Skip to content
PlanIndex Get alerts
Menu

Planning application

7 Danes Road Exeter Devon EX4 4LS

Granted Exeter 21/0946/FUL Full Planning Permission

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Change of use from C4 to Sui Generis; 6 bed HMO to a 7 bed.

As published by the council, reference 21/0946/FUL

Application record

Reference
21/0946/FUL
Type
Full Planning Permission
Status
Permitted
Decision
Permitted
Received
11 Jun 2021
Validated
2 Jul 2021
Decided
13 Aug 2021
Ward
Duryard And St James
Decision by
Delegated Decision
Postcode
EX4 4LS

Timeline

Dates from the published record

  1. 11 Jun 2021

    Received by Exeter

  2. 2 Jul 2021

    Validated

    Checked as complete and ready for consideration.

  3. 13 Aug 2021

    Decision issued: Permitted

  4. 12 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in Devon

1 application on PlanIndex

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

6 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 29 Danes Road Exeter Devon EX4 4LS

    23/0189/PD Submitted 10 Feb 2023 57m away

    Single-storey Rear extension. 5.12m L x 3m W x 3m h.

    Granted Prior approval Extension 10 docs
    Small domestic
  • HMP Exeter New North Road Exeter EX4 4EX

    26/0936/FUL Submitted 22 Jun 2026 87m away

    82% historically approved · decision due ~3 Sep

    Proposed works to the perimeter wall, control room relocation and CCTV improvements at HMP Exeter, in relation to Gateway to Devon County Prison (grade II, NHLE 1267622); and Entrance Wing to Devon County Prison and Pedimented Wing to the Rear (grade II, NHLE 1267637). Installation of bike shelter and EV charging points.

    Awaiting decision Full applications 7 docs
  • 82 Howell Road Exeter EX4 4LZ

    25/1316/LED Submitted 24 Sep 2025 87m away

    House in multiple occupation for seven persons (sui generis use) (Certificate of lawfulness of existing use)

    Decided Lawful development 4 docs
  • 2 Hoopern Street Exeter EX4 4LY

    25/0460/FUL Submitted 16 Apr 2025 88m away

    Installation of external roller shutter.

    Refused Full applications 13 docs
  • HMP Exeter New North Road Exeter EX4 4EX

    26/0937/LBC Submitted 22 Jun 2026 91m away

    86% historically approved · decision due ~3 Sep

    Proposed works to the perimeter wall, control room relocation and CCTV improvements at HMP Exeter, in relation to Gateway to Devon County Prison (grade II, NHLE 1267622); and Entrance Wing to Devon County Prison and Pedimented Wing to the Rear (grade II, NHLE 1267637).

    Awaiting decision Heritage and listed buildings 6 docs
  • 77 Howell Road Exeter EX4 4LZ

    25/1292/LED Submitted 19 Sep 2025 101m away

    House in multiple occupation for seven persons (sui generis use)

    Decided Lawful development 4 docs

In Exeter

  • 26/0874/FUL Granted

    Haven Banks One Car Park Michael Browning Way Exeter

    Installation of 2 Parcel Lockers

    12 Jun 2026 Full applications
  • 26/0998/FUL Granted

    The Maltings Church Street Exeter EX2 5EJ

    Replacement of existing brown uPVC windows with new energy efficient brown uPVC framed units (like for like replacements). Replacement of existing brown painted timber doors with energy efficient brown uPVC framed units (like for like design).

    2 Jul 2026 Full applications
  • 26/0945/FUL Granted

    6 Denise Close Exeter EX2 8UU

    Construction of "lean to" rear extension (Retrospective)

    23 Jun 2026 Full applications
  • 26/1322/FUL Awaiting decision

    13 Kingsway Exeter EX2 5EN

    Single storey side extension and loft conversion (including rear dormer and half-hip to gable enlargement)

    1 Sep 2026 Full applications
  • 26/1318/FUL Awaiting decision

    22 Alice Templer Close Exeter EX2 6AE

    Ground floor rear extension

    1 Sep 2026 Full applications