Planning application

2024/3328

3 Green Lane Cobham Surrey KT11 2NN

Refused Elmbridge Full Application

Proposal

Demolition of the existing dwellinghouse and outbuildings and construction of three detached two-storey buildings (with roof space) forming 15 self-contained flats; air source heat pumps, solar panels; private amenity space; reinstatement of the existing crossover and creation of a new crossover to form vehicular access leading to parking to the rear; alteration and creation of new accesses; hard and soft landscaping including boundary treatment and external lighting; land level alterations; cycle and refuse/recycle provision

As published by the council, reference 2024/3328

Timeline

Dates from the published record

  1. 23 Dec 2024

    Received by Elmbridge

  2. 29 Jan 2025

    Validated

    Checked as complete and ready for consideration.

  3. 29 Apr 2025

    Decision issued: Refuse Planning Permission

  4. 30 Jul 2026

    Added to PlanIndex

What refusal means

The process from here

The council refused this application for the reasons set out on the decision notice, which the council portal holds in full. Only the applicant can appeal a refusal; the time limit runs from the decision date and is shorter for householder schemes.

Refusal does not prevent a fresh attempt. Applicants often address the reasons for refusal and resubmit, so a refused scheme is not necessarily the end of proposals for the site.

About full applications applications

How this application type works

A full application seeks permission for a complete, detailed proposal in one go: siting, design, access and landscaping are all fixed at this stage. It is the standard route for new buildings, conversions and changes of use. The statutory target is eight weeks for smaller schemes and thirteen weeks for major development, though complex cases often take longer by agreement.

More on full applications applications in our guide

Nearby applications

Within 500 metres

  • 2025/0243 Refused

    8 Green Lane Cobham Surrey KT11 2NN

    Tree Preservation Order EL:11/06 - T1- English Oak (quercus robur), situated in the front of the property in a North Westerly direction. The client proposes a re-reduction by approximately 3m as part of the trees ongoing maintenance. It is currently approximately 20m high and 17m wide and will be 17m high and 14m wide following the proposed works.

    29 Jan 2025 86m away Trees
  • 2026/0247 Granted

    Border of 10 and 12 Green Lane Cobham KT11 2NN

    5 Day Notice For Dead Or Dangerous Tree Species: Sweet Chestnut, Height: Approx. 14m TPO Reference: EL:11/06 Location: Border of 10 and 12 Green Lane, Cobham, KT11 2NN.

    29 Jan 2026 101m away Trees
  • 2021/1742 Granted

    Crow Gables Cottage 133 Fairmile Lane Cobham Surrey KT11 2BU

    Variation of Condition: 2 (Approved Plans) of planning permission 2019/2308 (Terrace of 4 houses) to remove the proposed front bay windows from the properties and alter fenestration and finish.

    13 May 2021 110m away Amendments
  • 2026/1664 Awaiting decision

    12 Green Lane Cobham Surrey KT11 2NN

    Enlargement of rear first-floor window.

    7 Jul 2026 124m away Lawful development
  • 2025/2454 Withdrawn

    12 Green Lane Cobham Surrey KT11 2NN

    Single-storey front and rear extensions, first-floor side extension, rear dormer window enlargement and hard and soft landscaping following removal of chimney stack.

    24 Sep 2025 124m away Householder
  • 2025/0172 Granted

    17 Green Lane Cobham Surrey KT11 2NN

    Tree Preservation Order EL:25/02 - T1 Scott's Pine in Rear garden-Fell Tree is in a very poor location, in very close proximity to the house and neighbours Driveway. Client has suspicions of tree causing subsidence. Prior to the Tree gaining a tree preservation order, the tree had started to get dismantled, with many of the lower branches "flush cut" to the main stem and also Spur marks to gain access into the canopy. There is a large Defect at the base on the house side of the tree, from where a section of the bark is removed and damaged the Cambium, to enable the friction/lowering device to be fitted. I imagine these defects may end up leading to decay or decline and due to the tree being within striking distance of there house and also the neighbours garage, it may become dangerous in the near future. Due to this, I would like to apply to Fell the remainder of the Tree and replant a suitable Replacement in a better position within the garden.

    22 Jan 2025 124m away Trees

In Elmbridge

  • 2026/1360 Refused

    1A Rydens Grove Hersham Walton-On-Thames Surrey KT12 5RX

    Detached single-storey building for light industrial use (Class E(g)(iii)) with residential unit (C3) following demolition of existing building (Class E)

    8 Jun 2026 Full applications
  • 2025/3161 Granted

    22A and 22B High Street Cobham Surrey KT11 3EB

    Construction of a second and third floor to create 8 self-contained flats with private amenity space, two-storey rear extension to accommodate access and internal stairs; construction of a single storey rear outbuilding for cycle and refuse/recycle provision; re-provision of parking to the rear and hard/soft landscaping including green roofs.

    3 Dec 2025 Full applications
  • 2026/1049 Refused

    Ridgemount Devonshire Road Weybridge Surrey KT13 8HB

    Installation of new 2 metre (maximum) high east boundary wall with one new 1.9 metre high pedestrial gate and two new 1.9 metre high vehicular gates, following the removal of the existing 1.2 metre high east boundary wall.

    5 May 2026 Full applications
  • 2026/0079 Granted

    Flat 1 3A Bridge Road East Molesey Surrey KT8 9EU

    Construction of a third floor self-contained residential flat with an increase in roof ridge height, dormer windows and private amenity space.

    13 Jan 2026 Full applications
  • 2026/0911 Granted

    49A Church Street Weybridge Surrey KT13 8DG

    Replacement of nine single-glazed timber windows with timber effect double-glazed uPVC windows to match the appearance of the existing windows.

    17 Apr 2026 Full applications