Skip to content
PlanIndex Get alerts
Menu

Planning application

37 Warwick Road Exeter EX1 3HB

Granted Exeter 24/0305/FUL Full Planning Permission

Works: Extension Small domestic

Read from the description, not a valuation. How we read the register

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Proposed single storey rear extension

As published by the council, reference 24/0305/FUL

Application record

Reference
24/0305/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
15 Mar 2024
Validated
20 Mar 2024
Decided
6 May 2024
Ward
St Loyes
Decision by
Delegated Decision
Postcode
EX1 3HB

Timeline

Dates from the published record

  1. 15 Mar 2024

    Received by Exeter

  2. 20 Mar 2024

    Validated

    Checked as complete and ready for consideration.

  3. 6 May 2024

    Decision issued: Permitted

  4. 5 Sep 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, an architecture practice registered in Bicester

55 applications on PlanIndex · across 6 councils · 95% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 28 Warwick Road Exeter Devon EX1 3HB

    21/1006/LPD Submitted 22 Jun 2021 28m away

    Certificate of lawfulness sought for the siting of a mobile home/caravan within residential curtilage for purposes ancillary to the use and occupation of the main dwelling.

    Decided Lawful development 21 docs
    Domestic
  • 19 Warwick Road Exeter EX1 3EY

    26/0767/FUL Submitted 30 May 2026 81m away

    Single storey rear extension.

    Granted Full applications Extension 14 docs
    Small domestic
  • 5 Warwick Avenue Exeter EX1 3HA

    24/1315/VOC Submitted 1 Nov 2024 132m away

    With regards to approved: 23/1003/FUL Date of Decision: 02/10/2023 Variation of Condition Number 2. Alter condition in order that the building complies with the updated drawings/ proposals, including minor amendment to the room layout (a window swapped for a door) and a minor increase in height. The revised drawings show the amendments to roof height and to the window/ door layout.

    Granted Amendments Windows or glazing 8 docs
  • 88 Honiton Road Exeter EX1 3EE

    25/1470/FUL Submitted 21 Oct 2025 134m away

    Retrospective application for the temporary siting of a container kitchen and use of site as a hot food takeaway in addition to the existing car wash.

    Granted Full applications 12 docs
  • Site Office And Land West Of Ringswell Avenue Formr St Lukes School Site Ringswell Avenue Exeter

    24/0450/DIS Submitted 24 Apr 2024 139m away

    Part-discharge condition 10 (CO2 saving Report) of planning permission ref. 19/1406/FUL - Construction of 60 dwellings (use class C3), means of access, public open space and associated infrastructure.

    Decided Conditions 126 docs
    Major scheme
  • Land Opposite 51 Ribston Avenue Exeter

    26/1219/VOC Submitted 12 Aug 2026 150m away

    86% historically approved · decision due ~7 Oct

    The construction of a 54-bed independent hospital (Use Class C2) with access, car parking, landscaping/open space and associated works. (Variation of condition 2 of planning permission 18/0873/FUL to supersede the approved plans with new plans showing minor amendments to the site plan, floor plans, roof plan and elevations, and variation of condition 7 to change the drawing number to 001029-SHACK-V1-00-DR-A-1001_Proposed Site Plan_B.)

    Awaiting decision Amendments 11 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications