Planning application

1 The Mede Pinhoe Exeter EX4 8ED

Granted Exeter 26/0549/DIS Discharge of Conditions

Relates to 25/1460/FUL

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Discharge of condition 3 (Construction Method Statement) of 25/1460/FUL determined on 04/12/2025

As published by the council, reference 26/0549/DIS

Application record

Reference
26/0549/DIS
Type
Discharge of Conditions
Status
Permitted
Decision
Condition(s) Fully Discharged
Received
15 Apr 2026
Validated
15 Apr 2026
Decided
27 Apr 2026
Ward
Pinhoe
Decision by
Delegated Decision
Postcode
EX4 8ED

Site history

Applications at this address on the Exeter register

This site has had 2 applications since 2025: 2 approved, 0 refused.

  • 25/1460/FUL Granted

    1 The Mede Pinhoe Exeter EX4 8ED

    Single story extension to the rear of dwelling.

    Decided 4 Dec 2025 Full applications

Timeline

Dates from the published record

  1. 15 Apr 2026

    Received by Exeter

  2. 27 Apr 2026

    Decision issued: Condition(s) Fully Discharged

  3. 26 Jul 2026

    Added to PlanIndex

Cases linked to this one on the register

  • 25/1460/FUL Granted

    1 The Mede Pinhoe Exeter EX4 8ED

    Single story extension to the rear of dwelling.

    Decided 4 Dec 2025 Full applications

Who's behind it

Company information only, from the register and Companies House

Rainbow Living SW Agent, registered in Exeter

Active · incorporated 2018 · Exeter

1 application on PlanIndex

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Exeter granted permission on 27 April 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About condition discharge and variation applications

This application deals with conditions on an existing permission, supplying the details a condition requires or asking to vary or remove one, without reopening the permission itself. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • 14 The Mede Pinhoe Exeter EX4 8ED

    25/1054/PD Submitted 4 Aug 2025 20m away

    Proposed single storey rear extension.

    Granted Prior approval Extension 8 docs
    Small domestic
  • 1 The Mede Pinhoe Exeter EX4 8ED

    25/1460/FUL Submitted 20 Oct 2025 52m away

    Single story extension to the rear of dwelling.

    Granted Full applications Extension 18 docs
    Domestic
  • 86 Whipton Village Road Exeter EX4 8AL

    24/1148/TPO Submitted 3 Oct 2024 101m away

    T1 Liquidambar styraciflua - to fell tree as has become too large for its situation at the front of my property 86 Whipton Village Road, the tree is in raised position approximately three feet above the pavement and branches are causing an obstruction to pedestrians and cyclists using the pavement. The tree is causing damage to the retaining wall between my property and the pavement of Whipton Village Road. The tree is also pushing the boundary wall between my property and my neighbours property 84c. The roots are damaging drains under the pavement of Whipton village Road leading to rat holes apearing amongst the roots at the base of the tree. Please see photos enclosed with application.

    Granted Trees 12 docs
    Small domestic
  • 9 Thackeray Road Exeter EX4 8HD

    25/1398/FUL Submitted 8 Oct 2025 137m away

    Single-storey side extension and extension to rear decking.

    Granted Full applications Extension 9 docs
    Small domestic
  • 3 Thackeray Road Exeter EX4 8HD

    26/0973/LPD Submitted 29 Jun 2026 150m away

    Certificate of Lawfulness for rear, flat roof dormer, relocation of one rear elevation window and 3x front rooflights.

    Granted Lawful development Loft or dormer Windows or glazing 8 docs
  • 29 Thackeray Road Exeter EX4 8HD

    24/0753/PD Submitted 3 Jul 2024 181m away

    Construction of rear bedroom extension and conversion of existing out-building.

    Granted Prior approval Extension 9 docs

In Exeter

  • 26/1376/DIS Awaiting decision

    14 Park Lane Exeter EX4 9HL

    Discharge of Condition 4 of Planning Permission Ref. 25/1816/FUL, granted on 05 March 2026, relating to drainage

    13 Sep 2026 Conditions
  • 26/1064/DIS Split decision

    5 Tresillian Gardens Topsham EX3 0BA

    Discharge of Conditions 3, 5, 9 and 10 of Planning Permission Ref. 12/0590/FUL, granted on 13 September 2012, relating to materials, landscaping, finished floor levels and ridge heights and provision for nesting swifts

    15 Jul 2026 Conditions
  • 26/1208/DIS Granted

    22 The Strand Topsham EX3 0AS

    Discharge Condition 4 (Materials) of the previously approved 25/0470/FUL

    10 Aug 2026 Conditions
  • 26/1365/DIS Awaiting decision

    Hill Barton Farm Hill Barton Road Exeter

    Discharge conditions 7 (Construction Method Statement) and 11 (Waste Audit Statement) of planning permission 21/1701/OUT - Outline Planning Application for construction of up to 285 dwellings with all matters reserved for future consideration (Access, Appearance, Landscaping, Layout and Scale).

    10 Sep 2026 Conditions
  • 26/1366/DIS Awaiting decision

    Hill Barton Farm Hill Barton Road Exeter

    Discharge condition 10 (Tree Protection Plan) of planning permission 21/1701/OUT - Outline Planning Application for construction of up to 285 dwellings with all matters reserved for future consideration (Access, Appearance, Landscaping, Layout and Scale).

    10 Sep 2026 Conditions