Skip to content
PlanIndex Get alerts
Menu

Planning application

Unit 6A And Unit 7 Stone Lane Retail Park Marsh Barton Road Exeter EX2 8LH

Granted Exeter 24/0855/FUL Full Planning Permission

Works: Windows or glazing

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Continued use of Unit 6a and Unit 7 within Class E including the retail sale of food and drink for consumption off the premises, external alterations to Unit 7 including new shop front with provision for 2no. customer entrances, reconfiguration of car park, acoustic barrier and associated works.

As published by the council, reference 24/0855/FUL

Application record

Reference
24/0855/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
25 Jul 2024
Validated
25 Jul 2024
Decided
2 Dec 2024
Ward
Alphington
Decision by
Delegated Decision
Postcode
EX2 8LH

Timeline

Dates from the published record

  1. 25 Jul 2024

    Received by Exeter

  2. 2 Dec 2024

    Decision issued: Permitted

  3. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file

827 applications on PlanIndex · across 124 councils · 97% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

21 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • Unit 7 Stone Lane Retail Park Marsh Barton Road Exeter EX2 8LH

    25/1763/TPO Submitted 10 Dec 2025 50m away

    South East corner of building: T1: Holm Oak: Prune over hanging branches to achieve a minimum 1.5m clearance from building. Crown lift secondary branches only to achieve 2.5m above public footpath. Tree is encroaching onto building and blocking public footpath. All pruning cuts to be made at suitable growth points. All works to be carried out in accordance with BS 3998:2010 ? Tree Work Recommendations. Remove all cut material from site and return to a Teign Trees depot for recycling. The area will be left safe, clean, and tidy on completion.

    Granted Trees 5 docs
  • Unit 6A Stone Lane Retail Park Marsh Barton Road Exeter EX2 8LH

    24/0324/FUL Submitted 20 Mar 2024 51m away

    Refurbishment and sub-division of Unit 6a for continued use within Class E(a), new shop front with two customer entrances, reconfiguration of car park to the front of the unit and associated minor landscape works.

    Granted Full applications Windows or glazing 18 docs
  • Besley Court Retail Park Close Marsh Barton Trading Estate Exeter EX2 8GJ

    26/0236/TPO Submitted 18 Feb 2026 103m away

    T718 - Lime Suggested Works: Clear 1m of laurel from around the stem base, prune to achieve a 2m clearance from street lamp T719 - Lime Suggested Works: Remove lowest 2m of epicormic growth, remove the lowest branch in the northwestern aspect to clear the street lamp T720 - Lime Suggested Works: Remove the lowest 2m of epicormic growth T721 - Lime Suggested Works: Pollard at 6m above ground level T723 - Lime Suggested Works: Remove hanging branch suspended over the footpath in the northeastern crown aspect Rationale: Following arboricultural assessment, these works have been proposed as part of the reasonable and responsible maintenance of these trees. See the arboricultural report for full details

    Granted Trees 5 docs
  • Unit 8 Stone Lane Retail Park Marsh Barton Road Exeter EX2 8LH

    24/0777/CONR Submitted 6 Jul 2024 110m away

    Removal of Condition 2 on Planning Permission Ref. 13/3894/VOC, granted on 2 October 2013, to allow 24 hours opening

    Granted Amendments 11 docs
  • Stone Lane Retail Park Marsh Barton Road Exeter EX2 8LH

    24/0950/TPO Submitted 19 Aug 2024 112m away

    CAS489-Exeter Retail Park Tree Condition Report Feb 2024

    Granted Trees 7 docs
  • Unit 4 And 5 Filmer Way Exeter Devon EX2 8YX

    23/0398/NMA Submitted 21 Mar 2023 190m away

    Addition of bird netting, to be installed to give coverage of entire roof (non-material amendment of 21/1434/FUL)

    Granted Amendments 6 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications