Skip to content
PlanIndex Get alerts
Menu

Planning application

April Cottage The Looe Reigate Road Ewell Surrey KT17 3BZ

Awaiting decision Epsom and Ewell 25/01504/FUL Full Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of dwellinghouse and change of use of land from industrial to residential (C3) for the construction of 2no detached four-bedroom dwellings with associated parking and landscaping.

As published by the council, reference 25/01504/FUL

Application record

Reference
25/01504/FUL
Type
Full Planning Permission
Status
Awaiting decision
Received
23 Dec 2025
Validated
23 Dec 2025
Ward
Nonsuch
Postcode
KT17 3BZ

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by Epsom and Ewell

  2. 30 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epsom and Ewell took a median of 53 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Planning Clarity Agent, a planning consultancy registered in London

Active · incorporated 2014 · London

5 applications on PlanIndex · across 3 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

65 documents on file for this application

  • Proposed Demolitions Plans · 20 Jul 2026
  • Proposed First Floor Plan Plans · 20 Jul 2026
  • Proposed Ground Floor Plan - Unit 1 Plans · 20 Jul 2026
  • Proposed Ground Floor Plan - Unit 2 Plans · 20 Jul 2026
  • Proposed Ground Floor Plan Plans · 20 Jul 2026
  • Proposed Swept Path Analysi (Sheet 2) Plans · 20 Jul 2026
  • Proposed First Floor Plan - Unit 2 Plans · 20 Jul 2026
  • Proposed Swept Paths Analysis Plans · 20 Jul 2026
  • Epsom Estates Holding Objection Letter Correspondence · 12 Jun 2026
  • Arboriculture Report Supporting Information · 06 Mar 2026
  • HAST_E Site Notice · 04 Feb 2026
  • SuDS Officer comments Consultation response · 21 Jan 2026
  • Minerals and Waste Policy comments Consultation response · 21 Jan 2026
  • Highways Officer comments Consultation response · 19 Jan 2026
  • Contaminated Land Officer comments Consultation response · 14 Jan 2026
  • Ecology Officer comments Consultation response · 06 Jan 2026
  • ACKN Correspondence · 05 Jan 2026
  • Neighbour Consultation Letter Correspondence · 05 Jan 2026
  • HAST_E Site Notice · 05 Jan 2026
  • NEIGHLIST Neighbour Notification List · 05 Jan 2026
  • Application Form - without Personal data Application Form · 23 Dec 2025
  • Existing Side Elevations Plans · 23 Dec 2025
  • Existing Side Long Elevation Plans · 23 Dec 2025
  • Existing Roof Plan Plans · 23 Dec 2025
  • Existing Site Layout Plans · 23 Dec 2025
  • Proposed Demolition Plan Plans · 23 Dec 2025
  • Existing Ground Floor Plan Plans · 23 Dec 2025
  • Proposed Roof Plan Units 1 and 2 Plans · 23 Dec 2025
  • Existing Front and Rear Elevations Plans · 23 Dec 2025
  • Existing Block Plan Plans · 23 Dec 2025
  • Proposed Block Plan Plans · 23 Dec 2025
  • Proposed First Floor Plan Unit 1 Plans - Superseded · 23 Dec 2025
  • Proposed First Floor Plan Unit 2 Plans - Superseded · 23 Dec 2025
  • Proposed Layout Plan Units 1 and 2 Plans - Superseded · 23 Dec 2025
  • Proposed Front Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Proposed Front and Rear Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 1 Plans · 23 Dec 2025
  • Proposed Side Elevations Unit 1 and 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 1 Plans · 23 Dec 2025
  • Proposed Ground Floor Plan Unit 1 Plans - Superseded · 23 Dec 2025
  • Proposed Ground Floor Plan Unit 2 Plans - Superseded · 23 Dec 2025
  • Location Plan Plans · 23 Dec 2025
  • Proposed Rear Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Biodiversity Net Gain Report Supporting Information · 23 Dec 2025
  • Construction and Traffic Management Plan Supporting Information · 23 Dec 2025
  • Cover Letter Supporting Information · 23 Dec 2025
  • Design and Access Statement Supporting Information · 23 Dec 2025
  • Energy and Sustainability Statement Supporting Information · 23 Dec 2025
  • Proposed Side Elevation Unit 2 Plans · 23 Dec 2025
  • Noise Assessment Supporting Information · 23 Dec 2025
  • Site Access Visibility Plans · 23 Dec 2025
  • Vehicular Swept Paths Analysis Plans - Superseded · 23 Dec 2025
  • Planning Statement Supporting Information · 23 Dec 2025
  • Plant Noise Assessment Supporting Information · 23 Dec 2025
  • Preliminary Ecological Appraisal Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 1 Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 2 Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 3 Supporting Information · 23 Dec 2025
  • Surface Water Drainage Plan Plans · 23 Dec 2025
  • Surface Water Drainage Strategy Supporting Information · 23 Dec 2025
  • Traffic and Transport Statement Supporting Information · 23 Dec 2025
  • CIL Additional Information Form Supporting Information · 23 Dec 2025
  • BNG Matrix Supporting Information · 23 Dec 2025

Watch members (£5 a month) open the document list from here.

Open the documents

What happens while it is decided

This application is with Epsom and Ewell for determination, against a statutory target of eight weeks. Over the last year Epsom and Ewell decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 0.3 miles

  • The Looe Reigate Road Ewell Surrey KT17 3BZ

    25/00995/FUL Submitted 25 Aug 2025 50 yards away

    73% historically approved · decision due ~20 Oct

    Demolition of existing buildings and redevelopment of the site to provide a part single, part 2 storey building providing 9no. industrial and business units comprising 1no. Class E (Commercial, Business and Services), 4no. Class B2 (General Industrial), and 4no. Class B8 (Storage or Distribution) uses with a total floorspace of 1,000.2sq.m, together with ancillary offices, associated car parking and landscaping

    Awaiting decision Full applications Demolition 64 docs
  • The Looe Reigate Road Ewell Surrey KT17 3BZ

    26/01189/FUL Submitted 12 Oct 2026 50 yards away

    73% historically approved · decision due ~7 Dec

    Retention of a storage area and 2no. containers with Class B2 (Storage and Distribution)

    Awaiting decision Full applications 10 docs
  • 124 A Reigate Road Ewell Surrey KT17 3BX

    26/01161/TPO Submitted 23 Oct 2026 100 yards away

    97% historically approved · decision due ~18 Dec

    T1- Sycamore REF: 64/T34 - Fell to ground level T2- Silver Birch REF: 64/T36 - Reduce crown by 1.5metres T3- Larch REF: 64/T38 - Remove all major dead branches to tidy - exempt works

    Awaiting decision Trees 5 docs
  • Downs Farm 140 Reigate Road Ewell Surrey KT17 3BX

    26/00741/SCR Submitted 19 Jun 2026 100 yards away

    87% historically approved · decision due ~14 Aug

    Screening Opinion pursuant to Regulation 6 (1) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as amended (the EIA Regulations), in relation to the proposed residential development at Downs Farm, 140 Reigate Road KT17 3BX.

    Decided New dwelling
  • 130A Reigate Road Ewell Surrey KT17 3BX

    24/01139/TPO Submitted 30 Aug 2024 200 yards away

    TPO64/T56 - T1 - Horse Chestnut crown reduced to 30 x 16 m. Approx. 2m crown reduction not exceeding previous reduction points and T2 Lime crown reduced to 23 x 4 m. Approx. 2m crown reduction leaving a balanced shape. All work to be caried out to BS 3998-2010 Cuts not to exceed 50 mm

    Granted Trees 7 docs
  • 112 Reigate Road Ewell Surrey KT17 3BX

    24/00934/TPO Submitted 18 Jul 2024 250 yards away

    T1 - Beech Tree (64/T3) - Reduce and re-shape all over/entire crown size by approximately 2-3 metres. Ensure lifting of lower branches over road

    Granted Trees 5 docs

In Epsom and Ewell

  • 26/01151/FUL Awaiting decision

    Nail Box 20 Stoneleigh Broadway Stoneleigh Surrey KT17 2HU

    Erection of a single-storey rear extension to create studio flat

    Full applications
  • 26/01152/FUL Awaiting decision

    Nail Box 20 Stoneleigh Broadway Stoneleigh Surrey KT17 2HU

    Erection of a single-storey rear extension to create a studio flat, with a raised walkway and steps to the rear for the first-floor flat.

    Full applications
  • 26/01224/FUL Awaiting decision

    30 Aston Way Epsom Surrey KT18 5LZ

    Part garage conversion to accommodate a habitable space, single storey front porch extension. Single storey rear extension and alterations to fenestration (retrospective)

    Full applications
  • 26/01030/FUL Awaiting decision

    167A Chessington Road West Ewell Surrey KT19 9XE

    First floor rear extension and roof extension to accommodate a habitable space incorporating a rear dormer and front roof light .

    Full applications
  • 26/01028/FUL Awaiting decision

    6 Middleton Road Epsom Surrey KT19 9HE

    Change of Use of a residential dwelling (Class C3 use) to a House in Multiple Occupation (HMO)

    Full applications