Planning application
Telecommunications Mast The Derby Square High Street Epsom Surrey KT19 8AG
Permission granted. Work must normally begin within three years of the decision or the permission lapses.
Proposal
Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights to install 1 block terminal(s) with all associated wiring and cables.
As published by the council, reference 25/01170/NOTTE
Application record
- Reference
- 25/01170/NOTTE
- Type
- Telecom Development - Notification
- Status
- Decided
- Decision
- No Objections
- Received
- 1 Oct 2025
- Validated
- 1 Oct 2025
- Decided
- 20 Oct 2025
- Ward
- Town
- Decision by
- Delegated Decision
- Postcode
- KT19 8AG
Timeline
Dates from the published record
-
1 Oct 2025
Received by Epsom and Ewell
-
20 Oct 2025
Decision issued: No Objections
-
11 Aug 2026
Added to PlanIndex
Who's behind it
Company information only, from the register and Companies House
Agent on file
569 applications on PlanIndex · across 50 councils · 94% granted
Trade members see who it is, their full track record, and every application they have filed.
See who's behind itDocuments
Plans, drawings, consultee responses and the officer's report
4 documents on file for this application
A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.
Trade members open them from here.
Open the documentsWhat a grant of permission means
The process from here
Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.
Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.
About telecoms applications
How this application type works
Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.
Nearby applications
Within 500 metres
-
42 High Street Epsom Surrey KT19 8AH
Details persuant of the discharge of Condition 6 of planning permission 20/01106/FUL which requires a schematic plan and design specification for the fitting of suitable ventilation and filtration equipment to have been submitted to, and approved in writing, by the Council prior to occupation.
Granted Conditions 11 docs -
42 High Street Epsom Surrey KT19 8AH
Non-Material Amendment to Planning Permission 20/01106/FUL for reduction height of the proposed development
Granted Amendments 13 docs -
McDonald's 36 - 40 High Street Epsom Surrey KT19 8AH
Application for permission to develop land without compliance with condition 2 of planning permission 87/00974/0527 for renewal of consent for variation of opening hours to between 0600 and 0100 hours only at 36-40 (even) High Street, Epsom
Refused Conditions 15 docs -
39 The Oaks Square Waterloo Road Epsom Surrey KT19 8AS
Advertisement consent for new externally illuminated fascia advertising signage
Granted Advertising 3 docs -
39 The Oaks Square Waterloo Road Epsom Surrey KT19 8AS
Replacement of existing shopfront with new anthracite grey bi-fold doors, internal alterations and associated works
Granted Full applications Windows or glazing 3 docs -
Poundland 46 High Street Epsom Surrey KT19 8AJ
87% historically approved · decision due ~23 Sep
Prior Approval Schedule 2, Part 3, Class MA: Change of Use from Commercial, Business and Service (E) to Residential (C3) to create 6 dwelling(s).
Awaiting decisionSeveral homes
Other telecoms applications
In Epsom and Ewell
-
26/00594/NOTTE Granted
Outside 5 Trigo Court Epsom Surrey
Install approximately 36 metre(s) of underground duct and cables
-
26/00430/NOTTE Granted
Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE
Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the replacement of 3no antennas, with 3no new antennas on existing support structure, including the internal upgrade of existing equipment cabinet at ground level, and all ancillary works thereto.
-
26/00414/NOTTE Granted
Telecommunications Mast Derby Stables Road Epsom Surrey KT18 5LE
Notification under the Electronic Communications Code Regulations 2003 (as amended) to utilise permitted development rights for the proposed replacement of an existing base station, comprising the existing timber fencing to be replaced with 2m steel palisade fencing and ancillary development thereto. By replacing an existing base station in the same location at the same height and broadly similar scale the visual impact of the development on the surrounding area has been minimised so far as practicable.
-
26/00222/T56 Refused
Telecommunications Mast - EE Cheam Road Cheam Surrey
Notification Application in terms of Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015: Removal of 1no. existing 6-metre-high lamppost pole with 3no. antennas, 1no. existing equipment cabinet to be replaced with 1no. new 20-metre-high phase 9 pole monopole with wraparound cabinet to accommodate 6no. new antennas, 1no. new GPS node, 2no. new equipment cabinets and associated ancillary works thereto.
-
26/00324/NOTTE Granted
Kiosk And ATM Outside 421 Kingston Road Epsom Surrey
Removal of 1 public payphone outside 421 Kingston Road due to declining usage