Skip to content
PlanIndex Get alerts
Menu

Planning application

EPF/2086/25

1 Dene Road, Buckhurst Hill, IG9 6BP

Awaiting decision Epping Forest Approval of details reserved by a condition

Proposal

Approval of Details Reserved by Condition 3 Materials of EPF/2541/24 (Demolition of side annexe building. New entrance location, new side and rear extension and loft conversion to existing detached house, and the erection of a stand-alone garden room “log cabin” to the rear).

As published by the council, reference EPF/2086/25

Timeline

Dates from the published record

  1. 13 Oct 2025

    Received by Epping Forest

  2. 27 Oct 2025

    Validated

    Checked as complete and ready for consideration.

  3. 23 Jul 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.

What happens while it is decided

The process from here

This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.

The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.

About conditions applications

How this application type works

This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.

More on conditions applications in our guide

Nearby applications

Within 500 metres

  • EPF/2100/24 Decided

    13 Dene Road, Buckhurst Hill, IG9 6BP

    Certificate of lawful development for the proposed extension of the existing roof dormer by approx 500mm to rear and install glazed door and Juliet balcony.

    17 Oct 2024 0m away Lawful development
  • EPF/1464/25 Granted

    23, Rous Road, Buckhurst Hill, IG9 6BN

    Proposed side, rear and loft extensions (revised application following refusal 12 June 2025-EPF/0773/25).

    18 Jul 2025 84m away Householder
  • EPF/1776/24 Granted

    29, Rous Road, Buckhurst Hill, IG9 6BN

    Rear extension to replace existing conservatory, garage conversion and associated internal and external alteration and refurbishment works.

    30 Aug 2024 84m away Householder
  • EPF/1235/26 Awaiting decision

    13, Rous Road, Buckhurst Hill, IG9 6BL

    Retrospective planning approval for an outbuilding.

    22 Jun 2026 159m away Householder
  • EPF/0169/23 Decided

    8, Rous Road, Buckhurst Hill, IG9 6BL

    Certificate of lawful development for a proposed hip to gable, and rear dormer in connection with a loft conversion.

    26 Jan 2023 159m away Lawful development
  • EPF/1190/26 Awaiting decision

    29, Roding View, Buckhurst Hill, IG9 6AF

    Proposed single-storey rear extension and a two-storey side and rear extension including garage conversion to a habitable room.

    15 Jun 2026 191m away Householder

In Epping Forest

  • EPF/1338/26 Granted

    8, Summerfield Road, Loughton, IG10 4JF

    Approval of Details Reserved by Condition No. 3: Structural Method Statement of EPF/2553/25 (Erection of rear extensions at ground and first floor level, along with excavation of basement, and roof alterations including removal of chimney).

    8 Jul 2026 Conditions
  • EPF/1469/26 Awaiting decision

    Land at Silver Street, Waltham Abbey, EN9 1RJ

    Approval of Details Reserved by Conditions 4 Levels, 5 Types and Colours of External Finishes, 9 Foul and Surface Water, 10 Archaeology and 14 Contaminated Land of EPF/0779/25 (Erection of 1. No x 3-bed chalet bungalow with associated vehicle parking, cycle and bin storage, EV charging and landscaping).

    30 Jul 2026 Conditions
  • EPF/1472/26 Awaiting decision

    Development Land, Oak Hill Road, Stapleford Abbotts, RM4 1JL

    Approval of Details Reserved by Condition 30 Flood Alleviation Scheme of EPF/1769/24 (The erection of 42no residential dwellings together with highway, car parking and associated works).

    30 Jul 2026 Conditions
  • EPF/1466/26 Awaiting decision

    Land Known As The Paddocks, Stanford Rivers Road, Ongar, CM5 9BT

    Approval of Details Reserved by Condition 26 Types and Colours of External Finishes of EPF/1356/24 (Residential development of 36 dwellings including affordable housing, access from Stanford Rivers Road, associated estate roads, parking, open space and enhanced landscaping).

    29 Jul 2026 Conditions
  • EPF/1461/26 Awaiting decision

    Tarrymans, Birds Green, Willingale, Ongar, CM5 0PP

    Approval of Details Reserved by Condition 4 Surface Water Drainage, 6, 7 and 8 Archaeology and 10 Hard and Soft Landscaping of EPF/0575/25 (Demolition of Existing Buildings and Erection of Replacement Dwelling).

    29 Jul 2026 Conditions