Edmonton Green Shopping Centre And Adjoining Land (bounded By Fore Street/The Broadway, Hertford Road, Monmouth Road And Plevna Road), Enfield, N9

Granted Enfield 20/04187/OUT Outline

Works: Demolition

Permission granted. Work must normally begin within three years of the decision or the permission lapses.

Proposal

HYBRID PLANNING APPLICATION for the following: DETAILED planning application for Phase 1, for the demolition of the existing car park, access road and parking ramp that serves the roof of 1 West Mall, Edmonton, London N9 0AL (Asda) building and structures for erection of mixed-use buildings providing ground floor flexible commercial use floorspace (use class E), residential units (use class C3), infrastructure landscaped amenity space, car parking, cycle parking and associated works; and A phased OUTLINE planning application (Phases 2-4) (all matters reserved) for the balance of the site for: 1. The proposed demolition of buildings and structures; 2. The erection of buildings, including tall buildings, and works of alteration to existing buildings for the following uses: a) Flexible Commercial Floorspace (Use Class E); b) Bars/drinking establishments, Hot Food Takeaways and Leisure Uses (Use Class Sui Generis); c) Covered Market (Use Class E); d) Community and Leisure (Use Classes F1, F2 and Sui Generis); e) Residential Floorspace and the remodelling of existing residential entrance space for Grampian, Mendip and Pennine Houses (Use Class C3); 3. Associated infrastructure; 4. Streets, open spaces, landscaping and public realm; 5. Car, motorcycle and bicycle parking spaces and delivery/servicing spaces; 6. Utilities including electricity substations; and 7. Other works incidental to the proposed development. An Environmental Statement (and Addendum), including an updated non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended).

As published by the council, reference 20/04187/OUT

Application record

Reference
20/04187/OUT
Type
Outline
Status
Decided
Decision
Hybrid approval granted with conditions
Received
23 Dec 2020
Validated
12 Jan 2021
Decided
18 Nov 2022
Ward
Edmonton Green
Decision by
Committee Decision
Postcode
N9 0TZ

Site history

Applications at this address on the Enfield register

This site has had 2 applications since 2020: 2 approved, 0 refused.

  • 25/02309/NMA Granted

    Edmonton Green Shopping Centre And Adjoining Land (bounded By Fore Street/The Broadway, Hertford Road, Monmouth Road And Plevna Road), Enfield, N9

    Non material amendment to 20/04187/OUT to allow alterations to the Description of Development and wording of Condition D/O2, D2, D/O3, and D/O10 in order to introduce a Phase 0 into the consented scheme to enable the implementation of the extant planning permission.

    Decided 6 Aug 2026 Amendments

Timeline

Dates from the published record

  1. 23 Dec 2020

    Received by Enfield

  2. 12 Jan 2021

    Validated

    Checked as complete and ready for consideration.

  3. 18 Nov 2022

    Decision issued: Hybrid approval granted with conditions

  4. 4 Sep 2026

    Added to PlanIndex

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 25/02309/NMA Granted

    Edmonton Green Shopping Centre And Adjoining Land (bounded By Fore Street/The Broadway, Hertford Road, Monmouth Road And Plevna Road), Enfield, N9

    Non material amendment to 20/04187/OUT to allow alterations to the Description of Development and wording of Condition D/O2, D2, D/O3, and D/O10 in order to introduce a Phase 0 into the consented scheme to enable the implementation of the extant planning permission.

    Decided 6 Aug 2026 Amendments

Who's behind it

Company information only, from the register and Companies House

Agent on file, registered in London

1,780 applications on PlanIndex · across 174 councils · 92% granted

Trade members see who it is, their full track record, and every application they have filed.

See who's behind it

Documents

Plans, drawings, consultee responses and the officer's report

662 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What this grant of permission means

Enfield granted permission on 18 November 2022, subject to any conditions on the decision notice. Work must normally begin within three years or the permission lapses. More in our guide to what happens after a planning decision.

About outline applications

An outline application tests the principle of developing a site, holding back details such as appearance and landscaping as reserved matters for later approval. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Edmonton Green Shopping Centre And Adjoining Land (bounded By Fore Street/The Broadway, Hertford Road, Monmouth Road And Plevna Road), Enfield, N9

    25/02309/NMA Submitted 2 Jul 2025 0m away

    Non material amendment to 20/04187/OUT to allow alterations to the Description of Development and wording of Condition D/O2, D2, D/O3, and D/O10 in order to introduce a Phase 0 into the consented scheme to enable the implementation of the extant planning permission.

    Granted Amendments 11 docs
  • 45-47 South Mall Edmonton Green Shopping Centre London N9 0TT

    20/02685/FUL Submitted 24 Aug 2020 34m away

    Change of use from retail (Class E) to bingo premises (sui generis) involving erection of a smoking area to rear with decking.

    Refused Full applications 14 docs
  • Edmonton Green Town Centre London N9 0SN

    20/02875/SCOP Submitted 4 Sep 2020 42m away

    Request under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for an EIA Scoping Opinion for a proposed residential led mixed-use scheme of up to 1,850 additional residential homes and commercial floorspace of approximately 25,000m2 (NIA) located within buildings ranging from 1 to 35-storeys in height.

    Decided Outline 11 docs
  • 16B The Concourse London N9 0TY

    23/03610/ADV Submitted 6 Nov 2023 49m away

    Installation of 2x internally illuminated and 2x non-illuminated fascia signage together with 2x externally illuminated projecting signage and installation of vinyl to shop front.

    Granted Advertising Windows or glazing 9 docs
  • 62 Market Square London N9 0TZ

    23/03977/ADV Submitted 4 Dec 2023 113m away

    Installation of internally illuminated fascia sign and non-illuminated projecting box sign.

    Granted Advertising 6 docs
  • Land West Of The Broadway The Broadway N9

    23/04124/CEA Submitted 19 Dec 2023 161m away

    Erection of temporary outdoor pavilion structure and installation of five display platforms, display cabinet in the area adjacent to the pavilion, existing footpath to be extended up to the pavilion for access adding 1.2 sq.m of additional hardstanding.

    Granted Lawful development 15 docs

In Enfield

  • 26/00883/SCOP Decided

    Palace Gardens Enfield EN2 6SN

    Request under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for an EIA Scoping Opinion for the proposed demolition and phased redevelopment of a mixed-use residential scheme including up to 350 residential units across up to six buildings on the upper floors, ranging from 4-15 storeys in height.

    5 Mar 2026 Outline
  • 25/04330/OUT Awaiting decision

    Southbury Leisure Park Enfield London EN1 1YQ

    Hybrid planning application (part detailed/part outline) for the demolition of all existing buildings and structures, site preparation works and the phased comprehensive redevelopment of part of Southbury Leisure Park comprising: Detailed Planning Application for the demolition of all buildings/structures and the removal of all existing car parking spaces across the entire application site, the re-provision of car parking spaces (for third party use), and the phased construction of two development plots delivering residential (Class C3) and flexible commercial / community uses (Classes E, F.1, and/or F.2), alongside all associated parking, plant, infrastructure, access, and hard and soft landscaping (which will deliver public realm, a new linear park, circulation routes, amenity areas, ecological enhancements and play space). Outline Planning Application (with some matters reserved- appearance, landscaping, layout, scale) for the phased construction of two development plots delivering residential (Class C3) and flexible commercial / community uses (Classes E, F.1, and/or F.2), alongside all associated parking, plant, infrastructure, access, and hard and soft landscaping (which will deliver public realm, circulation routes, amenity areas, ecological enhancements and play space). (An Environmental Statement, including a non-technical summary, also accompanies the planning application in accordance with the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended)).

    16 Dec 2025 Outline
  • 25/04214/OUT Awaiting decision

    8 The Coppice Enfield EN2 7BY

    Sub-division of site and erection of a detached 2-storey dwelling at side (OUTLINE-all matters reserved).

    5 Dec 2025 Outline
  • 22/01542/OUT Granted

    Anglo Aquarium Plant 30 And 32 Strayfield Road Enfield EN2 9JE

    Outline application with all matters reserved except for access for the demolition of existing buildings, structures and removal of open storage, and construction of up to 58 affordable dwellings, 5 live-work units (Use Class Sui Generis) and refurbishment of existing office building to provide flexible, serviced office space, along with associated landscaping and access.

    3 May 2022 Outline
  • 24/00395/SCOP Decided

    Alma Estate Enfield EN3

    Request under Regulation 15 of the Town and Country Planning (Environmental Impact Assessment) Regulations 2017 (as amended) for an EIA Scoping Opinion for comprehensive redevelopment of the Site to provide a residential-led development.

    2 Feb 2024 Outline