Skip to content
PlanIndex Get alerts
Menu

Planning application

Lyndhurst Streatham Rise Exeter EX4 4PE

Awaiting decision Exeter 26/1145/FUL Full Planning Permission

Works: Extension

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Extension to rear patio to form garden room

As published by the council, reference 26/1145/FUL

Application record

Reference
26/1145/FUL
Type
Full Planning Permission
Status
Pending Consideration
Received
30 Jul 2026
Validated
11 Aug 2026
Ward
Duryard And St James
Postcode
EX4 4PE

Timeline

Dates from the published record

  1. 30 Jul 2026

    Received by Exeter

  2. 11 Aug 2026

    Validated

    Checked as complete and ready for consideration.

  3. 16 Aug 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 6 October 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Exeter took a median of 50 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Beaworthy

9 applications on PlanIndex · across 2 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

8 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

The process from here

This application is with Exeter for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Harepath Streatham Rise Exeter EX4 4PE

    24/0433/TPO Submitted 18 Apr 2024 64m away

    T1 - Weeping Willow - re-pollard Willow back to original pollard points, leaving the tree at a height of approximately 4 metres and 4 m lateral spread. The re-growth is weakly attached to the tree due to decay round the pollard points.

    Granted Trees 6 docs
  • Greencroft Streatham Rise Exeter EX4 4PE

    24/0937/DIS Submitted 15 Aug 2024 69m away

    Discharge of conditions 4, 5, 6, 7 and 8 of Planning Permission Ref. 20/1104/FUL, granted 22 October 2021, relating to Construction Method Statement, drainage, tree protection, energy efficiency and materials

    Granted Conditions Trees 19 docs
  • Greencroft Streatham Rise Exeter EX4 4PE

    26/0519/LED Submitted 8 Apr 2026 69m away

    Commencement of Planning Permission Ref. 20/1104/FUL (granted on 22 October 2021), relating to the demolition of Greencroft and its replacement with two new dwellings, within 3 years of the decision date (as required by Condition 1)

    Decided Lawful development New dwelling Demolition 12 docs
    Several homes
  • Greencroft Streatham Rise Exeter EX4 4PE

    24/0714/FUL Submitted 21 Jun 2024 69m away

    Detached garage/office building, including solar panels on roof, in rear garden

    Refused Full applications 22 docs
  • Streatham House Streatham Rise Exeter EX4 4PE

    25/1585/TPO Submitted 7 Nov 2025 82m away

    T1 Pine - Crown lift to 4ft. Due to low branches encroaching into driveway. T2 Purple plum - Thin internal branches and reduce crown by 0.5m. Group 1 - Prune low overhang over drive way by 1-3 m back to boundary and up to a height of approximately 6m, with cuts no bigger than 60mm. This is to mitigate branches encroaching over applicants property.

    Granted Trees 6 docs
  • 7 Kilbarran Rise Exeter EX4 4AA

    26/0014/FUL Submitted 6 Jan 2026 121m away

    Single storey rear extension.

    Granted Full applications Extension 13 docs
    Small domestic

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications