Skip to content
PlanIndex Get alerts
Menu

Planning application

April Cottage The Looe Reigate Road Ewell Surrey KT17 3BZ

Awaiting decision Epsom and Ewell 25/01504/FUL Full Planning Permission

Works: Demolition Domestic

Read from the description, not a valuation. How we read the register

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Demolition of dwellinghouse and change of use of land from industrial to residential (C3) for the construction of 2no detached four-bedroom dwellings with associated parking and landscaping.

As published by the council, reference 25/01504/FUL

Application record

Reference
25/01504/FUL
Type
Full Planning Permission
Status
Awaiting decision
Received
23 Dec 2025
Validated
23 Dec 2025
Ward
Nonsuch
Postcode
KT17 3BZ

Timeline

Dates from the published record

  1. 23 Dec 2025

    Received by Epsom and Ewell

  2. 30 Jul 2026

    Added to PlanIndex

  3. Decision

    Awaiting decision

    Decision expected by 17 February 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Epsom and Ewell took a median of 52 days over the applications it decided in the last year.

Who's behind it

Company information only, from the register and Companies House

Planning Clarity Agent, a planning consultancy registered in London

Active · incorporated 2014 · London

3 applications on PlanIndex · across 2 councils

Trade members see everything this firm has filed, how it was decided, and get an email the day it files again.

See their track record

Documents

Plans, drawings, consultee responses and the officer's report

64 documents on file for this application

  • Proposed Demolitions Plans · 20 Jul 2026
  • Proposed First Floor Plan Plans · 20 Jul 2026
  • Proposed Ground Floor Plan - Unit 1 Plans · 20 Jul 2026
  • Proposed Ground Floor Plan - Unit 2 Plans · 20 Jul 2026
  • Proposed Ground Floor Plan Plans · 20 Jul 2026
  • Proposed Swept Path Analysi (Sheet 2) Plans · 20 Jul 2026
  • Proposed First Floor Plan - Unit 2 Plans · 20 Jul 2026
  • Proposed Swept Paths Analysis Plans · 20 Jul 2026
  • Epsom Estates Holding Objection Letter Correspondence · 12 Jun 2026
  • Arboriculture Report Supporting Information · 06 Mar 2026
  • HAST_E Site Notice · 04 Feb 2026
  • SuDS Officer comments Consultation response · 21 Jan 2026
  • Minerals and Waste Policy comments Consultation response · 21 Jan 2026
  • Highways Officer comments Consultation response · 19 Jan 2026
  • Contaminated Land Officer comments Consultation response · 14 Jan 2026
  • Ecology Officer comments Consultation response · 06 Jan 2026
  • ACKN Correspondence · 05 Jan 2026
  • Neighbour Consultation Letter Correspondence · 05 Jan 2026
  • HAST_E Site Notice · 05 Jan 2026
  • NEIGHLIST Neighbour Notification List · 05 Jan 2026
  • Application Form - without Personal data Application Form · 23 Dec 2025
  • Existing Side Elevations Plans · 23 Dec 2025
  • Existing Side Long Elevation Plans · 23 Dec 2025
  • Existing Roof Plan Plans · 23 Dec 2025
  • Existing Site Layout Plans · 23 Dec 2025
  • Proposed Demolition Plan Plans · 23 Dec 2025
  • Existing Ground Floor Plan Plans · 23 Dec 2025
  • Proposed Roof Plan Units 1 and 2 Plans · 23 Dec 2025
  • Existing Front and Rear Elevations Plans · 23 Dec 2025
  • Existing Block Plan Plans · 23 Dec 2025
  • Proposed Block Plan Plans · 23 Dec 2025
  • Proposed First Floor Plan Unit 1 Plans - Superseded · 23 Dec 2025
  • Proposed First Floor Plan Unit 2 Plans - Superseded · 23 Dec 2025
  • Proposed Layout Plan Units 1 and 2 Plans - Superseded · 23 Dec 2025
  • Proposed Front Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Proposed Front and Rear Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 1 Plans · 23 Dec 2025
  • Proposed Side Elevations Unit 1 and 2 Plans · 23 Dec 2025
  • Proposed Side Elevation Unit 1 Plans · 23 Dec 2025
  • Proposed Ground Floor Plan Unit 1 Plans - Superseded · 23 Dec 2025
  • Proposed Ground Floor Plan Unit 2 Plans - Superseded · 23 Dec 2025
  • Location Plan Plans · 23 Dec 2025
  • Proposed Rear Elevations Units 1 and 2 Plans · 23 Dec 2025
  • Biodiversity Net Gain Report Supporting Information · 23 Dec 2025
  • Construction and Traffic Management Plan Supporting Information · 23 Dec 2025
  • Cover Letter Supporting Information · 23 Dec 2025
  • Design and Access Statement Supporting Information · 23 Dec 2025
  • Energy and Sustainability Statement Supporting Information · 23 Dec 2025
  • Proposed Side Elevation Unit 2 Plans · 23 Dec 2025
  • Noise Assessment Supporting Information · 23 Dec 2025
  • Site Access Visibility Plans · 23 Dec 2025
  • Vehicular Swept Paths Analysis Plans - Superseded · 23 Dec 2025
  • Planning Statement Supporting Information · 23 Dec 2025
  • Plant Noise Assessment Supporting Information · 23 Dec 2025
  • Preliminary Ecological Appraisal Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 1 Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 2 Supporting Information · 23 Dec 2025
  • Phase 1 Desk Study Report Part 3 Supporting Information · 23 Dec 2025
  • Surface Water Drainage Plan Plans · 23 Dec 2025
  • Surface Water Drainage Strategy Supporting Information · 23 Dec 2025
  • Traffic and Transport Statement Supporting Information · 23 Dec 2025
  • CIL Additional Information Form Supporting Information · 23 Dec 2025
  • BNG Matrix Supporting Information · 23 Dec 2025

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Epsom and Ewell for determination, against a statutory target of eight weeks. Over the last year Epsom and Ewell decided full applications in a median of 56 days. More in our guide to how long planning decisions take.

About full applications

A full application seeks permission for a complete, detailed proposal in one go, with siting, design, access and landscaping all fixed at this stage. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • The Looe Reigate Road Ewell Surrey KT17 3BZ

    25/00995/FUL Submitted 25 Aug 2025 35m away

    68% historically approved · decision due ~20 Oct

    Demolition of existing buildings and redevelopment of the site to provide a part single, part 2 storey building providing 9no. industrial and business units comprising 1no. Class E (Commercial, Business and Services), 4no. Class B2 (General Industrial), and 4no. Class B8 (Storage or Distribution) uses with a total floorspace of 1,000.2sq.m, together with ancillary offices, associated car parking and landscaping

    Awaiting decision Full applications Demolition 64 docs
  • Downs Farm 140 Reigate Road Ewell Surrey KT17 3BX

    26/00741/SCR Submitted 19 Jun 2026 97m away

    87% historically approved · decision due ~14 Aug

    Screening Opinion pursuant to Regulation 6 (1) of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017, as amended (the EIA Regulations), in relation to the proposed residential development at Downs Farm, 140 Reigate Road KT17 3BX.

    Decided New dwelling
  • 130A Reigate Road Ewell Surrey KT17 3BX

    24/01139/TPO Submitted 30 Aug 2024 200m away

    TPO64/T56 - T1 - Horse Chestnut crown reduced to 30 x 16 m. Approx. 2m crown reduction not exceeding previous reduction points and T2 Lime crown reduced to 23 x 4 m. Approx. 2m crown reduction leaving a balanced shape. All work to be caried out to BS 3998-2010 Cuts not to exceed 50 mm

    Granted Trees 7 docs
  • 136A Reigate Road Ewell Surrey KT17 3BX

    19/01454/TPO Submitted 1 Nov 2019 262m away

    01 Horse Chestnut - reduce overall size of crown by 2m as side laterals have previously been reduced, height needs reducing to create balanced crown 02 Silver Birch - crown lift to 2.5m over neighbours side (The Downs Farm) to clear access underneath the tree

    Granted Trees 3 docs
  • High Pines 3A Longdown Lane North Ewell Surrey KT17 3HY

    25/00971/CAT Submitted 18 Aug 2025 318m away

    Cedar Tree - (358/T1) - Front of the property. Reduce lateral branches North side of the Crown by 2.5 meters and East side of the Crown by 2 meters. Remove deadwood and prune to clear the telephone wires for 1.5 meters.

    Granted Trees 6 docs
  • 7 Longdown Lane North Ewell Surrey KT17 3HY

    26/00434/TPO Submitted 14 Apr 2026 351m away

    Felling of overmature Silver Birch tree (G1 of TPO 32 ) located in the front garden adjacent to the drive.

    Granted Trees 17 docs

In Epsom and Ewell

  • 26/00879/FUL Awaiting decision

    The Lodge Bourne Hall Spring Street Ewell Surrey KT17 1UD

    Restoration, repair, and upgrading of the lodge and entrance features. The proposal involves no material structural alterations, extensions, or adaptations. Detailed Scope of Works: Entrance & Gates: Specialist masonry repair to the griffin gate finial, render remediation, and refurbishment/redecoration of the cast iron gates and lighting. Lodge External: Chimney and masonry repairs, replacement period-appropriate windows, doors, fascia, and portico bargeboards, with new rainwater goods and ground gullies to prevent flooding and damp. Lodge Internal: Replacement of failed ceilings and plaster with insulated finishes, ground floor insulation, new floor coverings, a replacement staircase/handrail, and targeted joinery replacement. Services & Fit-out: Installation of a period-style kitchen and bathroom, full redecoration, and procurement of period hearths for decommissioned wood-burning stoves.

    Full applications
  • 26/00831/FUL Granted

    173 Kingston Road Epsom Surrey KT19 0AA

    Change of use from a 6 person House in Multiple Occupation (Use Class C4) to an 8 person House in Multiple Occupation (Sui Generis) facilitated by loft conversion with rear dormer, part single part two storey side and rear extension, with external alterations including bin and cycle storage.

    14 Jul 2026 Full applications
  • 26/00821/FUL Granted

    11 Lavender Road West Ewell Surrey KT19 9EB

    Construction of a two-storey, three-bedroom dwelling with associated access and parking, involving the sub-division of the existing plot and alterations to the existing dwelling.

    13 Jul 2026 Full applications
  • 26/00999/FUL Awaiting decision

    388 Chessington Road West Ewell Surrey KT19 9EG

    Demolition of existing dwelling and construction of 3No. residential dwellings, with car parking, landscaping, refuse and cycle store

    Full applications
  • 26/00901/FUL Awaiting decision

    1 Windmill Avenue Epsom Surrey KT17 1LL

    Demolition of existing single storey dwelling and construction of a two storey, 4 bedroom dwelling (retrospective)

    Full applications