Skip to content
PlanIndex Get alerts
Menu

Planning application

P/25/0106/NMV01

Billy Mills Body Shop Castlelaurie Industrial Estate Bankside Falkirk FK2 7XF

Awaiting decision Falkirk 1st Non Material Variation

Proposal

Amendement to P/25/0106/FUL - Demolition, Construction of Offices/Business Premises (Class 4/Class 11), Alteration and Change of Use of Existing Class 5 (General Industrial) Building to Fitness Studios (Class 11) and Associated Parking and Garden Area.

As published by the council, reference P/25/0106/NMV01

Timeline

Dates from the published record

  1. 18 Dec 2025

    Received by Falkirk

  2. 27 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Falkirk for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • P/23/0046/NMV01 Awaiting decision

    Land To The South East Of Merchiston Industrial Estate Smith Street Falkirk

    Amendment to P/23/0046/FUL - Formation of 43MW Battery Energy Storage System and Associated Infrastructure

    1 Jun 2026 134m away Conditions
  • P/25/0377/FUL Granted

    Site To The North East Of 15 Merchiston Industrial Estate Falkirk

    Installation of Replacement Telecommunications Apparatus and Ancillary Development

    29 Aug 2025 222m away Full applications
  • P/26/0209/FUL Awaiting decision

    Unit 3 St Johns Sawmill Etna Road Falkirk FK2 9EG

    Change of Use from Trade Counter/Industrial (Class 5/6) to Class 11 Assemble and Leisure

    6 May 2026 295m away Full applications
  • Plot 4 Lammermoor Avenue Abbotsford Business Park Falkirk

    Compliance with Conditions 2 and 3 of P/22/0066/FUL - Construction of 2 Industrial Buildings (Class 5)

    9 Sep 2025 317m away Conditions
  • L/26/0003/S50 Awaiting decision

    6 Castle Drive Falkirk FK2 7UX

    Application for Secton 50 Planning Certificate

    16 Jun 2026 321m away
  • Land To The West Of Asda Depot Orchardhall Way Abbotsford Business Park Falkirk

    Compliance with Conditions of P/25/0052/FUL - Construction of Workshop and Office Building (Class 4), Including Formation of Access Roads and Associated Development

    10 Feb 2026 334m away Conditions

In Falkirk

  • P/26/0082/COND02 Awaiting decision

    Land To The South East Of Whitstonedge Falkirk

    Compliance with Conditions of P/26/0082/FUL - Construction of Dwellinghouse and Associated Development

    14 Jul 2026 Conditions
  • P/25/0130/NMV01 Awaiting decision

    Site To The South West Of Grange Works Earls Road Grangemouth

    Amendment to P/25/0130/FUL - Construction of Microalgae Production Plant Comprising Buildings, Plant, Access and Associated Works

    9 Jul 2026 Conditions
  • P/25/0144/COND01 Awaiting decision

    Site To The East Of Middle Banknock Longcroft

    Compliance with Conditions of P/25/0144/FUL - Construction of 2 Dwellinghouses and Garages

    9 Jul 2026 Conditions
  • P/26/0004/COND01 Awaiting decision

    Site To The East Of Middle Banknock Longcroft

    Compliance with Conditions of P/25/0144/FUL - Construction of 2 Dwellinghouses and Garages

    9 Jul 2026 Conditions
  • P/25/0330/NMV01 Decided

    The Hub 1 East Gateway Beancross Road Grangemouth FK3 8WH

    Amendment to P/25/0330/FUL - Alteration and Partial Change of Use from Business Centre (Part Ground Floor) to Vehicle Hire Business (Sui Generis), Including Extension to Car Park and Construction of Wash Bay

    6 May 2026 Conditions