Planning application
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.
Proposal
Details submitted pursuant to ref: 19/02718/RE3 (Plot Z02-01/ Phase 1 only): surface water verification report (33), in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
As published by the council, reference 26/04322/CND
Application record
- Reference
- 26/04322/CND
- Status
- Application in Progress
- Received
- 9 Oct 2026
- Validated
- 9 Oct 2026
- Postcode
- N18 3BZ
Site history
Applications at this address on the Enfield register
This site has had 8 applications since 2023: 5 approved, 0 refused.
-
26/02884/CND Granted
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
PARTIAL DISCHARGE: Details submitted pursuant to reference 19/02718/RE3: borehole decommissioning (21) in relation to Phase 1/ plot Z02-01 only in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
26/02868/CND Granted
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3 (Plot Z02-01/ Phase 1 only): Delivery and servicing plan (55), in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
26/02448/CND Withdrawn
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3: in respect of landscape management plan (67) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
26/02447/CND Decided
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3 (Plot Z02-01/ Phase 1 only): flood evacuation report (34) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
23/03803/CND Granted
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3: details of the siting and design of refuse and recycling facilities (61) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
23/03804/CND Granted
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3: schedule of tenure/mix per phase (36) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to three forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
-
23/02646/NMA Granted
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Non-material amendment for ref: 19/02718/RE3 granted 31/03/2022 for the Phase 2 Redevelopment of Meridian Water to allow amendments to the Protected Frontages and Predominant Land Use at Ground Floor parameter plans in respect of Plot Z02-01 only granted RMA under 22/02098/RM.
Timeline
Dates from the published record
-
9 Oct 2026
Received by Enfield
-
16 Oct 2026
Added to PlanIndex
-
Decision
Awaiting decision
Decision expected by 4 December 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.
Enfield took a median of 58 days over the applications it decided in the last year.
What happens while it is decided
This application is with Enfield for determination, against a statutory target of eight weeks. Over the last year Enfield's median decision took 58 days. More in our guide to how long planning decisions take.
About this record
The published feed does not state which type of application this is; the register entry on Enfield's portal will say. Our guide explains the common types.
Nearby applications
Within 0.3 miles
-
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
75% historically approved · decision due ~5 Aug
Details submitted pursuant to reference 19/02718/RE3: in respect of landscape management plan (67) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Withdrawn -
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
Details submitted pursuant to reference 19/02718/RE3 (Plot Z02-01/ Phase 1 only): Delivery and servicing plan (55), in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Granted 2 docs -
Meridian Water Orbital Business Park (and Adjoining Land Including Land South Of Argon Road And Land Known As Ikea Clear And Gas Holder Leeside Road) 5 Argon Road London N18 3BZ
75% historically approved · decision due ~5 Aug
Details submitted pursuant to reference 19/02718/RE3 (Plot Z02-01/ Phase 1 only): flood evacuation report (34) in respect of development of Phase 2 of Meridian Water comprising residential (Class C3), Purpose Built Student Accommodation and/or Large-Scale Purpose-Built Shared Living (Sui Generis); hotel (Class C1), commercial development (Class B1a,b,c); retail (Class A1 and/or A2 and/or A3 and/or A4), social infrastructure (Class D1 and/or D2), a primary school up to thrdee forms of entry, hard and soft landscaping, new public open spaces including equipped areas for play, sustainable drainage systems, car parking provision, and formation of new pedestrian and vehicular access (all matters reserved), and a substation (Sui Generis).
Decided -
Ravenside Retail Park 1 Ravenside Close London N18 3BH
Details submitted pursuant to reference 21/04156/FUL: external materials (3), wash bay area (4), blue badge parking spaces (5), cycle parking (6) and refuse and recycling storage (9) in respect of change of use of the building from Retail (Class E) to servicing centre and car showroom (sui generis).
Granted Conditions 17 docs -
Ravenside Retail Park 1 Ravenside Close London N18 3BH
Construction of external washbay canopy to the rear of the site , installation of external bicycle canopy to the front of the site, installation of new fencing to rear of site to create secure service yard including two sets of double gates, installation of 2 new secure lockable pedestrian gates with emergency escape mechanisms , installation of new fencing and single lockable gate to create waste storage area to the rear of the service yard, renewing of existing car parking floor marking, including new disabled bay markings and additional one way floor marking and pedestrian walkway markings, new security drop bollards to the site entrance, installation of 8 posts for mounting car charging facilities to the front of the site, ground works in front of main showroom entrance in order to drop the existing curb to provide vehicle access for display cars to the showroom, installation of 3 new windows to the main elevation, installation of new showroom glazed entrance doors, recladding of building totem, repainting of recessed proportion of main facade in dark grey, replacement of existing roller shutter door - replaced with dark grey automatic roll up door with vision panel at low level, installation of new roll up door to the right of existing door to match replacement and mounting of 4 vehicle wall chargers to service yard elevation.
Granted Full applications Windows or glazing 26 docs -
Ravenside Retail Park 1 Ravenside Close London N18 3BH
Installation of 1x internally illuminated totem sign, 1x non-illuminated post mounted wayfinding sign, internally illuminated lettering to front elevation, 1x non-illuminated wall mounted fascia, installation of 4x internally illuminated graphic banner signs to front, rear and side elevations, 1x internally illuminated wall mounted fascia, 3x vinyls to front entrance doors and 12 wall and post mounted signs for electrical vehicle charging.
Granted Advertising 13 docs