Planning application
Land To The North East Of Glenbervie Nursery Stirling Road Larbert
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Construction of an AI Data Centre with 300MW Demand Utility Capacity and Car Parking, Landscaping, Roads, Access and Associated Works
As published by the council, reference P/26/0237/FUL
Application record
- Reference
- P/26/0237/FUL
- Type
- Planning Permission
- Status
- Awaiting decision
- Received
- 29 May 2026
- Validated
- 4 Jun 2026
- Ward
- Bonnybridge and Larbert
- Parish
- No Community Council
- Decision by
- by the Planning Committee
Timeline
Dates from the published record
-
29 May 2026
Received by Falkirk
-
4 Jun 2026
Validated
Checked as complete and ready for consideration.
-
27 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 30 July 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Falkirk took a median of 56 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
AAH Planning Consultants Agent, a planning consultancy
46 applications on PlanIndex · across 23 councils · 72% granted
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
162 documents on file for this application
- Consultation response- environmental health (falkirk council)
- Consultation response- environmental health (contaminated land)
- Aecom- technical review and gap analysis
- Consultation response- biodiversity officer
- Consultation response- biodiversity officer
- Consultation response- environmental health (falkirk council)
- Consultation response- health and safety executive (padhi)
- Consultation response- scottish gas networks (sgn)
- Consultation response- scottish environmental protection agency (sepa)
- Consultation response- scottish environmental protection agency (sepa)- appendix
- Consultation response- scottish water (positional statement)
- Consultation response- roads development unit
- Consultation response- falkirk council emergency planning
- Consultation response- falkirk council flooding and drainage
- Consultation response- nature scot
- Consultation response- falkirk council flooding and drainage (appendix)
- Consultation response- historic environment scotland (hes)
- Consultation response- nhs scotland- east region health protection service
- Consultation response- transport scotland
- Consultation response- police scotland
- Consultation response- stirling council roads
- Transport assessment - appendix f
- Consultation response- scottish fire and rescue service
- Consultation response- transport planning unit
- Consultation response- stirling council (planning)
- Consultation response- museum services (archaeological officer)
- Consultation response- scottish water
- Consultation response- health and safety executive (hse)
- Planting schedule - 2 of 5
- Planting schedule - 3 of 5
- Planting schedule - 1 of 5
- Landscape and ecological management plan
- Planting details
- Landscape masterplan
- Planting schedule - 4 of 5
- Planting schedule - 5 of 5
- Design and access statement
- Consultation response- scottish power energy networks (spen)
- Site waste management plan
- Consultation response- coal mining low risk area
- Non-householder application
- Location plan
- Planning statement
- Ecological impact assessment figure 3- phase 1 habitat map
- Ecological impact assessment figure 4- ancient woodland map
- Ecological impact assessment figure 1- site location plan
- Ecological impact assessment figure 2- environmental designations map
- Ecological impact assessment
- Ecological impact assessment figure 5- landscape masterplan
- Ecological impact assessment appendix b- biological records
- Ecological impact assessment appendix h- preliminary roost assessment
- Ecological impact assessment appendix i- biodiversity enhancement plan
- Ecological impact assessment appendix f- grey crested newt study
- Ecological impact assessment appendix g- national vegetation classification stud
- Ecological impact assessment appendix e - otter & water vole survey
- Ecological impact assessment appendix d - butterfly survey.
- Ecological impact assessment figure 2 - woodland survey map
- Ecological impact assessment appendix c- breeding bird survey.
- Ecological impact assessment appendix j - glenbervie dc - woodland survey
- Ecological impact assessment figure 1 - ancient woodland map
- Economic impact assessment (part 1/3)
- Economic impact assessment (part 2/3)
- Economic impact assessment (part 3/3)
- Proposed cross sections
- Gf plan - east data centre
- Pre application consultation (pac) report
- Roof plan - east data centre
- Sections - east data centre
- 2nd floor plan - east data centre
- 3rd floor plan - east data centre
- 1st floor plan - east data centre
- Elevation 4 - east data centre
- Elevation 2 - east data centre
- Elevation 3 - east data centre
- Elevations - east data centre
- Elevation 1 - east data centre
- Gf plan - west data centre
- Proposed site layout
- Roof plan - west data centre
- Sections - west data centre
- 2nd floor plan - west data centre
- 3rd floor plan - west data centre
- 1st floor plan - west data centre
- Elevation 2 - west data centre
- Elevations - west data centre
- Elevation 1 - west data centre
- Masterplan
- Existing and proposed site sections
- Elevation 4 - west data centre
- Elevation 3- west data centre
- Arboricultural impact assessment
- Breeam pre- assessment report
- Lighting strategy and assessment
- Noise impact assessment
- Royal institute of british architects (riba)- stage 2 fire strategy
- Transport assessment
- Archaeological project design
- Preliminary risk assessment
- Climate change resilience statement
- Cultural heritage desk-based assessment
- Eia report chapter 4- reasonable alternatives considered
- Eia report chapter 5- approach to eia
- Eia report chapter 2- the site
- Eia report chapter 3- description of the proposed development
- Eia report chapter 1- introduction
- Eia report chapter 10- summary of residual effects
- Eia report chapter 8- water environment and flood risk
- Eia report chapter 9- landscape and visual impact assessment
- Eia report chapter 6- air quality
- Eia report chapter 7- greenhouse gases
- Eia report figure 3.1b- substation layout
- Eia report appendix 1.1 glossary and abberviations
- Eia report figure 1.1- site location plan
- Eia report figure 3.4b- construction phase 2
- Eia report figure 3.3- cycle storage and car parking
- Eia report figure 4.1e- heritage constraints map
- Eia report figure 4.1g- flood risk map
- Eia report figure 4.1a- considered sites
- Eia report figure 4.1c local development plan designations map
- Eia report figure 3.1a- general arrangement layout
- Eia report figure 1.2- site boundary plan
- Eia report figure 3.4c- construction phase 3
- Eia report figure 3.4a- construction phase 1
- Eia report figure 3.2- general site access diagram
- Eia report figure 4.1d- ecology, landscape and green belt constraints map
- Eia report figure 4.1f utilities constraints map
- Eia report appendix 3.1- outline construction environmental management plan
- Eia report figure 4.1b- considered sites 2
- Eia report figure 4.1h- core paths map
- Eia report figure 6.3- modelled ecological receptors
- Eia report figure 6.4- air quality baseline
- Eia report figure 6.1- site location, flue locations and modelled buildings
- Eia report figure 6.2- human receptor location modelled
- Eia report appendix 5.1- long list and short list committed development
- Eia report appendix 6.5- screening of short listed committed developments
- Eia report appendix 6.3- generator flue parameters
- Eia report appendix 6.4- wind roses
- Eia report appendix 6.1- legislation, policy and guidance
- Eia report appendix 6.2- construction dust risk assessment
- Eia report appendix 9.1- landscape and visual impact assessment figures and draw
- Eia report figure 8.2- potential groundwater dependant terrestrial ecosystem (gw
- Eia report figure 8.1- hydrology overview
- Eia report appendix 8.2- surface water drainage strategy
- Eia report appendix 8.1- flood risk assessment
- Eia report appendix 9.2- landscape and visual impact assessment methodology
- Eia report appendix 9.4- accurate visual representations
- Eia report appendix 9.5 residential visual amenity survey
- Eia report appendix 9.3- viewpoint photographs
- Eia report non-technical summary
- Preliminary ecological appraisal- figure 2
- Preliminary ecological appraisal figure 3- habitat map
- Preliminary ecological appraisal - appendix g - nvc survey
- Preliminary ecological appraisal- figure 1
- Preliminary ecological appraisal
- Preliminary ecological appraisal - appendix f - gcn survey
- Preliminary ecological appraisal - appendix d - butterfly survey
- Preliminary ecological appraisal - appendix e - otter & water vole survey
- Preliminary ecological appraisal - appendix b
- Preliminary ecological appraisal - appendix c - breeding bird survey
- Eia report appendix 8.1- flood risk assessment - annex b
- Eia report appendix 8.1- flood risk assessment - annex c
- Eia report appendix 8.1- flood risk assessment - annex a
Trade members open them from here.
Open the documentsWhat happens while it is decided
This application is with Falkirk for determination, against a statutory target of eight weeks. Over the last year Falkirk decided full applications in a median of 57 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Land To The North Of 192 Stirling Road Stirling Road Larbert
98% historically approved · decision due ~27 Oct
Construction of Dwellinghouse
Awaiting decision Full applications 12 docsDomestic -
Land To The South Of Glenbervie Nursery Stirling Road Larbert
98% historically approved · decision due ~14 Oct
Construction of 12 Dwellinghouses with Associated Garages, Landscaping, Boundary Treatments and Infrastructure
Awaiting decision Full applications 19 docsMajor scheme -
Land To The South Of Glenbervie Nursery Stirling Road Larbert
Construction of 12 Dwellinghouses, Garages, Landscaping, Boundary Treatments and Associated Infrastructure
Withdrawn Full applications 13 docsMajor scheme -
Glenbervie Nursery 85 Stirling Road Larbert FK5 4SQ
Alterations and Extension to Dwellinghouse
Granted Full applications ExtensionDomestic -
The Bruce Glenbervie Larbert FK5 4EG
98% historically approved · decision due ~13 Oct
Alterations to Restaurant, New Cladding, Entrance Doors, Paving, Sculpture, Jumbrella, External Lighting, AC Condensers and Kitchen Ventilation
Awaiting decision Full applications 11 docs -
31 Logie Drive Larbert FK5 4EA
98% historically approved · decision due ~3 Nov
Extension to Dwellinghouse (Dormer)
Awaiting decision Full applications Extension Loft or dormer 6 docsDomestic
Other full applications
In Falkirk
-
P/26/0225/FUL Granted
48A Grahams Road Falkirk FK1 1HR
Alterations to Shopfront and Installation of Roller Shutters (Retrospective)
-
P/26/0296/FUL Granted
18 Craigleith Road Grangemouth FK3 0AJ
Extension to Dwellinghouse
-
P/26/0288/FUL Granted
28 Killin Drive Polmont Falkirk FK2 0QQ
Alterations to Garage Roof
-
P/26/0290/FUL Granted
Unit 4 Bowhouse Terrace Bowhouse Road Grangemouth
Installation of Door
-
P/26/0201/FUL Granted
75 High Street Falkirk FK1 1ES
Partial Change of Use from Cafe (Class 3) to Gaming Centre (Sui Generis)