Planning application
Kelmscott Taddyforde Estate Exeter EX4 4AT
Works: Extension Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Removal of existing UPVC porch on the front elevation and construction of new porch on the front elevation with associated works.
As published by the council, reference 26/0089/FUL
Application record
- Reference
- 26/0089/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 21 Jan 2026
- Validated
- 30 Jan 2026
- Decided
- 17 Mar 2026
- Ward
- Duryard And St James
- Decision by
- Delegated Decision
- Postcode
- EX4 4AT
Timeline
Dates from the published record
-
21 Jan 2026
Received by Exeter
-
30 Jan 2026
Validated
Checked as complete and ready for consideration.
-
17 Mar 2026
Decision issued: Permitted
-
26 Jul 2026
Added to PlanIndex
Documents
Plans, drawings, consultee responses and the officer's report
10 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat this grant of permission means
Exeter granted permission on 17 March 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.
About full applications
A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.
Nearby applications
Within 500 metres
-
Collinson Taddyforde Estate Exeter EX4 4AT
T1 - Bay: Reduce in height by 3 metres, and reshape the crown by 2 metres
Granted Trees 4 docs -
Melvyn Taddyforde Estate Exeter EX4 4AT
T1 - Sycamore - Remove the stem leaning over the road, SSW facing towards 'The Chalet'. The stem has a 36cm cut, and arises from the main stem at 10 feet high. - Reduce the height of the remaining tree by 4 metres, with topping cuts of approximately 15cm diameter. Shorten back all lateral branches by up to 2metres (approx. 9cm diameter cut size) - crown lift overhanging the roadside to 5.2metres above ground level.
Granted Trees 4 docs -
Elmlea Taddyforde Estate Exeter EX4 4AT
Increase roof height of existing garage.
Granted Full applications 13 docs -
William Tarrant House Cowley Bridge Road Exeter EX4 4GS
Alteration to the mansard roof on the north and west elevations to eliminate the parapet wall.
Refused Amendments Loft or dormer 12 docs -
Blockspace St Davids Hill Exeter Devon EX4 4BD
Construction of first floor storage facility above consented single storey storage facility.
Granted Full applications 18 docsSmall domestic -
Two Ways Taddyforde Estate Exeter EX4 4AT
Variation of Condition 2 on Planning Permission Ref. 22/0116/FUL, granted 20 April 2022, to increase height and alter fenestration/materials of replacement garage
Refused Amendments Windows or glazing 11 docs
Other full applications
In Exeter
-
26/1384/FUL Awaiting decision
15 Parkfield Road Topsham EX3 0DR
New second storey to existing single storey extension to dwelling
-
26/1031/FUL Granted
Auto Shine Car Wash 39 Buller Road Exeter EX4 1DA
Shed with canopy to be used for storage (retrospective application)
-
26/1073/FUL Granted
8 Monmouth Street Topsham EX3 0AJ
Alterations to single storey rear extension
-
26/1155/FUL Granted
1 Penleonard Close Exeter EX2 4NY
Widening of the existing vehicle access and dropped kerb from Penleonard Close; replacing the existing tarmac driveway with a permeable block pavior driveway and the formation of three new parking spaces, and associated alterations to the landscaping.
-
26/0471/FUL Granted
Garage West Of The Coach House Brewery Lane North Street Heavitree Exeter
Refurbishment, restoration and conversion of 2 storey, Grade II listed Building, into a 1 bedroom dwelling, including formation of rear external porch way