Planning application
Revetment, Hinkley Point A Site, Stogursey, TA5 1YA
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Structural alterations to a revetment to include reprofiling of the bank
As published by the council, reference 3/32/22/008
Application record
- Reference
- 3/32/22/008
- Type
- Full Planning Permission
- Status
- Decided
- Decision
- Granted As published: Grant
- Received
- 24 Mar 2022
- Validated
- 19 Apr 2022
- Decided
- 9 Mar 2023
- Ward
- (SWT)Quantock Vale
- Parish
- Stogursey
- Decision by
- Delegated
- Postcode
- TA5 1YA
Timeline
Dates from the published record
-
24 Mar 2022
Received by Exmoor National Park
-
19 Apr 2022
Validated
Checked as complete and ready for consideration.
-
9 Mar 2023
Decision issued: Grant
-
2 Aug 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
22 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat this grant of permission means
Exmoor National Park granted permission on 9 March 2023, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
Hinkley Point A- Encapsulation Plant Nr Bridgwater Somerset TA5 1YA
Application For Non-Material Amendment pursuant to Planning Permission 3/32/17/005 for the construction and operation of a Waste Encapsulation Plant
Granted Amendments -
Hinkley Point C - Connection Project Hinkley Point Road Stogursey Bridgwater Somerset TA5 1YA
Details to satisfy Requirement 24 (1) - Scheme of marking The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Withdrawn Conditions Extension 5 docs -
Hinkley Point A, Hinkley Point Road, Stogursey, TA5 1YA
Installation of a ventilation discharge stack to the concrete box loading facility (Building 124) with associated concrete slab, shield wall and crash barrier
Granted Other 2 docs -
Hinkley C Connection Project Hinkley Point Road Stogursey Bridgwater TA5 1YA
95% historically approved · decision due ~22 Apr
The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Awaiting decision Conditions Extension 9 docs -
Hinkley C Connection Project Hinkley Point Road Stogursey Bridgwater TA5 1YA
95% historically approved · decision due ~5 May
The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Awaiting decision Conditions Extension 4 docs -
Hinkley Point C - Connection Project Hinkley Point Road Stogursey Bridgwater Somerset TA5 1YA
National Grid Hinkley Point C - connection Project The National Grid (Hinkley Point C Connection Project) Order 2016 (as amended) Planning Inspectorate Reference Number: EN020001 Discharge of Requirement 26 – Traffic Incident Management Plan for Stage 7.2 of the authorised development The Project comprises the following elements: - Construction of a 57km 400kV electricity transmission connection between Bridgwater in Somerset and Seabank, near Avonmouth, comprising: Installation of a 400kV overhead line (OHL). Installation of 400kV underground cables. - Modifications to existing OHLs at Hinkley Point, Somerset. - Construction of three 400kV Cable Sealing End (CSE) compounds along the route of the connection. - Construction of a 400/132kV substation at Sandford, North Somerset. - Extension of the existing 400kV substation at Seabank. - The removal of existing 132kV OHLs and the construction of replacement 132kV OHLs and 132kV underground cables. - Extensions/modifications to existing 132kV substations at Churchill, Portishead, Avonmouth and Seabank. - Associated works, for example, temporary access roads, highway works temporary construction compounds, scaffolds, work sites and ancillary works.
Withdrawn Conditions Extension 4 docs
Other full applications
In Exmoor National Park
-
08/26/00087 Granted
Royal Clarence House, High Street, Bridgwater, Somerset, TA6 3BH
Internal reconfiguration works to create separate office units.
-
08/26/00086 Granted
Morrisons, Broadway, Bridgwater, Somerset, TA6 3LN
Creation of electric vehicle (EV) charging zone, including erection of EV charging points, canopy, sub-station enclosure, low voltage (LV) panel, meter cabinet, plant room and associated works.
-
53/26/00014 Granted
12 Grays Avenue, Westonzoyland, Bridgwater, Somerset, TA7 0HP
Erection of single storey rear extension
-
18/26/00006 Granted
2 Fowlers Farm Cottages, Fowlers Plot Road, Chedzoy, Bridgwater, TA7 8RH
Erection of two storey side extension (South) and single storey rear extension (West).
-
46/26/00005 Granted
SUTTON MILL FARM, Moor Road, Sutton Mallet, Bridgwater, Somerset, TA7 9AR
Construction of Agricultural Livestock Building