Planning application
Dalderse Sewage Works Falkirk FK2 7XP
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Installation of Solar PV Array and Associated Works
As published by the council, reference P/26/0250/FUL
Application record
- Reference
- P/26/0250/FUL
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 10 Jun 2026
- Validated
- 26 Jun 2026
- Ward
- Falkirk North
- Parish
- No Community Council
- Decision by
- under Delegated Powers
- Postcode
- FK2 7XP
Timeline
Dates from the published record
-
10 Jun 2026
Received by Falkirk
-
26 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 21 August 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Falkirk took a median of 58 days over the applications it decided in the last year.
Documents
The council's own list, drawings first
16 documents on file for this application
Drawings (7)
- Proposed elevation section
- Proposed site plan
- Proposed site plan
- Proposed site plan with topography
- Composite kiosk
- Composite battery storage
- Location plan
Everything on file (16)
- Preliminary ecological appraisal
- Drainage impact assessment
- Drainage impact assessment
- Proposed site plan - 1 of 2
- Proposed site plan - 2 of 2
- Proposed site plan with topography
- Proposed elevation / section
- Composite - kiosk
- Composite - battery storage
- Flood risk assessment
- Flood risk assessment
- Flood risk assessment
- Flood risk assessment
- Location plan
- Non-householder application
- Supporting statement
Watch members (£5 a month) open the document list from here.
Open the documentsWorking a patch? Trade sends you the drawings on every job in your area. 14 days free.
What happens while it is decided
This application is with Falkirk for determination, against a statutory target of eight weeks. Over the last year Falkirk decided full applications in a median of 59 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Site To The South West Of Carrongrange Park Skinflats
Installation of Hydro Scheme including Construction of Powerhouse and Associated Works
-
Site To The South West Of Carrongrange Park Skinflats
Installation of Hydro Scheme including Construction of Powerhouse and Associated Works
Granted Full applications 17 docs -
Visitor Centre The Helix Falkirk FK2 7ZT
Installation of Water Refill Station
Granted Full applications 8 docs -
Small domestic
Other full applications
In Falkirk
-
P/26/0389/FUL Granted
96 Lawers Crescent Polmont Falkirk FK2 0QU
Extension to Dwellinghouse
-
P/25/0470/FUL Granted
74 - 78 High Street Falkirk FK1 1DD
Alterations and Change of use from Class 1A Retail to Sui Generis - Public House at ground floor level and Managers Flat at first floor level.
-
P/26/0370/FUL Granted
Land To The East Of 1 Zetland Drive Zetland Drive Laurieston
Use of Detached Garage as Short Term Let
-
P/26/0392/FUL Granted
6 Grenville Court Falkirk FK1 5JA
Rear Extension and Replacement of Flat Roof with Pitched Roof
-
P/26/0354/FUL Granted
Bainsford Area Bowling Club Davids Loan Falkirk FK2 7RF
Formation of dropped kerb, installation of hardstanding, siting of storage container and erection of boundary fencing.