Proposal
Non Material Change application comprising 1) Addition of walkways accessible via stairs around the top of each digestor/store for dome access. This will eliminate the need for later stage temporary scaffolding accessed via ladders and improve accessibility and H&S for roof inspections, surveying and repairs. 2)Increased diameter of the liquid store to allow additional capacity for future anticipated changes in supply and demand (note height is not increased). 3) Reorientation of the feedstock delivery system adjacent to the digestor/store for improved access. 4) Reorientation of the feedstock building roof so that internal building columns can be removed thus improving internal manoeuvrability for lorry deliveries and machinery. 5) Provision of concrete enclosures around pumping equipment between digestor/stores to allow for a weatherproof environment for both equipment and personnel. 6) Palladine security fencing added to the South of the digestor/stores approved under LA10/2016/1073/F
As published by the council, reference LA10/2026/0780/NMC
Application record
- Reference
- LA10/2026/0780/NMC
- Type
- Non Material Change
- Status
- Under Consideration
- Received
- 11 Aug 2026
- Validated
- 12 Aug 2026
- Ward
- Castlecoole
- Postcode
- BT74 4RL
Site history
Applications at this address on the Fermanagh and Omagh register
This site has had 4 applications since 2024: 2 approved, 0 refused.
-
LA10/2025/1000/F Granted
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Application for installation of processing equipment to produce organic Biofertilisers from digestate in association with Anaerobic plant approved under planning application numbers LA10/2016/1073/F and LA10/2025/0487/NMC.
-
LA10/2025/0878/F Granted
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Installation of a containerised CHP unit in association with Anaerobic plant (Approved under LA10/2016/1073/F, LA10/2024/1214/F and LA10/2025/0487/NMC).
-
LA10/2024/0877/NMC Withdrawn
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Non Material Changes to application LA10/2016/1073/F as follows: 1) Change of colour for finishes from Moss Green to Goosewing Grey. 2) Change of digestor and storage tanks from circular to rectangular and relocation of tank farm to previously approved feedstock storage area. 3) Change from roof mounted biogas storage domes on digesters/storage tanks to fixed concrete roof with a ground mounted biogas storage dome. 4) Change from polythene covered feedstock area with an open feedstock feed mechanism to an enclosed off-loading feedstock mechanism equipped with docking seals and a small covered storage area.
Timeline
Dates from the published record
-
11 Aug 2026
Received by Fermanagh and Omagh
-
12 Aug 2026
Validated
Checked as complete and ready for consideration.
-
14 Aug 2026
Added to PlanIndex
-
25 Aug 2026
Status changed to Under Consideration
Previously Valid.
-
Decision
Awaiting decision
Decision expected by 7 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Fermanagh and Omagh took a median of 47 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Enniskillen
3 applications on PlanIndex
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
7 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Fermanagh and Omagh for determination, against a statutory target of eight weeks. Over the last year Fermanagh and Omagh decided amendment applications in a median of 19 days. More in our guide to how long planning decisions take.
About amendment applications
An amendment application makes limited changes to a permission that already exists; anything beyond modest adjustment needs a fresh application. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Non Material Changes to application LA10/2016/1073/F as follows: 1) Change of colour for finishes from Moss Green to Goosewing Grey. 2) Change of digestor and storage tanks from circular to rectangular and relocation of tank farm to previously approved feedstock storage area. 3) Change from roof mounted biogas storage domes on digesters/storage tanks to fixed concrete roof with a ground mounted biogas storage dome. 4) Change from polythene covered feedstock area with an open feedstock feed mechanism to an enclosed off-loading feedstock mechanism equipped with docking seals and a small covered storage area.
Withdrawn Amendments 7 docs -
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Installation of a containerised CHP unit in association with Anaerobic plant (Approved under LA10/2016/1073/F, LA10/2024/1214/F and LA10/2025/0487/NMC).
Granted Full applications 22 docs -
170m South East of No.9 Lackaghboy Road Lackaghboy Industrial Estate, Enniskillen, BT74 4RL
Application for installation of processing equipment to produce organic Biofertilisers from digestate in association with Anaerobic plant approved under planning application numbers LA10/2016/1073/F and LA10/2025/0487/NMC.
Granted Full applications 23 docs -
Lands approximately 70m north east of 9 Lackaghboy Road, Lackaghboy, Enniskillen BT74 4RL
Letter from manufacturer / installer on software to be installed on wind turbine to prevent shadow flicker (Discharge of condition 4 of approval LA10/2024/0087/F - avoidance of shadow flicker)
Decided Conditions 19 docs
Other amendment applications
In Fermanagh and Omagh
-
LA10/2026/0751/NMC Granted
South West Acute Hospital 124 Irvinestown Road, Enniskillen, BT74 6DN
Minor update to design, allowing 53 spaces from the previous 46 (Ref. LA10/2022/1254/F)
-
LA10/2026/0797/NMC Awaiting decision
lands approx. 150m south west of 1 Killyliss Road, Clabby, Camgart, Tempo, Fermanagh, BT75 0RG
Non-material change to application LA10/2026/0100/F (maintenance workshop/storage shed) to increase buildings floor area.
-
LA10/2026/0793/NMC Awaiting decision
Units 4 and 5, Great Northern Retail Park, Gortmore, Omagh, Tyrone, BT78 5GZ
Non-material change to application LA10/2025/0978/F amending elevation plans and relocation of sprinkler tank and sprinkler housing tank
-
LA10/2026/0790/NMC Awaiting decision
Lands at Strule Shared Education Campus, 10a Gortin Road, Lisanelly, Omagh, Tyrone, BT79 7ZN
Non Material Change comprising: amendment and alterations to building elevation finishes and materials; amendments to doors and provision of additional roller shutter door and staff door; and amendment to building height to Ground Maintenance Building approved under LA10/2024/1155/F.
-
LA10/2026/0608/NMC Granted
9 Drumhack Road, Drumbrughas, Macken, Enniskillen, BT92 3DQ
Non-material change to planning application LA10/2023/1831/F for the orientation of the dwelling.