Skip to content
PlanIndex Get alerts
Menu

Planning application

26/0914/TELN

Base Station Site At Marypole Head Pennsylvania Road Exeter

Decided Exeter Telecomms Apparatus Notification

Proposal

Notification under the electronic Communications code regulations 2003 (as amended) to utilise permitted development rights at existing base station site at Marypole Head, Pennsylvania Road

As published by the council, reference 26/0914/TELN

Timeline

Dates from the published record

  1. 10 Jun 2026

    Received by Exeter

  2. 23 Jun 2026

    Decision issued: Permission not required

  3. 26 Jul 2026

    Added to PlanIndex

After the decision

The process from here

The council has decided this application; the published outcome sits in the record above and the decision notice on the council portal carries the detail, including any conditions.

If permission was granted, work must normally begin within three years of the decision. If it was refused, the applicant can appeal within the statutory time limit or submit a revised scheme.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 26/0440/TPO Split decision

    6 Curlew Way Exeter EX4 4SW

    136 Monterey Pine Reduce height by approximately 4m. Maximum diameter of cuts 150mm. Exposed to new wind stresses. Slight reduction reducing the forces exerted on the main stem during periods of severe weather. 137 Oak Remove southern limb at 4.5m bifurcation, diameter of cut approximately 250mm. 142 Oak Crown lift to south by removing two lowest live branches back to trunk 137 & 142 - Trees weighted over the garden having suppressed by the other trees growing to the north. Reduce dominance over the property. 143 Oak Remove. Unable to reach its full potential. 144 Oak Remove southern stem. Leans at an excessive angle over the gardens to the south.

    25 Mar 2026 60m away Trees
  • 21/0922/PD Granted

    6 Curlew Way Exeter Devon EX4 4SW

    Single storey rear extension extending a maximum 5.7 m from rear elevation, height to eaves 2.7m and maximum overall height 3.3m.

    7 Jun 2021 80m away Prior approval
  • 21/0930/TPO Granted

    157 Pennsylvania Road Exeter Devon EX4 5DF

    Identified as T1 on the sketch plan. It is an English Oak TPO no.338. The tree is healthy but has developed the "stag's head" common these days on many oaks which in my opinion is down to our changing climate though can also be in part due to stress around root area. Anyway, it has developed dead wood predominantly in the center at the top of the crown and it is this bear wood that we wish to remove for safety reasons aswell as improving the appearance. The largest of these is maximum 3 metres long and approximately 6 inches diameter where it would be removed. There are 5 other smaller dead branches near to this (to the side and below) that are clear to see which we would also like to remove.

    9 Jun 2021 91m away Trees
  • 26/0439/LPD Decided

    9 Curlew Way Exeter EX4 4SW

    Certificate of Lawfulness for proposal to remove the existing external stairs, sliding front sliding doors and recess entrance door to infill with bricked wall and one window.

    25 Mar 2026 107m away Lawful development
  • 22/1327/PDA Granted

    9 Curlew Way Exeter Devon EX4 4SW

    Prior approval application (Class AA) to add an additional storey to dwelling house.

    30 Aug 2022 113m away Prior approval
  • 25/1127/FUL Granted

    9 Curlew Way Exeter EX4 4SW

    Replace garage door with 1x window and door to form new entrance porch.

    19 Aug 2025 115m away Full applications

In Exeter

  • 26/0670/TELN Decided

    SWEB Mast Osprey House Osprey Road Sowton Industrial Estate Exeter EX2 7WN

    Notification under Regulation 5 of the Electronic Communications Code Regulations 2003 to Utilise Permitted Development Rights upgrade our existing telecommunications installation at SWEB MAST

    10 Apr 2026 Telecoms
  • 26/0503/TELN Decided

    6 Iron Bridge Exeter EX4 3RB

    The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus

    2 Apr 2026 Telecoms
  • 26/0616/TELN Decided

    Rougemont Telephone Exchange Queen Street Exeter EX4 3TL

    Upgrades under permitted development. Removal of 3 antenna, and installation of 6 antenna and 3 large radio units, 9 medium radio units (RRU-L) and 6 smaller radio units (RRU-S) mounted on new metal rail and ancillary radio equipment support poles on top of existing mast.

    29 Apr 2026 Telecoms
  • 26/0232/PNT Refused

    Land At Isca Arena Car Park Isca Centre Summer Lane Exeter EX4 8NT

    Installation of a 25m lattice tower, 6 no. antenna apertures, 4 no. 600mm transmission dishes, 4 no. equipment cabinest and development ancillary thereto inside an 11m x 11m compound enclosed by Cochrane Clearvu fencing with a double access gate.

    17 Feb 2026 Telecoms
  • 26/0361/TELN Granted

    Footpath Past 6 Widecombe Way

    The Electronic Communications Code (Conditions and restrictions) Regulations 2003 (as amended) - Regulation 5 Notice of Intention to Install Fixed Line Broadband Apparatus.

    10 Mar 2026 Telecoms