Skip to content
PlanIndex Get alerts
Menu

Planning application

Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

Awaiting decision Elmbridge 2026/1470 Listed Building Consent

Still open. Anyone can comment while the consultation period runs, and comments go to the council rather than to us.

Proposal

Change of use of building from place of worship (Class F1) with ancillary residential flat to single self contained three bedroomed dwelling (Class C3) together with internal and external alterations with replacement of pedestrian access gate in association with application for planning permission 2026/1466.

As published by the council, reference 2026/1470

Application record

Reference
2026/1470
Type
Listed Building Consent
Status
Registered
Received
17 Jun 2026
Validated
7 Sep 2026
Ward
Esher Ward
Decision by
Officer delegated
Postcode
KT10 9DP

Comment by 9 October 2026

The council is taking comments on this application until then. Comments go to Elmbridge through their own planning portal.

Site history

Applications at this address on the Elmbridge register

This site has had 3 applications since 2024: 1 approved, 0 refused.

  • 2026/1466 Awaiting decision

    Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

    Change of use of building from place of worship (Class F1) with ancillary residential flat to single self contained three bedroomed dwelling (Class C3) together with internal and external alterations with replacement of pedestrian access gate in association with application for Listed Building Consent 2026/1470.

    Submitted 17 Jun 2026 Full applications
  • 2024/0060 Granted

    Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

    Esher Conservation Area - Height reduction 1 x Cypruss by 3.5m, crown reduce 1 x Hornbeam by 1.5m and crown reduce 1 x Camillla by 2.5m

    Decided 12 Feb 2024 Trees

Timeline

Dates from the published record

  1. 17 Jun 2026

    Received by Elmbridge

  2. 7 Sep 2026

    Validated

    Checked as complete and ready for consideration.

  3. 11 Sep 2026

    Added to PlanIndex

  4. Decision

    Awaiting decision

    Decision expected by 2 November 2026, 8 weeks from validation under the statutory target for most applications. Extensions of time are common and are agreed case by case.

    Elmbridge took a median of 62 days over the applications it decided in the last year.

Cases linked to this one on the register

1 later application on the register refers to this one:

  • 2026/1466 Awaiting decision

    Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

    Change of use of building from place of worship (Class F1) with ancillary residential flat to single self contained three bedroomed dwelling (Class C3) together with internal and external alterations with replacement of pedestrian access gate in association with application for Listed Building Consent 2026/1470.

    Submitted 17 Jun 2026 Full applications

Documents

Plans, drawings, consultee responses and the officer's report

22 documents on file for this application

A planning file usually holds the application form, drawings and site plans, consultee responses, the officer's report and the decision notice.

Trade members open them from here.

Open the documents

What happens while it is decided

This application is with Elmbridge for determination, against a statutory target of eight weeks. Over the last year Elmbridge decided heritage and listed building applications in a median of 104 days. More in our guide to how long planning decisions take.

About heritage and listed building applications

Listed building consent is needed for works that affect the special interest of a listed building, and carrying out such works without it is a criminal offence. More in our guide to planning application types.

Nearby applications

Within 500 metres

  • Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

    2026/1466 Submitted 17 Jun 2026 0m away

    70% historically approved · decision due ~2 Nov

    Change of use of building from place of worship (Class F1) with ancillary residential flat to single self contained three bedroomed dwelling (Class C3) together with internal and external alterations with replacement of pedestrian access gate in association with application for Listed Building Consent 2026/1470.

    Awaiting decision Full applications 22 docs
    Domestic
  • Friends Meeting House 3 Claremont Lane Esher Surrey KT10 9DP

    2024/0060 Submitted 10 Jan 2024 0m away

    Esher Conservation Area - Height reduction 1 x Cypruss by 3.5m, crown reduce 1 x Hornbeam by 1.5m and crown reduce 1 x Camillla by 2.5m

    Granted Trees 3 docs
  • Victoria Place Esher Park Avenue Esher Surrey KT10 9PX

    2024/0594 Submitted 6 Mar 2024 31m away

    Esher Conservation Area - Fell 4 x Tulip, Tibetan Cherry, Snake Bark and Norway Maple.

    Granted Trees 4 docs
  • Victoria Place Esher Park Avenue Esher Surrey KT10 9PX

    2023/1395 Submitted 12 May 2023 31m away

    Esher Conservation Area - Fell 2 x Birch trees.

    Granted Trees 5 docs
  • Alstonfield Claremont Lane Esher Surrey KT10 9DP

    2026/0077 Submitted 13 Jan 2026 38m away

    Tree Preservation Order EL:90/05 - 4. London Plane beyond rear boundary in neighbours - Partial Crown Reduction. Reducing the height of the central stem by 2-3 metres and the lateral spread to the north by up to 3.5 metres blending to the remain parts of the canopy. All pruning cuts shall be made to suitable secondary growth points and shall maintain a stable platform for the expected regrowth 22x19m down to 20x15.5m Encroaching on neighbouring property, overshadowing the rear flats and gardens of Carrington Place

    Granted Trees 5 docs
  • Clare Hill Court 2 Claremont Lane Esher Surrey KT10 9DW

    2026/2005 Submitted 17 Aug 2026 52m away

    89% historically approved · decision due ~21 Oct

    Tree Preservation Order EL:11/16 - 1.Turkey oak by rear LH corner of building. Cut back from building to give 3 metres clearance and reduce upper lateral branches to west over building by 3m Approx to reduce away from over building. - REASONS FOR WORKS - To prevent damage to the new property

    Awaiting decision Trees 5 docs

In Elmbridge

  • 2025/2535 Granted

    Mole Cottage 15 Church Street Cobham Surrey KT11 3EG

    Installation of a 500mm diameter Blue Plaque at 2400mm from ground level on side of building to face pavement.

    26 Sep 2025 Heritage and listed buildings
  • 2026/2127 Awaiting decision

    Cedar House Mill Road Cobham KT11 3AL

    Listed Building Consent: Retention of works to House B comprising structural strengthening works within the kitchen; the lifting and relaying of ground-floor finishes and installation of underfloor heating within the kitchen, Great Hall and entrance hall; and alterations to the first-floor gallery floor, including a plywood infill at the former stair opening.

    2 Sep 2026 Heritage and listed buildings
  • 2026/2112 Awaiting decision

    United Reformed Church Queens Road Weybridge Surrey KT13 9UX

    Listed Building Consent: Refurbishment of road frontage fencing, pedestrian and vehicle gates.

    1 Sep 2026 Heritage and listed buildings
  • 2026/2083 Awaiting decision

    Quillets Royal Bell Road East Molesey Surrey KT8 0SS

    Listed Building Consent: To install a replacement larger capacity guttering along the front of the house to improve the collection and discharge of rainwater, as current one fails in heavy rain.

    25 Aug 2026 Heritage and listed buildings
  • 2026/0680 Granted

    8 Yew Tree Cottage Portsmouth Road Esher Surrey KT10 9AL

    Listed Building Consent for the removal of spray foam insulation and repair and re-roofing of the main roof of the property using natural clay pantiles. The existing main roof covering consists of later concrete tiles which are not historically appropriate. The proposal is to remove these and reinstate natural clay pantiles to match the historic roof covering referenced in the listing description and visible on the adjoining cottage. The catslide extension, currently covered with concrete tiles, will not be altered as part of this proposal.

    20 Mar 2026 Heritage and listed buildings