Skip to content
PlanIndex Get alerts
Menu

Planning application

Telecommunications Mast - CTIL The Chalk Pit College Road Epsom Surrey

Granted Epsom and Ewell 25/01469/NOTTE Telecom Development - Notification

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

Notification under the Electronic Communications Code Regulations of the intention to install of 5G Electronic Communications Apparatus at Epsom College Road, College Road Quarry, College Road, Epsom, Surrey, KT17 4JA.

As published by the council, reference 25/01469/NOTTE

Application record

Reference
25/01469/NOTTE
Type
Telecom Development - Notification
Status
Decided
Decision
No Objections
Received
11 Dec 2025
Validated
11 Dec 2025
Decided
12 Jan 2026
Ward
Nonsuch
Decision by
Delegated Decision

Site history

Applications at this address on the Epsom and Ewell register

This site has had 2 applications since 2025: 1 approved, 0 refused.

  • 26/00870/NOTTE Awaiting decision

    Telecommunications Mast - CTIL The Chalk Pit College Road Epsom Surrey

    Notification under the Electronic Communications Code Regulations of the intention to remove three existing antennas, install six new antennas, development of ancillary equipment thereto and complete internal upgrades within the equipment cabin at The Chalk Pit, at land off College Road, Epsom KT17 3LZ

    Submitted 23 Jul 2026

Timeline

Dates from the published record

  1. 11 Dec 2025

    Received by Epsom and Ewell

  2. 12 Jan 2026

    Decision issued: No Objections

  3. 11 Aug 2026

    Added to PlanIndex

Who's behind it

Company information only, from the register and Companies House

Agent on file, a surveying firm registered in Solihull

265 applications on PlanIndex · across 96 councils · 44% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

4 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Epsom and Ewell granted permission on 12 January 2026, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About telecoms applications

Telecoms applications cover masts, antennas and cabinets, usually as prior approval cases where the council considers siting and appearance only. More in our guide to planning application types.

In Epsom and Ewell

  • 26/00594/NOTTE Granted

    Outside 5 Trigo Court Epsom Surrey

    Install approximately 36 metre(s) of underground duct and cables

    18 May 2026 Telecoms
  • 26/00430/NOTTE Granted

    Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE

    Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the replacement of 3no antennas, with 3no new antennas on existing support structure, including the internal upgrade of existing equipment cabinet at ground level, and all ancillary works thereto.

    2 Apr 2026 Telecoms
  • 26/00414/NOTTE Granted

    Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE

    Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the proposed replacement of an existing base station, comprising the existing timber fencing to be replaced with 2m steel palisade fencing and ancillary development thereto. By replacing an existing base station in the same location at the same height and broadly similar scale the visual impact of the development on the surrounding area has been minimised so far as practicable.

    26 Mar 2026 Telecoms
  • 26/00222/T56 Refused

    Telecommunications Mast - EE Cheam Road Cheam Surrey

    Notification Application in terms of Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015: Removal of 1no. existing 6-metre-high lamppost pole with 3no. antennas, 1no. existing equipment cabinet to be replaced with 1no. new 20-metre-high phase 9 pole monopole with wraparound cabinet to accommodate 6no. new antennas, 1no. new GPS node, 2no. new equipment cabinets and associated ancillary works thereto.

    23 Feb 2026 Telecoms
  • 26/00324/NOTTE Granted

    Kiosk And ATM Outside 421 Kingston Road Epsom Surrey

    Removal of 1 public payphone outside 421 Kingston Road due to declining usage

    13 Mar 2026 Telecoms