Planning application

24/01245/T56

Telecommunications Mast - CTIL Land To The Eastern Side Of Abbots Avenue (South Of Junction With Horton Lane) Epsom Surrey

Granted Epsom and Ewell Telecom Development - Prior Approval

Proposal

Notification Application in terms of Part 16 of Schedule 2 to the Town and Country Planning (General Permitted Development) Order 2015: The installation of 1no. 20m monopole supporting 6no. antennas and 2no. 300mm transmission dishes, the installation of 2no. equipment cabinets and development works ancillary thereto.

As published by the council, reference 24/01245/T56

Timeline

Dates from the published record

  1. 26 Sep 2024

    Received by Epsom and Ewell

  2. 20 Nov 2024

    Decision issued: Prior Approval Required and Permitted

  3. 30 Jul 2026

    Added to PlanIndex

What a grant of permission means

The process from here

Permission has been granted, usually subject to conditions listed on the decision notice, some of which must be discharged before work starts. The decision notice on the council portal sets out exactly what was approved.

Work must normally begin within three years of the decision or the permission lapses. Neighbours cannot appeal a grant; challenging one means judicial review of how the decision was made, within tight time limits.

About telecoms applications

How this application type works

Telecommunications applications cover masts, antennas and cabinets, most of which come forward as prior approval cases under permitted development rules. The council typically has 56 days to consider siting and appearance only. The need for the network itself is treated as established, so objections carry most weight where they address visual impact or siting.

More on telecoms applications in our guide

Nearby applications

Within 500 metres

  • 24/00588/OUT Refused

    Land At Former Horton House Haven Drive Epsom Surrey

    Outline planning application for a dwelling (all matters reserved)

    27 Jun 2024 76m away Outline
  • 24/01210/FLH Granted

    8 Nell Gwynne Close Epsom Surrey KT19 7DA

    Conversion of garage space to habitable use incorporating replacement of garage door with window.

    18 Sep 2024 128m away Householder
  • 26/00617/FLH Granted

    9 William Evans Road Epsom Surrey KT19 7DE

    Replacement of existing rear conservatory with single storey rear extension.

    26 May 2026 259m away Householder
  • 26/00558/FLH Granted

    3 Norris Close Epsom Surrey KT19 8BF

    Erection of single storey rear extension following demolition of existing rear conservatory

    11 May 2026 297m away Householder
  • 26/00325/FLH Refused

    9 Buxton Close Epsom Surrey KT19 8BD

    Conversion of garage to accommodate a habitable space and enclosed front porch extension

    21 May 2026 306m away Householder
  • 22/00010/FUL Refused

    Hobbledown Horton Lane Epsom Surrey KT19 8PT

    Erection of perimeter boundary timber fencing, relocation of entrance gates and installation of gas tank holder (Retrospective)

    18 Jan 2022 338m away Full applications

In Epsom and Ewell

  • 26/00870/NOTTE Awaiting decision

    Telecommunications Mast - CTIL The Chalk Pit College Road Epsom Surrey

    Notification under the Electronic Communications Code Regulations of the intention to remove three existing antennas, install six new antennas, development of ancillary equipment thereto and complete internal upgrades within the equipment cabin at The Chalk Pit, at land off College Road, Epsom KT17 3LZ

    23 Jul 2026 Telecoms
  • 26/00873/NOTTE Awaiting decision

    Telecommunications Mast - EE And 3 Blenheim Road Epsom Surrey

    Notification under the Electronic Communications Code Regulations of the intention to replace three antennas, replace one cabinet, remove one cabinet and development ancillary rewords thereto.

    17 Jul 2026 Telecoms
  • 26/00872/NOTTE Awaiting decision

    Rooftop Of Sorting Office 18 East Street Epsom Surrey KT17 1BB

    Notification under the Electronic Communications Code Regulations of the intention for the removal of the existing 3 antennas and steel supports on the 19.05m roof of the building, replacing them with 6 antennas apertures, 2 on the north corner of the roof, 2 on the southwestern corner and two on the south elevation on new support steelwork giving a max height of 24.32m AGL (5.27m above the plant room roof)

    17 Jul 2026 Telecoms
  • 26/00594/NOTTE Granted

    Outside 5 Trigo Court Epsom Surrey

    Install approximately 36 metre(s) of underground duct and cables

    18 May 2026 Telecoms
  • 23/00283/NOTTE Granted

    Telecommunications Mast And Cabinets Adjacent To Pedestrain Tunnel Dewsbury Gardens Worcester Park Surrey KT4 7AU

    Prior Notification Telecom: Replacement of 2 existing cabinets and associated ancillary works.

    27 Feb 2023 Telecoms