Planning application
16 Southernhay West Exeter EX1 1PJ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Change of use from offices to a single dwelling, with associated works.
As published by the council, reference 26/1453/FUL
Application record
- Reference
- 26/1453/FUL
- Type
- Full Planning Permission
- Status
- Pending Consideration
- Received
- 30 Sep 2026
- Validated
- 30 Sep 2026
- Ward
- St Davids
- Postcode
- EX1 1PJ
Comment by 1 November 2026
The council is taking comments on this application until then. Have your say on Exeter's portal.
Site history
Applications at this address on the Exeter register
This site has had 2 applications since 2026.
-
26/1454/LBC Awaiting decision
16 Southernhay West Exeter EX1 1PJ
Works associated with change of use from offices to a dwelling including removal of rear outrigger, removal of partition walls, replacement basement staircase and installation of solar panels.
Timeline
Dates from the published record
-
30 Sep 2026
Received by Exeter
-
6 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 25 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Exeter took a median of 52 days over the applications it decided in the last year.
Who's behind it
Company information only, from the register and Companies House
Tristram Stott Architects Agent, an architecture practice
13 applications on PlanIndex · across 2 councils
Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.
See their track recordDocuments
Plans, drawings, consultee responses and the officer's report
Documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Watch members (£5 a month) open the document list from here.
Open the documentsWhat happens while it is decided
This application is with Exeter for determination, against a statutory target of eight weeks. Over the last year Exeter decided full applications in a median of 72 days. More in our guide to how long planning decisions take.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 0.3 miles
-
16 Southernhay West Exeter EX1 1PJ
86% historically approved · decision due ~25 Nov
Works associated with change of use from offices to a dwelling including removal of rear outrigger, removal of partition walls, replacement basement staircase and installation of solar panels.
Awaiting decision Heritage and listed buildings ExtensionDomestic -
13-15 Southernhay West Exeter EX1 1PL
Internal works including the removal of partition walls and works to rectify collapsed floor.
Withdrawn Heritage and listed buildings 26 docs -
14 Cathedral Close Exeter EX1 1EZ
Alterations to walls/partitions, doors and floors/skirting at basement and ground floor level, alterations to doors on first and second floors, partition wall on second floor, new lift shaft in basement, installation of Mechanical Ventilation for Heat Recovery (MVHR) and air conditioning systems including extraction cowl/faceplates on east and north elevations and new entrance door on north elevation
Granted Heritage and listed buildings 24 docs -
14 Cathedral Close Exeter EX1 1EZ
Insertion of new entrance door on north elevation, Mechanical Ventilation with Heat Recovery (MVHR) extraction cowl on east elevation and air conditioning faceplates on north elevation
Granted Full applications 24 docs -
9 Southernhay West Exeter Devon EX1 1JG
T1 - Japanese Maple - Reduce 30% + re-shape
Granted Trees 3 docs -
8 Southernhay West Exeter EX1 1JG
86% historically approved · decision due ~25 Sep
Basement extension, changes to internal layouts, replacement dormer roofs, new staircase, new plant room, and photovoltaic panels
Awaiting decision Heritage and listed buildings Extension Loft or dormer 43 docs
Other full applications
In Exeter
-
26/1024/FUL Granted
6 Majorfield Road Topsham EX3 0ES
Replacement roof for kitchen extension with slate tile, revised pitch and rooflights. Replace downpipes and guttering with wider metal pipes and repair damage to the open eaves maintaining air flow
-
26/0105/FUL Withdrawn
Tickle And Reynolds 83 Heavitree Road Exeter EX1 2ND
Change of use, refurbishment and extension of existing property into nine flats, and associated works
-
26/1080/FUL Granted
Exeter Tool Shop Thurlow Road Exeter EX4 7AA
Replace timber shopfront with aluminium frame shopfront with secure glazing windows.
-
25/0895/FUL Granted
Site Of Royal Clarence Hotel Cathedral Yard Exeter EX1 1HD
Redevelopment of the Royal Clarence, to include 25 new residential dwellings on the upper floors with part residential on the ground and part basement floor. Commercial on the remaining ground and basement floor as a public house and restaurant.
-
26/1265/FUL Granted
21 Brookway Exeter EX1 3JJ
Installation of uPVC double-glazed windows to enclose the existing front balcony area.