Planning application
12 White Street Topsham EX3 0AA
Works: Extension Loft or dormer Roofing Windows or glazing Small domestic
Read from the description, not a valuation. How we read the register
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Replace existing conservatory with single storey rear extension, existing roof tiles with natural slate, existing windows with timber framed windows, dormer roof finish with single ply membrane and vertical natural slate.
As published by the council, reference 24/0493/FUL
Application record
- Reference
- 24/0493/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 2 May 2024
- Validated
- 2 May 2024
- Decided
- 15 Jul 2024
- Ward
- Topsham
- Decision by
- Delegated Decision
- Postcode
- EX3 0AA
Timeline
Dates from the published record
-
2 May 2024
Received by Exeter
-
15 Jul 2024
Decision issued: Permitted
-
5 Sep 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, an architecture practice registered in Topsham
32 applications on PlanIndex · across 7 councils · 89% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
19 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
-
9 White Street Topsham EX3 0AA
82% historically approved · decision due ~13 Oct
One and two storey rear extension, alterations to outbuilding to form habitable accommodation, replacement windows and doors.
Awaiting decision Full applications Extension Windows or glazing 12 docs -
7 White Street Topsham EX3 0AA
Proposed single storey rear extension incorporating outbuilding, and replacement windows & doors
Granted Full applications Extension Windows or glazing 13 docsSmall domestic -
7 White Street Topsham EX3 0AA
Single storey rear extension incorporating outbuilding, and replacement windows & doors
Granted Heritage and listed buildings Extension Windows or glazing 13 docsSmall domestic -
7 White Street Topsham EX3 0AA
Proposed single storey rear/side extension incorporating outbuilding
Refused Heritage and listed buildings Extension 10 docsSmall domestic -
7 White Street Topsham EX3 0AA
Proposed single storey rear/side extension incorporating outbuilding
Refused Full applications Extension 10 docsSmall domestic
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension