Skip to content
PlanIndex Get alerts
Menu

Planning application

67 Thornpark Rise Exeter EX1 3HH

Granted Exeter 24/1354/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey side and rear extension

As published by the council, reference 24/1354/FUL

Application record

Reference
24/1354/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
13 Nov 2024
Validated
20 Nov 2024
Decided
13 Mar 2025
Ward
St Loyes
Decision by
Delegated Decision
Postcode
EX1 3HH

Timeline

Dates from the published record

  1. 13 Nov 2024

    Received by Exeter

  2. 20 Nov 2024

    Validated

    Checked as complete and ready for consideration.

  3. 13 Mar 2025

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice

7 applications on PlanIndex · across 3 councils

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

19 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 134 Thornpark Rise Exeter EX1 3HJ

    25/0663/FUL Submitted 27 May 2025 104m away

    Two storey detached dwelling and associated works (Self-build)

    Refused Full applications New dwelling 15 docs
    Domestic
  • 31 Leypark Road Exeter EX1 3NX

    24/0824/FUL Submitted 25 Jul 2024 216m away

    Change of front garden and provide drop kerb for parking space for one vehicle.

    Granted Full applications 9 docs
  • Land Opposite 51 Ribston Avenue Exeter

    26/1219/VOC Submitted 12 Aug 2026 297m away

    86% historically approved · decision due ~7 Oct

    The construction of a 54-bed independent hospital (Use Class C2) with access, car parking, landscaping/open space and associated works. (Variation of condition 2 of planning permission 18/0873/FUL to supersede the approved plans with new plans showing minor amendments to the site plan, floor plans, roof plan and elevations, and variation of condition 7 to change the drawing number to 001029-SHACK-V1-00-DR-A-1001_Proposed Site Plan_B.)

    Awaiting decision Amendments 11 docs
  • 47 Birchy Barton Hill Exeter EX1 3EX

    24/0454/FUL Submitted 25 Apr 2024 318m away

    Alterations to the rear raised decking to allow access to the back door as per building regulations.

    Granted Full applications 10 docs
  • 5 Binford Close Exeter EX1 3JZ

    26/0522/DIS Submitted 8 Apr 2026 323m away

    Discharge of Condition 5 of Planning Permission Ref. 25/0752/FUL, granted on 18 August 2025, relating to materials

    Decided Conditions 2 docs
  • 41 Birchy Barton Hill Exeter EX1 3EX

    26/0038/VOC Submitted 9 Jan 2026 363m away

    Variation of Condition 2 of consent reference 25/0057/FUL for the approved elevation drawings to correspond with other drawings to show chimney removal.

    Granted Amendments 5 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications