Planning application
2025/3008
Land Bounded By Clayton Road, Kingston Bypass (A309), Esher Bypass (A3) And Recreational Facilities To The East (known AsHook Park)
Proposal
Consultation from Royal Borough of Kingston: Outline application for a phased development including demolition of existing structures and the provision of new homes (Use Classes C2 and C3), non-residential uses (Use Classes E, F and Sui Generis), open spaces and other ancillary infrastructure. (All Matters reserved except for Access.) Cross boundary application with Elmbridge Borough Council. Application accompanied by an Environmental Statement.
As published by the council, reference 2025/3008
Timeline
Dates from the published record
-
20 Nov 2025
Received by Elmbridge
-
30 Jul 2026
Added to PlanIndex
-
Decision
Awaiting decision
The statutory target is eight weeks for most applications and thirteen for major development. Extensions of time are common.
What happens while it is decided
The process from here
This application is with Elmbridge for determination. The council publicises it, consults neighbours and technical bodies where required, and weighs the responses against local and national planning policy.
The statutory target is eight weeks for most applications and thirteen for major development, though extensions of time are common. Comments carry most weight while the case is undecided, so check the council portal for the deadline if you want to respond.
About this record
Reading the register
This page mirrors an entry on the statutory planning register that Elmbridge is required to keep. The published feed for this record does not state which type of application it is, which is common for older entries and for some council systems; the register entry on the council portal will say, alongside the case officer and any consultation dates.
Every planning application follows the same broad path: submission, validation, publicity, then a decision by officers or committee. Our guide to planning application types explains the common types and what each can approve.
Nearby applications
Within 500 metres
-
2026/1789 Awaiting decision
Land At Wisley Airfield Hatch Lane Ockham GU23 6NU
Consultation from Guildford Borough Council: Reserved Matters Application for details of access, appearance, landscaping, layout and scale following Outline permission 22/P/01175 of Phase 8.1: INF3a comprising 2FE Primary School and nursery, associated landscaping including playing field, hardstanding and Multi Use Games Area, Car and cycle parking, and electric sub-station.
-
2026/0872 Granted
Land At West Hall Parvis Road West Byfleet Surrey
Consultation from Woking Borough Council: Hybrid planning application (part outline, part full planning application) for residential development (Class C3) for up to 461no. residential units and delivery of 12no. traveller pitches and associated infrastructure including groundworks, car parking, open space and landscaping and new vehicular access via a new [roundabout] access junction from the A245 Parvis Road and highway works to be provided in phases; including full planning application for the detailed phase(s) comprising: construction of 253no. residential units (Class C3) and change of use of land for the provision of 12no. traveller pitches and associated infrastructure including groundworks, car parking, open space and landscaping and new vehicular access via a new [roundabout] access junction from the A245 Parvis Road and highway works (Environmental Statement submitted) (Environmental Statement Addendum, amended description, further information and amended/additional plans received March 2026).
-
2026/1152 Granted
Land Adjacent To Sunnyside Reservoir Lower Hampton Road, Hampton
Consultation from London Borough of Richmond Upon Thames: Outline application to replace storage buildings and associated hardstanding with single detached dwellinghouse (LPA reference PA25/2597). Proposal Subject to Appeal Reference 6008728.
-
2026/1685 Awaiting decision
Southborough High School Playing Field Brook Road Tolworth
Consultation from Royal Borough Of Kingston: Creation of a full size 3G sports pitch with associated fencing, earthworks, 6 nos floodlights, storage container; relocation and reorientation of non-turf cricket wicket; creation of attenuation pond and associated drainage; installation of new cycle shelters; new car park with vehicular and pedestrian / cycle access off Hook Road; and associated pathways, landscaping and lighting. at Southborough High School Playing Field Brook Road Tolworth. [26/01183/FUL]
-
2026/1018 Granted
Land At West Farm Winchester Road Popham Micheldever Hampshire
Consultation from Baskingstoke and Deane Borough Council: Part A: Full planning permission for a new roundabout access from the A33; internal spine road, creation of development plots with associated earthworks and plateauing; delivery of lateaus and access for associated development plots; site-wide structural landscaping andinfrastructure; and a single warehouse (Use Class B8) and ancillary office, with associated access, hardstanding, landscaping, parking and supporting infrastructure.Part B: Outline planning permission with all matters reserved for the development of employment floorspace falling within Use Classes B2 and B8, with ancillary office space on the development plots; community and leisure uses within Use Classes E, F1 and F2; ground mounted solar within Use Class Sui Generis up to 15MW; EnergyCentre within Use Class Sui Generis; HGV Parking and Welfare Area within Use Class Sui Generis; as established through Part A of this application. [26/00526/FUL]
-
2026/0735 Granted
Platts Eyot Lower Sunbury Road Hampton
Consultation from London Borough of Richmond upon Thames: Retrospective application for installation of new piling to the riverbank at south/south west corner of Platts Eyot. [PA25/4118]