Skip to content
PlanIndex Get alerts
Menu

Planning application

Orchard Lodge Jobs Lane March Cambridgeshire PE15 9QE

Awaiting decision Fenland F/YR26/0231/F Full Planning Permission

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Erect a detached garage and a carport to front of existing dwelling, formation of a swimming pool and enclosure including outbuildings, garden storage and landscaping (part-retrospective)

As published by the council, reference F/YR26/0231/F

Application record

Reference
F/YR26/0231/F
Type
Full Planning Permission
Status
Pending consideration
Received
16 Mar 2026
Validated
26 Mar 2026
Ward
March South
Parish
March Town Council
Postcode
PE15 9QE

Timeline

Dates from the published record

  1. 16 Mar 2026

    Received by Fenland

  2. 26 Mar 2026

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 21 May 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Fenland took a median of 75 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Morton & Hall Consulting Ltd Agent, registered in Cambridgeshire

Active · incorporated 2005 · Cambridgeshire

191 applications on PlanIndex · across 8 councils · 92% granted

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

  • EMAIL FROM AGENT RE NOISE REPORT Correspondence · 31 Jul 2026
  • NOISE IMPACT ASSESSMENT Report · 31 Jul 2026
  • ANGLIAN WATER Consultee Comment · 09 Jun 2026
  • FDC ENVIRONMENTAL HEALTH Consultee Comment · 24 May 2026
  • EMAIL FROM AGENT & DESCRIPTION CHANGE AGREEMENT Correspondence · 14 May 2026
  • ANGLIAN WATER SERVICES LIMITED Consultee Comment · 28 Apr 2026
  • 10 SPIRE VIEW MARCH Public Comment · 23 Apr 2026
  • 10 SPIRE VIEW MARCH Neighbour Response · 23 Apr 2026
  • FDC ENVIRONMENTAL HEALTH Consultee Comment · 20 Apr 2026
  • MARCH TOWN COUNCIL Consultee Comment · 15 Apr 2026
  • CCC ARCHAEOLOGY Consultee Comment · 01 Apr 2026
  • APPLICATION FORM - WITHOUT PERSONAL DATA Application Form · 26 Mar 2026
  • BIODIVERSITY CHECKLIST Biodiversity Checklist · 26 Mar 2026
  • ELEVATIONS & FLOOR PLANS GARAGE AND CAR-PORT AND STREET SCENE Drawing · 26 Mar 2026
  • ELEVATIONS AND FLOOR PLANS Drawing · 26 Mar 2026
  • LOCATION PLAN, EXISTING & PROPOSED SITE PLANS AND STREET SCENE Drawing · 26 Mar 2026

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Fenland for determination, against a statutory target of eight weeks. Over the last year Fenland decided full applications in a median of 84 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Land South East Of Orchard Lodge Jobs Lane March Cambridgeshire

    F/YR19/1076/NONMAT Submitted 5 Dec 2019 28m away

    Non material amendment Plot 11 - Replace window on right side elevation to door relating to planning permission F/YR15/0290/F (Erection of 20 x 2-storey dwellings comprising of 11 x 4-bed with detached garages and 9 x 4-bed with MIP annexes and integral garages)

    Granted Amendments Windows or glazing 3 docs
  • Land South East Of Orchard Lodge Jobs Lane March Cambridgeshire

    F/YR19/0927/NONMAT Submitted 28 Oct 2019 28m away

    Non-Material amendment: Plot 9 only - Change kitchen window to door to left side elevation and installation of heat source pump to rear relating to planning permission F/YR15/0290/F (Erection of 20 x 2-storey dwellings comprising of 11 x 4-bed with detached garages and 9 x 4-bed with MIP annexes and integral garages)

    Granted Amendments Windows or glazing 1 doc
  • 6 Knights End Road March Cambridgeshire PE15 9QA

    F/YR21/0770/F Submitted 9 Jun 2021 130m away

    Erect a single-storey rear extension and alterations to windows/doors of existing dwelling

    Granted Full applications Extension Windows or glazing 3 docs
    Small domestic
  • Land North Of 6 Knights End Road March Cambridgeshire

    F/YR24/0447/RM Submitted 18 Apr 2024 134m away

    Reserved Matters application relating to detailed matters of appearance, landscaping, layout and scale pursuant to outline permission F/YR21/0164/O to erect 1 x dwelling (single-storey, 2-bed) involving the demolition of existing outbuildings (part retrospective)

    Granted Reserved matters Demolition 44 docs
    Small domestic
  • 19 Knights End Road March Cambridgeshire PE15 9QA

    F/YR26/0386/DE1 Submitted 27 May 2026 169m away

    Demolition of a dwelling

    Decided Other Demolition 6 docs
    Domestic
  • Land North West Of 12 Knights End Road March Cambridgeshire

    F/YR26/0399/CERTLU Submitted 7 May 2026 195m away

    Certificate of Lawful Use (Existing): to seek confirmation of compliance of Condition 1 (commencement of works) of planning permission F/YR20/0473/F (Erect 9 x dwellings involving demolition of existing buildings)

    Decided Lawful development Demolition 6 docs

In Fenland

  • F/YR26/0671/F Awaiting decision

    Potato Processing Plant Weasenham Lane Wisbech Cambridgeshire PE13 2RN

    Erect a fire suppression sprinkler tank and pump house

    7 Sep 2026 Full applications
  • F/YR26/0573/F Granted

    57A Station Road Manea March Cambridgeshire PE15 0HE

    Erect a single-storey extension to the side of existing dwelling involving demolition of porch

    7 Jul 2026 Full applications
  • F/YR26/0673/F Awaiting decision

    27 Linden Drive Chatteris Cambridgeshire PE16 6DZ

    Installation of 1 x Pergola

    4 Sep 2026 Full applications
  • F/YR26/0450/F Granted

    West Fen Farm Whitemoor Road March Cambridgeshire

    Erect an agricultural building (for free range egg production) and the formation of an attenuation pond

    22 May 2026 Full applications
  • F/YR26/0413/F Granted

    Land North Of 120 London Road Chatteris Cambridgeshire

    Erect 1 x dwelling and the formation of an access

    14 May 2026 Full applications