/01282/FULL Granted
3 High Street Crail Anstruther Fife KY10 3TA
Installation of replacement windows and repainting of walls and front door