Planning application
EPF/1380/26
10, Spareleaze Hill, Loughton, IG10 1BT
Proposal
Approval of Details Reserved by Condition 8 Privacy Screen Details of EPF/1490/25 (Demolition of existing dwelling and replacement).
As published by the council, reference EPF/1380/26
Timeline
Dates from the published record
-
15 Jul 2026
Received by Epping Forest
-
23 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Epping Forest for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About conditions applications
How this application type works
This type of application deals with conditions attached to an existing permission, either by supplying the details a condition requires, called discharging it, or by asking to vary or remove one. It does not reopen the principle of the permission itself. Building often cannot lawfully start, or continue past a set stage, until the named conditions are discharged.
Nearby applications
Within 500 metres
-
EPF/1358/26 Awaiting decision
10, Spareleaze Hill, Loughton, IG10 1BT
Variation of Condition 2 Plan numbers of EPF/1490/25 (Demolition of existing dwelling and replacement).
-
EPF/0504/26 Granted
41, Spareleaze Hill, Loughton, IG10 1BS
Erection of two-storey rear and front extensions, loft conversion, and roof replacement featuring front and rear dormers, removal of chimneys, and alterations to windows and external materials.
-
EPF/1230/26 Awaiting decision
15, Spareleaze Hill, Loughton, IG10 1BS
Proposed extensions, roofing works including solar panels and dormers, boundary treatments and creation of therapy space.
-
EPF/1153/26 Granted
56, Tycehurst Hill, Loughton, IG10 1DA
Amendment to implemented consent (EPF/2274/25), to increase the height of the roof over the south-eastern corner in line with the existing roof form.
-
EPF/2069/25 Granted
32, Alderton Hill, Loughton, IG10 3JB
Construction of two detached dwellings on the same footprint as the consented proposal for a single dwelling.
-
EPF/2000/22 Granted
66, Alderton Hill, Loughton, IG10 3JB
Front and rear extensions + Loft conversion
Other conditions applications
In Epping Forest
-
EPF/1338/26 Granted
8, Summerfield Road, Loughton, IG10 4JF
Approval of Details Reserved by Condition No. 3: Structural Method Statement of EPF/2553/25 (Erection of rear extensions at ground and first floor level, along with excavation of basement, and roof alterations including removal of chimney).
-
EPF/1469/26 Awaiting decision
Land at Silver Street, Waltham Abbey, EN9 1RJ
Approval of Details Reserved by Conditions 4 Levels, 5 Types and Colours of External Finishes, 9 Foul and Surface Water, 10 Archaeology and 14 Contaminated Land of EPF/0779/25 (Erection of 1. No x 3-bed chalet bungalow with associated vehicle parking, cycle and bin storage, EV charging and landscaping).
-
EPF/1472/26 Awaiting decision
Development Land, Oak Hill Road, Stapleford Abbotts, RM4 1JL
Approval of Details Reserved by Condition 30 Flood Alleviation Scheme of EPF/1769/24 (The erection of 42no residential dwellings together with highway, car parking and associated works).
-
EPF/1466/26 Awaiting decision
Land Known As The Paddocks, Stanford Rivers Road, Ongar, CM5 9BT
Approval of Details Reserved by Condition 26 Types and Colours of External Finishes of EPF/1356/24 (Residential development of 36 dwellings including affordable housing, access from Stanford Rivers Road, associated estate roads, parking, open space and enhanced landscaping).
-
EPF/1461/26 Awaiting decision
Tarrymans, Birds Green, Willingale, Ongar, CM5 0PP
Approval of Details Reserved by Condition 4 Surface Water Drainage, 6, 7 and 8 Archaeology and 10 Hard and Soft Landscaping of EPF/0575/25 (Demolition of Existing Buildings and Erection of Replacement Dwelling).