Planning application
22 Garden Close Exeter Devon EX2 5PA
Works: Extension
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Extension of existing rear extension and alterations.
As published by the council, reference 21/0971/FUL
Application record
- Reference
- 21/0971/FUL
- Type
- Full Planning Permission
- Status
- Permitted
- Decision
- Permitted
- Received
- 17 Jun 2021
- Validated
- 13 Jul 2021
- Decided
- 13 Aug 2021
- Ward
- St Loyes
- Decision by
- Delegated Decision
- Postcode
- EX2 5PA
Timeline
Dates from the published record
-
17 Jun 2021
Received by Exeter
-
13 Jul 2021
Validated
Checked as complete and ready for consideration.
-
13 Aug 2021
Decision issued: Permitted
-
12 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file, registered in Exeter
22 applications on PlanIndex · across 5 councils · 82% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
8 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About full applications applications
How this application type works
A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.
Nearby applications
Within 500 metres
-
22 Garden Close Exeter EX2 5PA
Single storey flat roof rear extension
Granted Full applications Extension 13 docsSmall domestic -
1 Dick Pym Close Exeter EX2 5NF
Discharge of Condition 3 (Surface water disposal strategy) of 25/1686/FUL determined on 20/01/2026
Decided Conditions 8 docs -
6 Dick Pym Close Exeter Devon EX2 5NF
Non-material amendment to change facing brick to Bristol Buff Multi.
Granted Amendments 5 docs -
1 Dick Pym Close Exeter EX2 5NF
Two-storey side extension to dwelling.
Granted Full applications Extension 13 docsDomestic -
8 Cliff Bastin Close Exeter Devon EX2 5QW
Construction of extensions and car port.
Granted Full applications Extension 11 docs -
3 Gilbert Avenue Exeter Devon EX2 5NY
6m tall flagpole in the back garden.
Granted Full applications 9 docs
Other full applications applications
In Exeter
-
26/0874/FUL Granted
Haven Banks One Car Park Michael Browning Way Exeter
Installation of 2 Parcel Lockers
-
26/0998/FUL Granted
The Maltings Church Street Exeter EX2 5EJ
Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).
-
26/0945/FUL Granted
6 Denise Close Exeter EX2 8UU
Construction of "lean to" rear extension (Retrospective)
-
26/1322/FUL Awaiting decision
13 Kingsway Exeter EX2 5EN
Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)
-
26/1318/FUL Awaiting decision
22 Alice Templer Close Exeter EX2 6AE
Ground floor rear extension