Skip to content
PlanIndex Get alerts
Menu

Planning application

18 Matford Avenue Exeter EX2 4PW

Granted Exeter 24/1499/FUL Full Planning Permission

Works: New dwelling Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Demolition of bungalow and creation of a 2-storey, 4-bedroom detached house with integral garage

As published by the council, reference 24/1499/FUL

Application record

Reference
24/1499/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
16 Dec 2024
Validated
16 Dec 2024
Decided
3 Jun 2025
Ward
Newtown And St Leonards
Decision by
Delegated Decision
Postcode
EX2 4PW

Timeline

Dates from the published record

  1. 16 Dec 2024

    Received by Exeter

  2. 3 Jun 2025

    Decision issued: Permitted

  3. 23 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Sidmouth

16 applications on PlanIndex · across 2 councils · 90% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

28 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 18 Matford Avenue Exeter EX2 4PW

    25/1437/DIS Submitted 14 Oct 2025 0m away

    Discharge of Conditions 3 (external materials), 6 (landscaping) and 8 (wildlife habitats) of planning permission 25/1278/VOC (Demolition of bungalow and creation of a 2-storey, 4-bedroom detached house with integral garage) approved 20/11/2025.

    Granted Conditions New dwelling Demolition 12 docs
  • 18 Matford Avenue Exeter EX2 4PW

    25/1278/VOC Submitted 17 Sep 2025 0m away

    Variation of Condition 2 (approved plans) of planning application 24/1499/FUL (Demolition of bungalow and creation of a 2-storey, 4-bedroom detached house with integral garage), approved 03 Jun 2025, to install photovoltaic panels to the east and west facing roofs, and install a 1 metre high brick wall within the front garden

    Granted Amendments New dwelling Demolition 9 docs
  • 11 Matford Avenue Exeter EX2 4PW

    24/1364/CAT Submitted 14 Nov 2024 13m away

    Felling and stump grind of single dead silver birch in pavement outside 11 Matford Avenue. To be replanted with same.

    Granted Trees 4 docs
  • 14 Matford Avenue Exeter EX2 4PW

    25/1484/CAT Submitted 22 Oct 2025 50m away

    Copper Beech - T1 - situated at bottom (SW) end of garden of 14 Matford Avenue. Proposed works: Canopy reduction of 1.5 - 2m. (leaving a remaining canopy width of 8-10m and canopy height of 14 - 15.5m) Justification for works- The works are proposed to allow more natural light into the property and neighbouring gardens and to prevent the tree from obstructing views. The pruning will be carried out in line with good arboricultural practice, maintaining the trees health, form, and amenity value while keeping it at a suitable size for its setting. The tree has previously been reduced by 25% and recovered very well.

    Granted Trees 7 docs
  • Stoneycombe Matford Road Exeter EX2 4PE

    25/0241/FUL Submitted 1 Mar 2025 65m away

    Fitting 12 Solar Panels to the eastern slope of the roof.

    Granted Full applications 12 docs
  • Stoneycombe Matford Road Exeter EX2 4PE

    26/1319/CAT Submitted 1 Sep 2026 70m away

    97% historically approved · decision due ~27 Oct

    Please see Plan attached. This plan was submitted with a similar application on 7 October 2020. T 1 was felled in 2020. T2 and T3 were pollarded. T2 and T3 require pollarding again because of their proximity to the house. See detail on plan.) T3 is already touching the house and over the roof.

    Awaiting decision Trees 5 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications