Planning application
Cameron Bridge Distillery Cameron Bridge Standing Stane Road Windygates Leven Fife KY8 5RL
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Compliance with condition 2 of approved 23/00333/FULL - BEFORE THE DEVELOPMENT IS BROUGHT INTO USE details of the replacement tree planting shall be submitted for the approval of the Planning Authority. The scheme as approved shall be implemented within the first planting season following the completion or commencement of the development's use, whichever is the sooner.
As published by the council, reference 23/00333/CND002
Application record
- Reference
- 23/00333/CND002
- Type
- Condition Compliance
- Status
- Decided
- Decision
- Granted As published: Application Permitted - no conditions
- Received
- 29 Nov 2023
- Validated
- 29 Nov 2023
- Decided
- 18 Dec 2023
- Ward
- Leven, Kennoway And Largo
- Parish
- Windygates
- Decision by
- Delegated - Other Consents
- Postcode
- KY8 5RL
Site history
Applications at this address on the Fife register
This site has had 3 applications since 2023: 3 approved, 0 refused.
-
26/00040/CND002 Granted
Cameron Bridge Distillery Cameron Bridge Standing Stane Road Windygates Leven Fife KY8 5RL
Compliance with Condition 2 from application 26/00040/FULL - Replacement tree planting
-
26/00040/FULL Granted
Cameron Bridge Distillery Cameron Bridge Standing Stane Road Windygates Leven Fife KY8 5RL
Change of use of land from woodland to operational railway land and installation of overhead line equipment and erection of fencing (Section 42 application to vary condition 1 of planning permission 23/00333/FULL)
Timeline
Dates from the published record
-
29 Nov 2023
Received by Fife
-
18 Dec 2023
Decision issued: Application Permitted - no conditions
-
26 Sep 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Fife granted permission on 18 December 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About condition discharge and variation applications
This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Cameron Bridge Distillery Cameron Bridge Standing Stane Road Windygates Leven Fife KY8 5RL
Compliance with Condition 2 from application 26/00040/FULL - Replacement tree planting
Granted Conditions 3 docs -
Cameron Bridge Distillery Cameron Bridge Standing Stane Road Windygates Leven Fife KY8 5RL
Change of use of land from woodland to operational railway land and installation of overhead line equipment and erection of fencing (Section 42 application to vary condition 1 of planning permission 23/00333/FULL)
Granted Full applications 10 docs -
Cameron Hospital Cameron Bridge Cameron Road Windygates Leven Fife KY8 5RR
EIA Screening request for demolition of existing vacant buildings and associated site clearance, groundworks and reinstatement works
Decided Outline Demolition 7 docs -
Cameron Bridge Standing Stane Road Windygates Fife
Compliance with Condition 13 of Planning Permission 23/01107/FULL - BEFORE ANY WORKS START ON SITE; an updated, finalised version of the Construction Environmental Management Plan ('CEMP') shall be submitted to, and approved in writing by, Fife Council as Planning Authority. FOR THE AVOIDANCE OF DOUBT, British Standard BS 5228: Part 1: 2009 "Noise and Vibration Control on Construction and Open Sites" and BRE Publication BR456 - February 2003 "Control of Dust from Construction and Demolition Activities" shall be consulted. The CEMP shall also include all mitigation measures for protected species as set out within the Preliminary Ecological Assessment. All construction works shall then be carried out in full accordance with the approved details.
Granted Conditions Demolition 3 docs -
Cameron Bridge Standing Stane Road Windygates Fife
Compliance with condition 2 of approved 23/01107/FULL (NO DEVELOPMENT SHALL COMMENCE ON SITE until the risk of actual or potential land contamination at the site has been investigated and a Preliminary Risk Assessment (Phase I Desk Study) has been submitted by the developer to and approved in writing by the planning authority. Where further investigation is recommended in the Preliminary Risk Assessment, no development shall commence until a suitable Intrusive Investigation (Phase II Investigation Report) has been submitted by the developer to and approved in writing by the planning authority. Where remedial action is recommended in the Phase II Intrusive Investigation Report, no development shall commence until a suitable Remedial Action Statement has been submitted by the developer to and approved in writing by the planning authority. The Remedial Action Statement shall include a timetable for the implementation and completion of the approved remedial measures.
Granted Conditions 16 docs -
Cameron Bridge Standing Stane Road Windygates Fife
Compliance with condition 6 of approved 23/01107/FULL -A signed statement or declaration prepared by a suitably competent person confirming that the site is, or has been made, safe and stable for the approved development shall then be submitted to and approved in writing by Fife Council as Planning Authority BEFORE THE DEVELOPMENT IS BROUGHT INTO USE. This document shall confirm the methods and findings of the intrusive site investigations and the completion of any remedial works and/or mitigation necessary to address the risks posed by past coal mining activity.
Granted Conditions 9 docs
Other condition discharge and variation applications
In Fife
-
23/00973/NMV1 Granted
Craiglea Cottage Ladeddie Farm Ladeddie Pitscottie Cupar Fife KY15 5TY
Two single storey extensions to rear of dwellinghouse, and one single storey to front (Non-Material Variation to raise the roof ridge line of the extension by approximately 0.40 m to accommodate structural steelwork to planning permission 23/00973/FULL)
-
25/01897/NMV1 Granted
Madras College South Street St Andrews Fife KY16 9EJ
Conservation and adaptive reuse of the former Madras College building to create a new academic college (Class 10 Non-residential institutions), including restoration works to listed buildings, enclosure of quadrangle, extension of listed building, public realm improvements, landscaping, and associated works (Non-Material Variation to Various changes proposed in line with discussions with Fife Council officers to planning permission 25/01897/FULL)
-
24/01208/NMV2 Granted
The Old Schoolhouse School Row Brunton Cupar Fife KY15 4NB
Alterations and extension to dwelling, including merging of the Cottage and Old Schoolhouse, erection of single storey extension, new roof to existing conservatory, installation of replacement windows, doors and rooflights (Non-Material Variation from application 24/01208/FULL to a slight tweak to glazing layout to revert to original approved layout)
-
25/02805/CND002 Withdrawn
Town House Cowdenbeath 123 High Street Cowdenbeath Fife KY4 9QB
Compliance with Condition 2 of planning permission 25/02805/LBC -Lighting feature
-
25/02805/CND003 Withdrawn
Town House Cowdenbeath 123 High Street Cowdenbeath Fife KY4 9QB
Compliance with Condition 2 of planning permission 25/02805/LBC -Lighting feature